Gosalia Concrete Constructors, Inc.: FDOT bid record
Gosalia Concrete Constructors, Inc. submitted 49 bids on Florida DOT contracts in the data, from 31 JAN 2018 to 28 OCT 2026, and was the low bidder on 18 of them (37%). When it was not low, its total sat a median +10% above the low bid.
- Owner
- Florida DOT
- Low bid volume
- $131,435,248
- Latest bid
- 28 OCT 2026
- Data through
- 28 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2018 | 4 | 1 | 25% |
| 2019 | 5 | 1 | 20% |
| 2020 | 8 | 3 | 38% |
| 2021 | 7 | 1 | 14% |
| 2022 | 3 | 2 | 67% |
| 2023 | 4 | 3 | 75% |
| 2024 | 8 | 2 | 25% |
| 2025 | 6 | 3 | 50% |
| 2026 | 4 | 2 | 50% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| District 7 | 25 | 10 | 40% |
| District 1 | 12 | 4 | 33% |
| District 2 | 4 | 2 | 50% |
| District 5 | 3 | 1 | 33% |
| District 3 | 3 | 1 | 33% |
| StateWide | 1 | 0 | 0% |
| District 6 | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Channelizing device- types I, II, VP, drum, or LCD | 0102-74-1 | ED | 48 | 35 (73%) | $0.10 | $0.13 |
| Pull & splice box, F&I, 13" X 24" cover size | 0635-2-11 | EACH | 55 | 32 (58%) | $950.00 | $1,150.00 |
| Work zone sign | 0102-60 | ED | 49 | 29 (59%) | $0.21 | $0.25 |
| Portable changeable message sign, temporary | 0102-99 | ED | 47 | 29 (62%) | $10.00 | $12.00 |
| Performance turf, sod | 0570-1-2 | SY | 41 | 27 (66%) | $3.00 | $5.00 |
| Arrow board / advance warning arrow panel | 0102-76 | ED | 37 | 24 (65%) | $5.00 | $5.90 |
| Conduit, furnish & install, directional bore | 0630-2-12 | LF | 53 | 23 (43%) | $31.37 | $30.82 |
| Inlet protection system | 0104-18 | EACH | 41 | 23 (56%) | $110.00 | $150.00 |
| Raised pavement marker, type B | 0706-1-3 | EACH | 38 | 22 (58%) | $4.10 | $5.00 |
| Sediment barrier | 0104-10-3 | LF | 42 | 20 (48%) | $1.50 | $2.60 |
| Type III barricade | 0102-115 | ED | 31 | 20 (65%) | $0.28 | $0.34 |
| Thermoplastic, standard-other surfaces, yellow, solid, 6" | 0711-16201 | GM | 36 | 19 (53%) | $5,085.50 | $5,200.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Ajax Paving Industries of Florida LLC | 18 | 8 of 18 |
| Watson Civil Construction, Inc. | 13 | 5 of 13 |
| C.W. Roberts Contracting, Inc. | 13 | 6 of 13 |
| Superior Construction Company Southeast, LLC | 9 | 2 of 9 |
| Webber, LLC | 9 | 2 of 9 |
| Russell Engineering, Inc. | 8 | 4 of 8 |
| Cone & Graham, Inc. | 7 | 2 of 7 |
| Preferred Materials Inc. | 7 | 3 of 7 |
| De Moya Highway Infrastructure LLC | 7 | 0 of 7 |
| Commercial Industrial Corp. | 6 | 0 of 6 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 28 OCT 2026 | T1947 | District 1 | 43975025201 | 4 of 4 | $18,760,314 | +14% |
| 25 MAR 2026 | T7586 | District 7 | SR 39 (JAMES L REDMAN PKWY) FROM S OF RAYBURN RD TO N OF... | 1 of 6 | $3,945,047 | Low, 5.0% under the second |
| 25 FEB 2026 | T2A37 | District 2 | SR 228 FROM HART BRIDGE TO BEACH BLVD | 1 of 5 | $17,205,225 | Low, 9.0% under the second |
