FDOT contract T7586 bid tabulation
SR 39 (JAMES L REDMAN PKWY) FROM S OF RAYBURN RD TO N OF... Let by Florida DOT on March 25, 2026, Hillsborough, District 7. 6 bids received; low bid $3,945,047 by Gosalia Concrete Constructors, Inc..
- Owner
- Florida DOT
- Letting
- 25 MAR 2026
- Pay items
- 129
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Gosalia Concrete Constructors, Inc. | $3,945,047 | Low |
| 2 | Webber, LLC | $4,157,000 | +5.0% |
| 3 | Preferred Materials Inc. | $4,247,409 | +8.0% |
| 4 | PCS Civil, Inc. | $4,277,033 | +8.0% |
| 5 | C.W. Roberts Contracting, Inc. | $4,327,541 | +10% |
| 6 | Granite Construction Company | $4,785,520 | +21% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Gosalia Concrete Constructors, Inc. | 2. Webber, LLC | 3. Preferred Materials Inc. | 4. PCS Civil, Inc. | 5. C.W. Roberts Contracting, Inc. | 6. Granite Construction Company |
|---|---|---|---|---|---|---|---|---|---|
| 0005 | Mobilization (0101-1) | LS | 1 | $394,654 | $563,580 | $400,000 | $427,500 | $628,229 | $465,000 |
| 0010 | Maintenance of traffic (0102-1) | DA | 1 | $150,000 | $385,500 | $346,000 | $128,500 | $182,196 | $100,000 |
| 0015 | Special detour- temporary pavement (0102-2200) | SY | 1 | $105,000 | $139,645 | $59,686 | $90,000 | $77,935 | $70,000 |
| 0020 | Special detour- temporary earthwork/base (0102-2300) | CY | 1 | $80,000 | $30,795 | $21,648 | $35,400 | $49,392 | $75,000 |
| 0025 | Commercial material for temporary driveway maintenance (0102-3) | CY | 126.20 | $28.00 | $200.00 | $122.24 | $90.00 | $114.50 | $65.00 |
| 0030 | Pedestrian or bicycle special detour (0102-4-1) | SY | 1 | $26,000 | $14,125 | $28,342 | $27,000 | $9,186.37 | $12,000 |
| 0035 | Pedestrian escort/flagger (0102-5) | HR | 40 | $35.00 | $80.00 | $30.61 | $95.00 | $33.73 | $60.00 |
| 0040 | Traffic control officer (0102-14) | HR | 464 | $85.00 | $85.00 | $89.62 | $80.00 | $94.44 | $100.00 |
| 0045 | Work zone sign (0102-60) | ED | 21,131 | $0.20 | $0.25 | $0.22 | $0.25 | $0.24 | $0.30 |
| 0050 | Business sign (0102-61) | EACH | 12 | $45.00 | $22.00 | $50.41 | $60.00 | $50.76 | $75.00 |
| 0055 | Temporary barrier, F&I, low profile, concrete (0102-71-13) | LF | 676 | $35.00 | $50.00 | $39.21 | $85.00 | $39.48 | $130.00 |
| 0060 | Temporary barrier, relocate, low profile concrete (0102-71-23) | LF | 1,607 | $15.00 | $12.00 | $16.80 | $24.00 | $16.92 | $30.00 |
| 0065 | Channelizing device- types I, II, VP, drum, or LCD (0102-74-1) | ED | 33,158 | $0.09 | $0.10 | $0.10 | $0.11 | $0.11 | $0.15 |
| 0070 | Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8) | FD | 64,692 | $0.05 | $0.10 | $0.06 | $0.06 | $0.05 | $0.08 |
| 0075 | Temporary separator, F&I remove (0102-75-1) | LF | 4,439 | $10.00 | $17.00 | $11.20 | $13.50 | $21.43 | $18.00 |
| 0080 | Arrow board / advance warning arrow panel (0102-76) | ED | 450 | $5.00 | $4.80 | $5.60 | $6.75 | $5.64 | $8.50 |
| 0085 | Portable changeable message sign, temporary (0102-99) | ED | 751 | $10.00 | $10.50 | $11.20 | $13.50 | $10.38 | $16.75 |
| 0090 | Temporary signalization and maintenance, intersection (0102-104) | ED | 225 | $25.00 | $40.00 | $44.81 | $45.00 | $45.31 | $40.00 |
