FDOT contract T7611 bid tabulation
SR 582 (FOWLER AVE) FROM BRUCE B DOWNS BLVD TO 50TH ST. Let by Florida DOT on April 29, 2026, Hillsborough, District 7. 9 bids received; low bid $10,292,804 by Preferred Materials Inc..
- Owner
- Florida DOT
- Letting
- 29 APR 2026
- Pay items
- 159
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Preferred Materials Inc. | $10,292,804 | Low |
| 2 | Hubbard Construction Company | $10,736,421 | +4.0% |
| 3 | C.W. Roberts Contracting, Inc. | $11,357,868 | +10% |
| 4 | Ajax Paving Industries of Florida LLC | $11,790,338 | +15% |
| 5 | Blacktip Services Incorporated | $12,269,865 | +19% |
| 6 | Cone & Graham, Inc. | $12,404,647 | +21% |
| 7 | Burgess Civil, LLC | $12,436,865 | +21% |
| 8 | PCS Civil, Inc. | $12,670,392 | +23% |
| 9 | Nelson, David, Construction Co. | $14,217,909 | +38% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Preferred Materials Inc. | 2. Hubbard Construction Company | 3. C.W. Roberts Contracting, Inc. | 4. Ajax Paving Industries of Florida LLC | 5. Blacktip Services Incorporated | 6. Cone & Graham, Inc. |
|---|---|---|---|---|---|---|---|---|---|
| 0005 | Mobilization (0101-1) | LS | 1 | $594,000 | $446,526 | $930,508 | $705,000 | $550,000 | $1,100,000 |
| 0010 | Mobilization (0101-1) | LS | 1 | $89,500 | $148,842 | $42,908 | $50,000 | $550,000 | $139,603 |
| 0015 | Maintenance of traffic (0102-1) | DA | 1 | $242,200 | $391,143 | $509,764 | $825,000 | $220,094 | $755,500 |
| 0020 | Maintenance of traffic (0102-1) | DA | 1 | $223,250 | $130,381 | $38,357 | $50,000 | $220,094 | $125,000 |
| 0025 | Pedestrian or bicycle special detour (0102-4-1) | SY | 1 | $18,513 | $22,540 | $26,040 | $49,419 | $12,000 | $7,500.00 |
| 0030 | Pedestrian escort/flagger (0102-5) | HR | 240 | $43.62 | $39.47 | $40.57 | $52.14 | $85.00 | $101.00 |
| 0035 | Traffic control officer (0102-14) | HR | 1,040 | $91.71 | $94.89 | $95.18 | $109.49 | $68.00 | $95.00 |
| 0040 | Work zone sign (0102-60) | ED | 16,089 | $0.20 | $0.24 | $0.20 | $0.22 | $0.25 | $0.19 |
| 0045 | Channelizing device- types I, II, VP, drum, or LCD (0102-74-1) | ED | 26,485 | $0.11 | $0.10 | $0.10 | $0.09 | $0.15 | $0.10 |
| 0050 | Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8) | FD | 9,965 | $0.04 | $0.07 | $0.05 | $0.06 | $0.35 | $0.04 |
| 0055 | Arrow board / advance warning arrow panel (0102-76) | ED | 452 | $5.39 | $5.68 | $5.60 | $5.21 | $6.00 | $5.00 |
| 0060 | Portable changeable message sign, temporary (0102-99) | ED | 760 | $10.79 | $11.36 | $11.20 | $10.43 | $12.00 | $10.00 |
| 0065 | Temporary signalization and maintenance, intersection (0102-104) | ED | 3,522 | $5.28 | $5.54 | $5.60 | $5.18 | $26.75 | $9.00 |
| 0070 | Temporary traffic detection and maintenance, intersection (0102-107-1) | ED | 3,420 | $8.87 | $9.32 | $9.40 | $8.70 | $26.75 | $9.00 |
| 0075 | Existing ITS maintenance (0102-112) | DA | 380 | $119.57 | $125.60 | $126.63 | $117.30 | $29.43 | $244.00 |