| 28 JAN 2026 | T7577 | District 7 | SR 50 (US 98 / CORTEZ BLVD) AT MONDON HILL RD | 4 of 7 | $9,767,819 | +3.0% |
| 29 OCT 2025 | T3975 | District 3 | SR 71 (CECIL G COSTINS BLVD) FROM SR 30 (US 98) TO S OF... | 3 of 5 | $2,157,000 | +4.0% |
| 24 SEP 2025 | T6592 | District 6 | SR 886 (PORT BLVD) FROM BISCAYNE BLVD TO PORT OF MIAMI | 2 of 7 | $3,867,097 | +7.0% |
| 11 JUN 2025 | T7542 | District 7 | SR 687 (4TH ST N) FROM SR 694 (GANDY BLVD) TO BIG ISLAND GAP | 1 of 9 | $4,497,500 | Low, 3.0% under the second |
| 11 JUN 2025 | T7563 | District 7 | SR 39 (JAMES L REDMAN PKWY) AT TRAPNELL RD | 2 of 5 | $8,347,298 | +4.0% |
| 26 MAR 2025 | T7547 | District 7 | SR 595 (ALT US 19 / TYRONE BLVD) FROM 5TH AVE N TO PARK ST N | 1 of 3 | $11,332,332 | Low, 20% under the second |
| 29 JAN 2025 | T7558 | District 7 | SR 43 (US 301) AT SYMMES ROAD AND AT SHADY PRESERVE DR | 1 of 5 | $13,569,477 | Low, 2.0% under the second |
| 28 AUG 2024 | T1874 | District 1 | CR 664, BRIDGE NO 060034 OVER LITTLE PAYNE CREEK | 4 of 8 | $3,667,118 | +32% |
| 28 AUG 2024 | T7546 | District 7 | SR 594 (I-75) FROM 16TH ST S TO 4TH ST | 2 of 3 | $5,532,177 | +3.0% |
| 28 AUG 2024 | T9040 | StateWide | SR 93 (I-75) AT PUNTA GORDA NB AND SB WEIGH STATIONS | 3 of 6 | $14,289,310 | +3.0% |
| 31 JUL 2024 | T2946 | District 2 | SR 9 (I-95) FROM FOREST ST BRIDGE TO RAILROAD BRIDGE AND... | 2 of 4 | $6,893,819 | +6.0% |
| 12 JUN 2024 | T3915 | District 3 | SR 8 (I-10) AT JEFFERSON COUNTY WB REST AREA | 1 of 3 | $8,023,302 | Low, 1.0% under the second |
| 22 MAY 2024 | T3921 | District 3 | SR 8 (I-10) FROM E OF ESCAMBIA BAY BRIDGE TO W OF SR 281 (AV | 2 of 4 | $679,443 | +4.0% |
| 22 MAY 2024 | T7539 | District 7 | SR 93 (I-275) FROM SR 93 (I-275 / FRONTAGE RD EXIT RAMP AT | 2 of 5 | $1,190,876 | +7.0% |
| 17 APR 2024 | T7535 | District 7 | SR 400 (I-4) AT SEFFNER EB AND WB WEIGH STATIONS | 1 of 3 | $622,275 | Low, 3.0% under the second |
| 06 DEC 2023 | T7527 | District 7 | SR 93A (I-75) FROM S OF PROGRESS BLVD TO N OF WOODBERRY RD | 1 of 4 | $22,643,400 | Low, 10% under the second |
| 26 JUL 2023 | T5796 | District 5 | SILVER SPRINGS STATE PARK, AT HALF MILE CREEK AND FORT ... | 3 of 3 | $4,868,138 | +45% |
| 24 MAY 2023 | T1856 | District 1 | SR 400 (I-4) | 1 of 2 | $8,758,000 | Low, 2.0% under the second |
| 17 MAY 2023 | T7507 | District 7 | SR 93 (I-275) | 1 of 5 | $22,407,724 | Low, 29% under the second |
| 23 FEB 2022 | T1844 | District 1 | SR 555 (US 17) | 3 of 6 | $10,070,305 | +7.0% |
| 23 FEB 2022 | T5743 | District 5 | BARRACUDA BLVD AND BR NO 795700 | 1 of 5 | $4,388,956 | Low, 16% under the second |
| 26 JAN 2022 | T1811 | District 1 | SR 555 (US 17) | 1 of 5 | $2,754,382 | Low, 8.0% under the second |
How this record was read
FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
- Every bid counted here matched its published total to within one dollar; FDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.