| 0095 | Temporary traffic detection and maintenance, intersection (0102-107-1) | ED | 225 | $25.00 | $30.00 | $26.49 | $36.00 | $26.79 | $35.00 |
| 0100 | Existing ITS maintenance (0102-112) | DA | 225 | $163.27 | $175.00 | $91.86 | $200.00 | $92.88 | $165.00 |
| 0105 | Type III barricade (0102-115) | ED | 5,536 | $0.30 | $0.25 | $0.34 | $0.40 | $0.34 | $0.35 |
| 0110 | Sediment barrier (0104-10-3) | LF | 1,308 | $3.00 | $1.25 | $1.46 | $2.50 | $1.16 | $9.00 |
| 0115 | Soil tracking prevention device (0104-15) | EACH | 2 | $2,500.00 | $6,300.00 | $1,000.00 | $4,500.00 | $2,388.89 | $7,000.00 |
| 0120 | Inlet protection system (0104-18) | EACH | 14 | $200.00 | $200.00 | $168.04 | $300.00 | $213.40 | $4,900.00 |
| 0125 | Litter removal (0107-1) | ACRE | 12.42 | $100.00 | $85.00 | $39.12 | $2,000.00 | $50.75 | $40.00 |
| 0130 | Mowing (0107-2) | ACRE | 7.98 | $100.00 | $100.00 | $39.12 | $3,000.00 | $174.80 | $45.00 |
| 0135 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $75,000 | $229,369 | $99,085 | $12,000 | $118,445 | $77,000 |
| 0140 | Removal of existing concrete (0110-4-10) | SY | 1,533 | $33.88 | $65.00 | $30.46 | $60.00 | $41.02 | $33.75 |
| 0145 | Regular excavation (0120-1) | CY | 784.70 | $72.67 | $24.00 | $23.16 | $34.50 | $33.00 | $25.00 |
| 0150 | Embankment (0120-6) | CY | 717.70 | $63.51 | $20.00 | $50.91 | $21.00 | $78.57 | $48.00 |
| 0155 | Type B stabilization (0160-4) | SY | 1,367 | $20.00 | $45.00 | $35.44 | $37.50 | $44.19 | $25.00 |
| 0160 | Optional base, base group 15 (0285-715) | SY | 181 | $138.00 | $200.00 | $183.95 | $330.00 | $154.82 | $25.00 |
| 0165 | Turnout base- optional materials (0286-1) | SY | 222 | $103.64 | $50.00 | $62.33 | $85.00 | $37.93 | $60.00 |
| 0170 | Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6) | SY | 8,634 | $3.39 | $14.00 | $4.05 | $3.50 | $5.89 | $7.00 |
| 0175 | Milling existing asphalt pavement, 12" avg depth (0327-70-46) | SY | 5,883 | $16.00 | $9.00 | $17.00 | $17.00 | $12.91 | $20.00 |
| 0180 | Superpave asphaltic conc, traffic C (0334-1-13) | TN | 1,157.30 | $194.43 | $220.00 | $182.00 | $250.00 | $175.33 | $275.00 |
| 0185 | Asphalt concrete friction course,traffic C, FC-12.5, PG (0337-7-83) | TN | 744.90 | $229.78 | $270.00 | $201.00 | $300.00 | $219.31 | $182.00 |
| 0190 | Plain cement concrete 9" (0350-3-7) | SY | 6,636 | $175.00 | $115.00 | $199.05 | $135.00 | $166.09 | $220.00 |
| 0195 | Cleaning & sealing joints- concrete pavement (0350-5) | LF | 8,166 | $8.80 | $4.50 | $8.96 | $5.75 | $10.88 | $9.00 |
| 0200 | Grinding concrete pavement (0352-70) | SY | 6,620 | $7.51 | $5.50 | $3.92 | $11.50 | $6.66 | $6.25 |
| 0205 | Inlets, curb, type J-5, <10' (0425-1451) | EACH | 1 | $24,000 | $8,000.00 | $13,316 | $14,000 | $13,408 | $5,325.00 |
| 0210 | Inlets, curb, type J-6, <10' (0425-1461) | EACH | 1 | $24,000 | $7,500.00 | $13,933 | $15,000 | $14,030 | $5,325.00 |
| 0215 | Manholes, J-8, <10' (0425-2-91) | EACH | 2 | $32,000 | $16,000 | $26,131 | $12,500 | $26,313 | $5,300.00 |
| 0220 | Inlets, adjust (0425-4) | EACH | 5 | $1,900.00 | $8,000.00 | $2,302.86 | $7,000.00 | $2,322.62 | $4,500.00 |