| 0080 | Type III barricade (0102-115) | ED | 781 | $0.27 | $0.34 | $0.30 | $0.31 | $0.35 | $0.25 |
| 0085 | Sediment barrier (0104-10-3) | LF | 24,811 | $1.94 | $1.12 | $2.85 | $2.09 | $2.70 | $4.00 |
| 0090 | Soil tracking prevention device (0104-15) | EACH | 3 | $500.00 | $5,695.66 | $500.00 | $5,384.23 | $500.00 | $2,500.00 |
| 0095 | Inlet protection system (0104-18) | EACH | 86 | $75.52 | $214.97 | $161.25 | $130.35 | $45.00 | $175.00 |
| 0100 | Litter removal (0107-1) | ACRE | 667.22 | $42.62 | $44.10 | $96.30 | $61.53 | $65.00 | $40.00 |
| 0105 | Mowing (0107-2) | ACRE | 600.94 | $42.62 | $44.10 | $48.15 | $61.53 | $65.00 | $50.00 |
| 0110 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $220,858 | $232,009 | $66,290 | $133,000 | $479,000 | $975,650 |
| 0115 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $85,154 | $89,454 | $6,719.75 | $25,000 | $479,000 | $288,118 |
| 0120 | Selective clearing and areas with trees to remain (0110-2-2) | ACRE | 3.64 | $7,334.84 | $7,705.18 | $9,751.04 | $8,265.08 | $21,500 | $11,500 |
| 0125 | Removal of existing concrete (0110-4-10) | SY | 6,018 | $23.43 | $24.62 | $30.94 | $40.07 | $60.00 | $28.00 |
| 0130 | Tree protection barrier (0110-21) | LF | 2,679 | $6.75 | $7.10 | $4.85 | $7.82 | $7.00 | $9.80 |
| 0135 | Tree root and branch pruning (0110-22) | EACH | 39 | $1,051.85 | $1,104.96 | $627.10 | $625.68 | $1,000.00 | $1,420.00 |
| 0140 | Tree removal (0110-23) | EACH | 46 | $1,647.61 | $1,730.80 | $2,015.68 | $1,355.64 | $1,500.00 | $2,300.00 |
| 0145 | Regular excavation (0120-1) | CY | 3,702.20 | $21.92 | $23.03 | $29.58 | $34.48 | $50.00 | $65.00 |
| 0150 | Embankment (0120-6) | CY | 1,747.20 | $32.49 | $34.13 | $21.26 | $38.71 | $20.00 | $65.00 |
| 0155 | Geosynthetic reinforced soil slope (0145-1) | SF | 1,184 | $3.31 | $3.48 | $4.45 | $7.54 | $5.00 | $20.00 |
| 0160 | Type B stabilization (0160-4) | SY | 4,122 | $29.31 | $30.79 | $19.06 | $14.78 | $19.00 | $24.00 |
| 0165 | Optional base, base group 01 (0285-701) | SY | 424 | $26.88 | $28.23 | $74.05 | $31.42 | $65.00 | $60.00 |
| 0170 | Optional base, base group 06 (0285-706) | SY | 2,325 | $36.11 | $37.23 | $22.98 | $44.55 | $36.00 | $30.00 |
| 0175 | Optional base, base group 15 (0285-715) | SY | 324 | $120.65 | $100.17 | $131.28 | $263.30 | $95.00 | $105.00 |
| 0180 | Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6) | SY | 46,475 | $3.09 | $3.19 | $3.25 | $3.63 | $3.71 | $3.75 |
| 0185 | Milling existing asphalt pavement, 3 3/4" avg depth (0327-70-20) | SY | 84,402 | $2.20 | $2.88 | $3.55 | $6.71 | $3.57 | $3.27 |
| 0190 | Superpave asphaltic conc, traffic C (0334-1-13) | TN | 366.70 | $141.96 | $124.42 | $157.45 | $168.07 | $141.54 | $128.17 |
| 0195 | Superpave asphaltic concrete, traffic C, PG76-22 (0334-1-53) | TN | 10,534.30 | $137.03 | $151.14 | $174.22 | $161.51 | $170.16 | $154.42 |
