PCS Civil, Inc.: FDOT bid record
PCS Civil, Inc. submitted 12 bids on Florida DOT contracts in the data, from 10 JUN 2020 to 20 MAY 2026, and was the low bidder on 1 of them (8%). When it was not low, its total sat a median +11% above the low bid.
- Owner
- Florida DOT
- Low bid volume
- $3,677,251
- Latest bid
- 20 MAY 2026
- Data through
- 28 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 4 | 0 | 0% |
| 2021 | 3 | 1 | 33% |
| 2023 | 1 | 0 | 0% |
| 2026 | 4 | 0 | 0% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| District 7 | 11 | 1 | 9% |
| District 1 | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Traffic control officer | 0102-14 | HR | 11 | 6 (55%) | $75.00 | $80.00 |
| Manholes, P-8, <10' | 0425-2-61 | EACH | 7 | 4 (57%) | $3,600.00 | $6,325.37 |
| Performance turf, sod | 0570-1-2 | SY | 12 | 3 (25%) | $4.88 | $5.00 |
| Sediment barrier | 0104-10-3 | LF | 12 | 3 (25%) | $2.00 | $2.60 |
| Thermoplastic, preformed, white, solid, 24" for crosswalk | 0711-14125 | LF | 12 | 3 (25%) | $15.00 | $17.00 |
| Embankment | 0120-6 | CY | 12 | 3 (25%) | $17.00 | $30.04 |
| Temporary signalization and maintenance, intersection | 0102-104 | ED | 12 | 3 (25%) | $21.00 | $15.00 |
| Mowing | 0107-2 | ACRE | 11 | 3 (27%) | $50.00 | $80.65 |
| Thermoplastic, standard-other surfaces, white, solid, 6" | 0711-16101 | GM | 10 | 3 (30%) | $4,975.00 | $5,220.00 |
| Aluminum signals pole, remove | 0646-1-60 | EACH | 10 | 3 (30%) | $312.50 | $332.00 |
| Thermoplastic, preformed, white, message | 0711-14160 | EACH | 8 | 3 (38%) | $200.00 | $243.70 |
| Milling existing asphalt pavement, 1 1/2" avg depth | 0327-70-6 | SY | 7 | 3 (43%) | $2.50 | $4.61 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Ajax Paving Industries of Florida LLC | 8 | 4 of 8 |
| Preferred Materials Inc. | 7 | 3 of 7 |
| Watson Civil Construction, Inc. | 6 | 5 of 6 |
| C.W. Roberts Contracting, Inc. | 6 | 3 of 6 |
| Cone & Graham, Inc. | 4 | 2 of 4 |
| Nelson, David, Construction Co. | 4 | 0 of 4 |
| Russell Engineering, Inc. | 3 | 1 of 3 |
| Crisdel Group, Inc | 3 | 1 of 3 |
| Gosalia Concrete Constructors, Inc. | 3 | 3 of 3 |
| Burgess Civil, LLC | 3 | 2 of 3 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 20 MAY 2026 | T7595 | District 7 | SR 580 (W BUSCH BLVD) AND GUNN HWY FROM N DALE MABRY HWY TO | 3 of 8 | $13,291,738 | +4.0% |
| 20 MAY 2026 | T7607 | District 7 | SR 93 (I-75) AT CR 54 | 3 of 6 | $1,792,756 | +6.0% |
| 29 APR 2026 | T7611 | District 7 | SR 582 (FOWLER AVE) FROM BRUCE B DOWNS BLVD TO 50TH ST | 8 of 9 | $12,670,392 | +23% |
| 25 MAR 2026 | T7586 | District 7 | SR 39 (JAMES L REDMAN PKWY) FROM S OF RAYBURN RD TO N OF... | 4 of 6 | $4,277,033 | +8.0% |
| 14 JUN 2023 | T7516 | District 7 | SR 41 (US 301) (GALL BLVD) | 2 of 5 | $7,488,674 | +11% |
| 28 APR 2021 | T7470 | District 7 | CR 486 (FOREST RIDGE BLVD) | 3 of 4 | $2,244,998 | +5.0% |
| 31 MAR 2021 | T1783 | District 1 | SR 93 (I-75) | 5 of 7 | $59,424,999 | +13% |
| 27 JAN 2021 | T7460 | District 7 | SR 60 | 1 of 6 | $3,677,251 | Low, 20% under the second |
| 18 NOV 2020 | T7438 | District 7 | SR 45 (US 41) | 2 of 9 | $18,133,526 | +8.0% |
| 18 NOV 2020 | T7449 | District 7 | MORRIS BRIDGE - BIKE PATH/TRAIL | 9 of 12 | $5,206,980 | +17% |
| 30 SEP 2020 | T7463 | District 7 | SR 595 (ALT US 19/SEMINOLE BLVD) | 3 of 3 | $6,137,586 | +14% |
| 10 JUN 2020 | T7445 | District 7 | US 19/US 98/SR 55/S SUNCOAST BLVD | 4 of 5 | $24,627,375 | +23% |
How this record was read
FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
- Every bid counted here matched its published total to within one dollar; FDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.