| 0225 | Pipe culvert,optional material,round, 15"S/CD (0430-175115) | LF | 4 | $428.00 | $180.00 | $294.63 | $1,700.00 | $300.49 | $100.00 |
| 0230 | Pipe culvert,optional material,round, 18"S/CD (0430-175118) | LF | 4 | $445.00 | $200.00 | $319.33 | $1,700.00 | $325.36 | $105.00 |
| 0235 | Pipe culvert, opt material, round, 36"S/CD (0430-175136) | LF | 36 | $500.00 | $210.00 | $544.79 | $1,400.00 | $552.38 | $123.00 |
| 0240 | Pipe culvert,optional material,other-elip/arch, (0430-175218) | LF | 13 | $450.00 | $140.00 | $326.54 | $1,150.00 | $332.61 | $110.00 |
| 0245 | PVC pipe for back of sidewalk, (0430-963-1) | LF | 12 | $64.00 | $50.00 | $83.52 | $285.00 | $87.89 | $24.75 |
| 0250 | Edgedrain draincrete, (0446-1-1) | LF | 1,741 | $27.00 | $35.00 | $36.97 | $20.00 | $36.67 | $22.50 |
| 0255 | Edgedrain outlet pipe, 4" (0446-71-1) | LF | 47 | $115.00 | $35.00 | $36.97 | $152.50 | $36.67 | $19.25 |
| 0260 | Concrete curb & gutter, type E (0520-1-7) | LF | 1,268 | $34.00 | $35.00 | $58.49 | $69.00 | $69.22 | $65.00 |
| 0265 | Concrete curb & gutter, type F (0520-1-10) | LF | 1,195 | $36.00 | $35.00 | $57.23 | $97.50 | $73.50 | $66.00 |
| 0270 | Curb-concrete pavement joint (0520-4) | LF | 2,764 | $15.00 | $8.00 | $5.15 | $15.25 | $6.26 | $7.25 |
| 0275 | Traffic separator - concrete, type II, 4' wide (0520-5-21) | LF | 284 | $30.00 | $70.00 | $93.48 | $100.00 | $189.27 | $50.00 |
| 0280 | Concrete traffic separator, special- variable width (0520-70) | SY | 70 | $75.00 | $205.00 | $159.13 | $145.00 | $116.42 | $105.00 |
| 0285 | Concrete sidewalk and driveways, 4" thick (0522-1) | SY | 300 | $29.00 | $60.00 | $83.05 | $120.00 | $97.28 | $155.00 |
| 0290 | Concrete sidewalk and driveways, 6" thick (0522-2) | SY | 600 | $86.00 | $80.00 | $134.37 | $140.00 | $113.96 | $250.00 |
| 0300 | Detectable warnings (0527-2) | SF | 127 | $25.00 | $55.00 | $30.87 | $50.00 | $63.00 | $64.50 |
| 0305 | Performance turf, sod (0570-1-2) | SY | 2,251 | $20.00 | $4.00 | $8.65 | $14.00 | $7.47 | $6.50 |
| 0310 | Raised pavement marker, type B (0706-1-3) | EACH | 1,445 | $4.00 | $4.00 | $4.48 | $7.50 | $5.64 | $7.75 |
| 0315 | Painted pavement markings, standard, white, solid, 6" (0710-11101) | GM | 1.38 | $2,498.19 | $2,500.00 | $2,798.55 | $2,750.00 | $1,803.54 | $4,800.00 |
| 0320 | Painted pavement markings, standard, white, solid for crosswalk and roundabout, 12" (0710-11123) | LF | 230 | $2.00 | $2.00 | $2.24 | $1.90 | $1.13 | $3.75 |
| 0325 | Painted pavement markings, standard, white, solid for stop line or crosswalk, 24" (0710-11125) | LF | 117 | $2.50 | $2.50 | $2.80 | $3.15 | $2.26 | $4.75 |
| 0330 | Painted pavement markings, standard, white, 2-4 dotted guideline/ 6-10 dotted 6" (0710-11141) | GM | 0.04 | $625.00 | $625.00 | $700.00 | $825.00 | $1,253.33 | $1,209.17 |
| 0335 | Painted pavement markings, standard, white, arrows (0710-11170) | EACH | 13 | $45.00 | $45.00 | $50.41 | $55.00 | $50.76 | $87.00 |
| 0340 | Painted pavement markings, standard, yellow, solid, 6" (0710-11201) | GM | 1.78 | $2,495.79 | $2,500.00 | $2,795.87 | $27.25 | $1,801.81 | $4,800.00 |
| 0345 | Painted pavement markings, standard, yellow, 2-4 dotted guideline/6-10 dotted extension, 6" (0710-11241) | GM | 0.16 | $750.00 | $750.00 | $840.19 | $1,000.00 | $1,128.06 | $1,450.88 |