| 0200 | Asphalt concrete friction course,traffic C, FC-12.5, PG (0337-7-83) | TN | 10,718.70 | $174.30 | $161.84 | $195.66 | $187.99 | $181.94 | $167.30 |
| 0205 | Inlets, DT bot, type C,<10' (0425-1521) | EACH | 2 | $9,926.19 | $10,427 | $5,780.51 | $5,735.42 | $9,500.00 | $9,065.00 |
| 0210 | Inlets, ditch bottom, type C, partial (0425-1525) | EACH | 2 | $8,255.82 | $8,672.66 | $10,778 | $2,919.85 | $9,500.00 | $7,059.00 |
| 0215 | Inlets, DT bot, type D, <10' (0425-1541) | EACH | 1 | $9,296.26 | $9,765.63 | $6,653.25 | $6,778.22 | $9,500.00 | $9,591.00 |
| 0220 | Manhole, adjust (0425-5) | EACH | 6 | $1,330.25 | $1,397.41 | $1,610.75 | $282.46 | $1,750.00 | $1,250.00 |
| 0225 | Pipe culvert,optional material,round, 18"S/CD (0430-175118) | LF | 300 | $172.77 | $181.49 | $137.03 | $130.35 | $335.00 | $112.00 |
| 0230 | Pipe culvert,optional material,round, 24"S/CD (0430-175124) | LF | 42 | $291.63 | $306.36 | $316.84 | $156.42 | $335.00 | $181.00 |
| 0235 | Mitered end section, optional round, 24" CD (0430-982129) | EACH | 1 | $4,563.06 | $4,793.46 | $4,086.44 | $2,919.85 | $900.00 | $4,000.00 |
| 0240 | Mitered end section, optional round, 18" SD (0430-984125) | EACH | 8 | $3,521.49 | $3,699.29 | $4,059.49 | $2,294.17 | $900.00 | $3,750.00 |
| 0245 | Pipe handrail - guiderail, aluminum (0515-1-2) | LF | 212 | $65.27 | $68.57 | $99.06 | $54.23 | $58.00 | $52.00 |
| 0250 | Concrete curb & gutter, type E (0520-1-7) | LF | 1,688 | $44.40 | $46.64 | $47.65 | $57.05 | $35.00 | $28.25 |
| 0255 | Concrete curb & gutter, type F (0520-1-10) | LF | 434 | $42.28 | $44.42 | $30.70 | $69.06 | $35.00 | $27.50 |
| 0260 | Concrete curb, type D (0520-2-4) | LF | 249 | $32.52 | $34.16 | $30.70 | $41.30 | $35.00 | $23.25 |
| 0265 | Concrete traffic separator, special- variable width (0520-70) | SY | 4,701 | $104.26 | $139.08 | $77.31 | $118.14 | $95.00 | $89.10 |
| 0270 | Concrete sidewalk and driveways, 4" thick (0522-1) | SY | 9,264 | $56.38 | $59.23 | $54.83 | $56.51 | $62.00 | $42.30 |
| 0275 | Concrete sidewalk and driveways, 6" thick (0522-2) | SY | 775 | $98.62 | $103.60 | $68.21 | $140.80 | $75.00 | $62.10 |
| 0280 | Detectable warnings (0527-2) | SF | 906 | $29.74 | $31.24 | $39.79 | $21.90 | $34.00 | $30.75 |
| 0285 | Riprap, rubble, F&I, ditch lining (0530-3-4) | TN | 4 | $286.38 | $300.84 | $824.71 | $208.56 | $500.00 | $350.00 |
| 0290 | Fencing, type B, 5.1-6.0', standard (0550-10220) | LF | 105 | $43.16 | $46.25 | $42.52 | $52.14 | $55.00 | $50.00 |
| 0295 | Fence gate, type B, double, 18.1- 20.0' opening (0550-60224) | EACH | 2 | $1,510.50 | $2,037.43 | $2,526.74 | $2,607.01 | $2,750.00 | $2,500.00 |
| 0300 | Performance turf, sod (0570-1-2) | SY | 25,158 | $4.16 | $4.37 | $6.35 | $5.02 | $4.99 | $4.00 |
| 0305 | Painted pavement markings, standard, white, solid, 6" (0710-11101) | GM | 9.98 | $1,832.70 | $1,915.51 | $1,905.99 | $2,126.48 | $1,356.00 | $1,700.00 |