| 0350 | Painted pavement markings, standard, black, 2-4 dotted guideline/ 6-10 dotted 6" (0710-11341) | GM | 0.02 | $714.29 | $750.00 | $800.48 | $950.00 | $1,074.29 | $1,381.90 |
| 0355 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $50,000 | $50,000 | $50,000 | $50,000 | $50,000 | $50,000 |
| 0360 | Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111) | EACH | 6 | $454.55 | $775.00 | $863.03 | $915.00 | $872.58 | $750.00 |
| 0365 | Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112) | EACH | 1 | $2,140.94 | $2,450.00 | $2,620.56 | $3,030.00 | $2,649.58 | $3,500.00 |
| 0370 | Single column ground sign assembly, remove (0700-1600) | EACH | 5 | $59.56 | $100.00 | $108.66 | $105.00 | $109.86 | $98.00 |
| 0375 | Single column ground sign assembly, F&I cantilever mount, 20.1-30.0 SF (0700-1913) | EACH | 1 | $3,945.14 | $3,100.00 | $3,446.67 | $7,425.00 | $3,484.83 | $6,400.00 |
| 0380 | Multi-column ground sign assembly, F&I ground mount, 50.0 SF (0700-2114) | EACH | 1 | $7,752.01 | $7,500.00 | $8,340.38 | $11,915 | $8,432.70 | $12,600 |
| 0385 | Multi-column ground sign assembly, remove (0700-2600) | EACH | 1 | $1,250.78 | $700.00 | $778.56 | $1,875.00 | $787.18 | $2,000.00 |
| 0390 | Delineator, flexible tubular (0705-11-1) | EACH | 2 | $108.48 | $200.00 | $140.03 | $355.00 | $226.53 | $178.00 |
| 0395 | Raised pavement marker, type B (0706-1-3) | EACH | 175 | $4.00 | $4.00 | $4.48 | $7.50 | $5.64 | $7.75 |
| 0400 | Painted pavement markings, surface (0710-90) | LS | 1 | $18,039 | $20,000 | $20,208 | $4,800.00 | $8,460.23 | $25,000 |
| 0405 | Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123) | LF | 123 | $6.00 | $6.00 | $6.72 | $25.00 | $6.77 | $11.50 |
| 0410 | Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125) | LF | 22 | $12.00 | $12.00 | $13.44 | $12.50 | $11.28 | $23.25 |
| 0415 | Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141) | GM | 0.05 | $1,836.73 | $2,000.00 | $2,057.55 | $7,125.00 | $5,179.80 | $3,500.00 |
| 0420 | Thermoplastic, standard, message or symbol (0711-11160) | EACH | 1 | $140.00 | $140.00 | $156.83 | $485.00 | $338.41 | $271.00 |
| 0425 | Thermoplastic, standard, yellow, 2-4 dotted guide line dotted extension line, 6" (0711-11241) | GM | 0.04 | $2,142.86 | $2,200.00 | $2,400.48 | $8,300.00 | $4,834.29 | $4,150.00 |
| 0430 | Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125) | LF | 59 | $15.45 | $15.50 | $17.31 | $22.50 | $28.20 | $30.00 |
| 0435 | Thermoplastic, preformed, white, 2-4 dotted guideline on concrete surfaces (0711-14141) | GM | 0.02 | $7,445.22 | $7,500.00 | $8,340.00 | $70,475 | $24,522 | $14,000 |
| 0440 | Thermoplastic, preformed, yellow, 2-4 dotted guideline on concrete surfaces (0711-14241) | GM | 0.03 | $8,562.00 | $8,600.00 | $9,591.67 | $81,000 | $28,201 | $16,500 |
| 0445 | Thermoplastic, preformed, 24" white with 4" black contrast crosswalk on concrete pavement, 32" (0711-14526) | LF | 340 | $21.82 | $21.80 | $24.44 | $25.00 | $33.84 | $42.25 |
| 0450 | Thermoplastic, preformed, 24" white with 4" black contrast stop line on concrete 32" (0711-14527) | LF | 95 | $21.82 | $21.80 | $24.44 | $25.00 | $33.84 | $42.25 |
| 0455 | Thermoplastic, preformed, 12" white with 4" black contrast crosswalk on concrete pavement, 20" (0711-14528) | LF | 403 | $10.91 | $11.00 | $12.22 | $21.25 | $22.56 | $21.00 |
| 0460 | Thermoplastic, preformed, white with black contrast, arrow on concrete surface (0711-14570) | EACH | 7 | $801.00 | $801.00 | $897.30 | $855.00 | $958.83 | $1,500.00 |
| 0465 | Thermoplastic, standard-open graded asphalt surfaces solid, 6" (0711-15101) | GM | 0.55 | $7,095.20 | $8,000.00 | $7,948.26 | $11,025 | $8,429.58 | $13,500 |
| 0470 | Thermoplastic, standard-open graded asphalt surfaces, solid, 8" (0711-15102) | GM | 0.06 | $8,901.56 | $8,900.00 | $9,971.88 | $10,100 | $8,989.06 | $17,000 |
| 0475 | Thermoplastic, standard-open graded asphalt surfaces, skip, 6",10-30 skip or 3-9 lane (0711-15131) | GM | 0.54 | $1,774.43 | $1,800.00 | $1,987.77 | $8,450.00 | $5,057.42 | $3,200.00 |
| 0480 | Thermoplastic, standard-open graded asphalt surfaces, 6", 6-10 dotted managed lane marking (0711-15171) | GM | 0.08 | $2,671.00 | $2,700.00 | $2,992.13 | $8,480.00 | $5,076.13 | $5,000.00 |
| 0485 | Thermoplastic, standard-open graded asphalt surfaces, yellow, solid, 6" (0711-15201) | GM | 0.43 | $6,433.10 | $6,500.00 | $7,206.55 | $10,900 | $8,539.67 | $12,000 |
| 0490 | Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101) | GM | 0.30 | $4,929.03 | $5,000.00 | $5,521.64 | $10,775 | $7,381.44 | $9,000.00 |
| 0495 | Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201) | GM | 0.26 | $4,563.73 | $4,600.00 | $5,112.43 | $10,850 | $7,476.00 | $8,500.00 |
| 0500 | Permanent tape, white, solid W/contrast, 6" primary line width, for concrete surfaces (0713-103121) | GM | 0.16 | $36,832 | $37,000 | $44,011 | $63,550 | $46,278 | $71,000 |
| 0505 | Permanent tape, white, 6-10 skip/dotted, 6" for concrete surfaces (0713-103141) | GM | 0.05 | $12,491 | $13,000 | $17,492 | $46,625 | $14,713 | $24,000 |
| 0510 | Permanent tape, white, 10-30 6" wide, for concrete surfaces (0713-103181) | GM | 0.21 | $9,167.46 | $9,200.00 | $10,783 | $59,650 | $13,601 | $17,000 |
| 0515 | Permanent tape, black, 6-10 dotted extension, 6" for concrete surfaces (0713-103341) | GM | 0.04 | $13,059 | $13,000 | $14,629 | $48,750 | $12,306 | $25,000 |
| 0520 | Permanent tape, black, 10-30 6" wide, for concrete surfaces (0713-103381) | GM | 0.20 | $9,532.34 | $9,600.00 | $10,678 | $62,025 | $13,469 | $17,000 |
| 0525 | Conduit, furnish & install, open trench (0630-2-11) | LF | 215 | $16.11 | $14.00 | $15.16 | $67.25 | $15.32 | $35.00 |
| 0530 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 12 | $1,501.08 | $1,500.00 | $1,624.30 | $2,400.00 | $1,642.28 | $2,700.00 |
| 0535 | Lighting conductors, F&I, insulated, no 4 to no 2 (0715-1-13) | LF | 1,738 | $4.20 | $3.25 | $3.50 | $7.00 | $3.53 | $7.00 |
| 0540 | Lighting conductors, remove & dispose, contractor owns (0715-1-60) | LF | 660 | $1.19 | $1.00 | $0.75 | $1.95 | $0.76 | $2.00 |
| 0545 | Light pole complete, F&I, standard pole standard foundation, 30' mounting height, 15' arm length (0715-61152) | EACH | 3 | $8,935.21 | $7,500.00 | $8,335.49 | $12,275 | $8,427.76 | $13,000 |