| 0310 | Painted pavement markings, standard, white, solid for crosswalk and roundabout, 12" (0710-11123) | LF | 6,198 | $1.40 | $1.47 | $1.45 | $1.63 | $1.13 | $1.30 |
| 0315 | Painted pavement markings, standard, white, solid for stop line or crosswalk, 24" (0710-11125) | LF | 5,881 | $1.51 | $1.58 | $1.55 | $1.75 | $2.26 | $1.40 |
| 0320 | Painted pavement markings, standard, white, skip, 10-30 or skip, 6" wide (0710-11131) | GM | 5.75 | $1.62 | $1.69 | $1.70 | $1.88 | $621.50 | $1,500.00 |
| 0325 | Painted pavement markings, standard, white, message or symbol (0710-11160) | EACH | 98 | $37.76 | $39.47 | $39.19 | $43.78 | $56.50 | $35.00 |
| 0330 | Painted pavement markings, standard, white, arrows (0710-11170) | EACH | 257 | $32.37 | $33.83 | $33.59 | $37.53 | $28.25 | $30.00 |
| 0335 | Painted pavement markings, standard, yellow, solid, 6" (0710-11201) | GM | 3.60 | $1,830.60 | $1,913.32 | $1,905.28 | $2,126.48 | $1,356.00 | $1,700.00 |
| 0340 | Directional indicators (0919-528100) | SF | 94 | $41.64 | $89.31 | $111.98 | $31.28 | $48.00 | $55.00 |
| 0345 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $120,000 | $120,000 | $120,000 | $120,000 | $120,000 | $120,000 |
| 0350 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $10,000 | $10,000 | $10,000 | $10,000 | $10,000 | $10,000 |
| 0355 | Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111) | EACH | 75 | $523.28 | $549.70 | $951.85 | $505.76 | $678.00 | $580.00 |
| 0360 | Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112) | EACH | 18 | $1,942.06 | $2,040.12 | $1,511.76 | $1,877.05 | $2,034.00 | $2,250.00 |
| 0365 | Single column ground sign assembly, relocate (0700-1500) | EACH | 7 | $539.46 | $566.70 | $615.90 | $521.40 | $226.00 | $250.00 |
| 0370 | Single column ground sign assembly, remove (0700-1600) | EACH | 62 | $26.97 | $28.33 | $195.97 | $26.07 | $45.20 | $70.00 |
| 0375 | Single column ground sign assembly, F&I cantilever mount, 20.1-30.0 SF (0700-1913) | EACH | 2 | $2,913.09 | $3,060.17 | $4,759.24 | $2,815.57 | $4,520.00 | $4,300.00 |
| 0380 | Multi-column ground sign assembly, F&I ground mount, 50.0 SF (0700-2114) | EACH | 2 | $9,170.85 | $9,633.89 | $9,238.52 | $8,863.83 | $10,170 | $9,200.00 |
| 0385 | Multi-column ground sign assembly, remove (0700-2600) | EACH | 2 | $1,618.39 | $1,700.10 | $839.87 | $1,564.21 | $1,130.00 | $2,000.00 |
| 0390 | Sign panel, furnish & install ground mount, UP to 12 SF (0700-3101) | EACH | 2 | $377.62 | $396.69 | $503.92 | $364.98 | $452.00 | $355.00 |
| 0395 | Sign panel, remove, UP to 12 SF (0700-3601) | EACH | 2 | $37.76 | $39.67 | $167.98 | $36.50 | $45.20 | $50.00 |
| 0400 | Retroreflective sign strip- furnish and install, 5' (0700-13-15) | EACH | 7 | $134.86 | $141.68 | $139.98 | $130.35 | $113.00 | $110.00 |
| 0405 | Tubular marker, 36" white post (0704-1-3) | EACH | 26 | $188.81 | $198.35 | $167.97 | $182.49 | $226.00 | $180.00 |
| 0410 | Raised pavement marker, type B (0706-1-3) | EACH | 2,069 | $4.32 | $4.51 | $4.50 | $5.00 | $6.78 | $4.00 |
| 0415 | Painted pavement markings, standard, white, island nose (0710-11190) | SF | 112 | $4.32 | $4.51 | $4.50 | $5.00 | $3.39 | $4.00 |
| 0420 | Painted pavement markings, standard, yellow, island nose (0710-11290) | SF | 842 | $4.32 | $4.51 | $4.50 | $5.00 | $3.39 | $4.00 |
| 0425 | Painted pavement markings, surface (0710-90) | LS | 1 | $38,841 | $40,596 | $40,314 | $45,031 | $56,500 | $36,000 |
| 0430 | Painted pavement markings, surface (0710-90) | LS | 1 | $5,205.81 | $5,441.03 | $5,403.14 | $6,035.44 | $9,040.00 | $4,825.00 |
| 0435 | Thermoplastic, standard, solid, 8" for interchange and urban island (0711-11102) | GM | 0.50 | $6,288.65 | $6,572.78 | $6,660.22 | $7,380.12 | $11,300 | $5,900.00 |
| 0440 | Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123) | LF | 4,401 | $3.34 | $3.50 | $3.45 | $3.88 | $5.65 | $3.10 |
| 0445 | Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124) | LF | 2,679 | $5.02 | $5.24 | $5.20 | $5.82 | $6.78 | $4.65 |
| 0450 | Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125) | LF | 1,669 | $6.69 | $6.99 | $6.95 | $7.76 | $7.91 | $6.20 |
| 0455 | Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141) | GM | 4.64 | $2,264.28 | $2,366.59 | $2,284.26 | $2,626.82 | $5,650.00 | $2,100.00 |
| 0460 | Thermoplastic, standard, message or symbol (0711-11160) | EACH | 79 | $75.52 | $78.94 | $78.39 | $87.56 | $226.00 | $70.00 |
| 0465 | Thermoplastic, standard, arrow (0711-11170) | EACH | 163 | $57.18 | $59.77 | $59.35 | $66.30 | $90.40 | $53.00 |
| 0470 | Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron (0711-11224) | LF | 168 | $4.61 | $4.82 | $4.80 | $5.34 | $6.78 | $4.27 |
| 0475 | Thermoplastic, standard, yellow, 2-4 dotted guide line dotted extension line, 6" (0711-11241) | GM | 0.50 | $2,238.33 | $2,339.46 | $2,370.58 | $2,626.82 | $6,215.00 | $2,100.00 |
| 0480 | Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125) | LF | 3,758 | $16.43 | $17.17 | $17.05 | $19.05 | $16.95 | $15.23 |
| 0485 | Thermoplastic, preformed, white, message (0711-14160) | EACH | 71 | $222.26 | $232.30 | $230.68 | $257.68 | $282.50 | $206.00 |
| 0490 | Thermoplastic, preformed, white, arrow (0711-14170) | EACH | 71 | $92.79 | $96.98 | $96.30 | $107.57 | $169.50 | $86.00 |
| 0495 | Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101) | GM | 9.02 | $4,769.98 | $4,985.51 | $4,961.78 | $5,533.84 | $7,345.00 | $4,424.00 |
| 0500 | Thermoplastic, standard-other surfaces, white, skip, 6",10-30 or 3-9 lane drop (0711-16131) | GM | 5.55 | $1,193.29 | $1,247.21 | $1,240.75 | $1,383.46 | $2,486.00 | $1,106.00 |
| 0505 | Thermoplastic, standard-other surfaces white, skip, 12"- approach to toll plaza or 3-9 lane drop (0711-16133) | GM | 0.06 | $2,386.50 | $2,494.50 | $2,477.00 | $2,766.92 | $5,650.00 | $2,212.00 |
| 0510 | Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201) | GM | 3.23 | $4,378.74 | $4,576.60 | $4,558.84 | $5,086.03 | $7,345.00 | $4,066.00 |