| 0550 | Light pole complete, remove pole and foundation (0715-69000) | EACH | 2 | $1,191.22 | $900.00 | $1,005.07 | $38.15 | $1,016.20 | $2,200.00 |
| 0555 | Pole cable distribution system, furnish and install, conventional (0715-500-1) | EACH | 3 | $748.04 | $700.00 | $753.75 | $1,140.00 | $762.02 | $1,500.00 |
| 0560 | Itsfm subsurface documentation- project length (0611-1-1) | MI | 0.17 | $3,568.13 | $4,000.00 | $4,416.81 | $6,100.00 | $4,465.72 | $7,100.00 |
| 0565 | Itsfm location documentation- intersection (0611-2-1) | EACH | 1 | $2,682.54 | $2,700.00 | $2,895.79 | $4,425.00 | $2,927.86 | $5,000.30 |
| 0570 | Conduit, furnish & install, open trench (0630-2-11) | LF | 195 | $22.48 | $23.00 | $25.77 | $81.00 | $26.05 | $45.00 |
| 0575 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 236 | $40.16 | $40.00 | $44.75 | $65.50 | $45.25 | $75.00 |
| 0580 | Signal cable- new or reconstructed intersection, furnish & install (0632-7-1) | PI | 1 | $11,100 | $11,500 | $12,586 | $15,775 | $12,725 | $14,000 |
| 0585 | Signal cable, remove- intersection (0632-7-6) | PI | 1 | $2,144.20 | $2,500.00 | $2,800.57 | $1,090.00 | $2,831.58 | $3,000.00 |
| 0590 | Fiber optic cable locator (0633-6) | DA | 225 | $178.68 | $205.00 | $227.97 | $360.00 | $230.49 | $320.00 |
| 0595 | Pull & splice box, F&I, 17" X 30" cover size (0635-2-14) | EACH | 13 | $1,642.95 | $2,000.00 | $2,099.36 | $3,190.00 | $2,122.60 | $3,100.00 |
| 0600 | Aluminum signals pole, (0646-1-11) | EACH | 6 | $2,896.94 | $3,000.00 | $3,297.42 | $3,490.00 | $3,333.92 | $5,000.00 |
| 0605 | Aluminum signals pole, remove (0646-1-60) | EACH | 4 | $476.49 | $250.00 | $280.06 | $1,475.00 | $283.16 | $890.00 |
| 0610 | Pedestrian signal, furnish & install LED countdown, 1 way (0653-1-11) | AS | 6 | $902.10 | $1,200.00 | $1,178.99 | $1,345.00 | $1,192.04 | $1,700.00 |
| 0615 | Loop detector inductive, remove- cabinet to remain (0660-1600) | EACH | 7 | $89.34 | $150.00 | $168.03 | $90.50 | $169.90 | $100.00 |
| 0620 | Vehicle detection system- furnish & install cabinet equipment (0660-4-11) | EACH | 1 | $31,240 | $12,000 | $21,296 | $42,200 | $21,531 | $39,000 |
| 0625 | Vehicle detection system- furnish & install above ground equipment (0660-4-12) | EACH | 4 | $6,222.57 | $8,000.00 | $8,438.13 | $11,173 | $8,531.55 | $10,000 |
| 0630 | Pedestrian detector, furnish & install, standard (0665-1-11) | EACH | 6 | $398.64 | $350.00 | $385.98 | $515.00 | $390.25 | $666.00 |
| 0635 | Traffic controller, modify (0671-2-40) | EACH | 1 | $3,081.24 | $5,000.00 | $5,041.04 | $1,446.00 | $5,096.84 | $3,600.00 |
| 0640 | ITS CCTV camera, relocate (0682-1400) | EACH | 1 | $1,436.78 | $1,500.00 | $1,540.32 | $2,710.00 | $1,557.37 | $2,700.00 |
| 0645 | Internally illuminated sign, furnish & install, overhead mount, 12-18 SF (0700-5-22) | EACH | 4 | $5,034.64 | $3,600.00 | $3,998.39 | $79.80 | $4,042.66 | $8,000.00 |
| 0650 | Internally illuminated sign, remove (0700-5-60) | EACH | 4 | $476.49 | $500.00 | $504.10 | $1,370.00 | $509.68 | $800.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
Every contract let that day: FDOT letting of March 25, 2026. Compiled by Mirage Metrics.