| 0515 | Banner brackets for standard light poles (0715-52-47) | EACH | 33 | $883.77 | $928.39 | $935.99 | $866.99 | $1,872.50 | $1,697.00 |
| 0520 | Itsfm subsurface documentation- project length (0611-1-1) | MI | 5.74 | $4,659.89 | $4,886.65 | $4,926.64 | $4,567.47 | $4,313.44 | $3,931.00 |
| 0525 | Itsfm location documentation- intersection (0611-2-1) | EACH | 12 | $3,533.91 | $3,712.33 | $3,742.72 | $3,466.83 | $3,276.88 | $2,986.00 |
| 0530 | Conduit, furnish & install, open trench (0630-2-11) | LF | 1,930 | $51.37 | $53.96 | $54.40 | $50.39 | $7.36 | $36.00 |
| 0535 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 3,318 | $58.22 | $61.16 | $61.66 | $57.11 | $50.83 | $41.00 |
| 0540 | Conduit, furnish & install, aboveground (0630-2-14) | LF | 90 | $60.89 | $63.97 | $64.49 | $59.74 | $8.69 | $21.00 |
| 0545 | Signal cable- new or reconstructed intersection, furnish & install (0632-7-1) | PI | 7 | $10,613 | $11,149 | $11,241 | $10,412 | $13,375 | $9,143.00 |
| 0550 | Signal cable, remove- intersection (0632-7-6) | PI | 5 | $1,135.47 | $1,192.80 | $1,202.56 | $1,113.92 | $3,210.00 | $1,506.00 |
| 0555 | Fiber optic cable, F&I, underground,2-12 fibers (0633-1121) | LF | 1,059 | $5.70 | $5.98 | $6.05 | $5.59 | $4.01 | $5.00 |
| 0560 | Fiber optic cable, relocate, underground (0633-1420) | LF | 870 | $4.68 | $4.92 | $4.95 | $4.59 | $4.01 | $4.00 |
| 0565 | Fiber optic connection, install, splice (0633-2-31) | EACH | 102 | $64.91 | $68.19 | $68.74 | $63.68 | $32.77 | $55.00 |
| 0570 | Fiber optic connection, install, termination (0633-2-32) | EACH | 24 | $122.61 | $128.80 | $129.85 | $141.45 | $35.44 | $104.00 |
| 0575 | Fiber optic connection hardware, F&I, splice (0633-3-11) | EACH | 2 | $1,803.01 | $1,894.05 | $1,909.55 | $1,768.79 | $1,284.00 | $1,524.00 |
| 0580 | Fiber optic connection hardware, F&I, splice tray (0633-3-12) | EACH | 11 | $72.12 | $75.76 | $76.38 | $70.75 | $58.18 | $61.00 |
| 0585 | Fiber optic connection hardware, F&I, buffer tube fan out kit (0633-3-14) | EACH | 2 | $122.61 | $128.80 | $129.86 | $120.28 | $58.18 | $104.00 |
| 0590 | Fiber optic connection hardware, F&I, patch panel- terminated (0633-3-16) | EACH | 2 | $1,723.68 | $1,810.71 | $1,825.53 | $1,690.96 | $1,070.00 | $1,457.00 |
| 0595 | Fiber optic connection hardware, F&I, connector panel (0633-3-17) | EACH | 2 | $144.24 | $151.53 | $152.77 | $141.50 | $112.35 | $122.00 |
| 0600 | Fiber optic cable locator (0633-6) | DA | 380 | $252.42 | $265.17 | $267.34 | $247.63 | $160.50 | $213.00 |
| 0605 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 7 | $1,486.40 | $1,561.45 | $1,574.23 | $1,458.19 | $1,471.25 | $1,502.00 |
| 0610 | Pull & splice box, F&I, 24" X 36" cover size (0635-2-12) | EACH | 6 | $2,485.93 | $2,611.44 | $2,632.81 | $2,438.74 | $2,296.49 | $2,824.00 |
| 0615 | Pull & splice box, F&I, 30" X 60" rectangular or 36" round size (0635-2-13) | EACH | 2 | $5,670.05 | $5,956.33 | $6,005.08 | $5,562.43 | $3,823.91 | $5,849.00 |
| 0620 | Pull & splice box, F&I, 17" X 30" cover size (0635-2-14) | EACH | 89 | $1,795.08 | $1,885.71 | $1,901.15 | $1,761.01 | $1,741.43 | $1,720.00 |
| 0625 | Electrical power service, F&I, underground, meter by contractor (0639-1122) | AS | 2 | $4,299.39 | $4,516.47 | $4,553.43 | $4,217.79 | $3,945.63 | $4,894.00 |
| 0630 | Electrical service wire, & install (0639-2-1) | LF | 549 | $8.64 | $9.08 | $9.15 | $8.48 | $8.43 | $11.00 |
| 0635 | Electrical service disconnect, F&I, pole mount (0639-3-11) | EACH | 2 | $1,570.94 | $1,650.26 | $1,663.76 | $1,541.12 | $2,073.13 | $1,615.00 |
| 0640 | Prestressed concrete pole, type P-II service pole (0641-2-12) | EACH | 4 | $3,064.69 | $3,219.43 | $3,245.78 | $3,006.53 | $1,738.75 | $2,253.00 |
| 0645 | Aluminum signals pole, (0646-1-11) | EACH | 38 | $2,955.41 | $3,104.63 | $3,130.04 | $2,899.32 | $2,130.64 | $3,051.00 |
| 0650 | Aluminum signals pole, remove (0646-1-60) | EACH | 18 | $756.97 | $795.19 | $801.70 | $742.61 | $267.50 | $347.00 |
| 0655 | Aluminum pole- index 695-001, furnish & install, 15' (0646-2115) | EACH | 1 | $3,794.12 | $3,985.68 | $4,018.31 | $3,722.11 | $2,570.68 | $4,183.00 |
| 0660 | Steel mast arm assembly, and install, single arm 78' (0649-21-21) | EACH | 4 | $113,398 | $119,123 | $120,098 | $111,245 | $102,218 | $121,333 |
| 0665 | Vehicular traffic signal, furnish & install aluminum, 3 section, 1 way (0650-1-14) | AS | 16 | $1,651.78 | $1,735.18 | $1,749.38 | $1,620.43 | $1,900.59 | $1,553.00 |
| 0670 | Vehicular traffic signal, furnish & install aluminum, 3 section, 2-4 ways (0650-1-15) | AS | 1 | $3,033.46 | $3,186.63 | $3,212.70 | $2,975.88 | $3,381.20 | $2,576.00 |
| 0675 | Vehicular traffic signal, furnish & install aluminum, 4 section, 1 way (0650-1-16) | AS | 4 | $2,093.66 | $2,199.37 | $2,217.37 | $2,053.92 | $2,462.34 | $1,888.00 |
| 0680 | Vehicular signal auxiliaries, repair/replace/retrofit- & install, backplate- flexible required (0650-2109) | EACH | 36 | $664.01 | $697.54 | $703.25 | $651.41 | $802.50 | $552.00 |
| 0685 | Pedestrian signal, furnish & install LED countdown, 1 way (0653-1-11) | AS | 37 | $978.39 | $1,027.79 | $1,036.20 | $959.82 | $613.90 | $873.00 |
| 0690 | Pedestrian signal, furnish & install LED countdown, 2 ways (0653-1-12) | AS | 1 | $1,939.32 | $2,037.24 | $2,053.91 | $1,902.51 | $1,239.86 | $1,845.00 |
| 0695 | Loop detector inductive, F&I, type 10 (0660-1110) | EACH | 4 | $424.93 | $446.39 | $450.04 | $416.87 | $394.56 | $419.00 |
| 0700 | Loop assembly- F&I, type A (0660-2101) | AS | 12 | $1,847.08 | $1,940.35 | $1,956.22 | $1,812.03 | $2,808.75 | $1,521.00 |
| 0705 | Loop assembly, F&I, type F (0660-2106) | AS | 17 | $2,029.91 | $2,132.40 | $2,149.85 | $1,991.38 | $3,210.00 | $1,355.00 |
| 0710 | Vehicle detection system- microwave, adjust & modify, cabinet equipment (0660-3-51) | EACH | 1 | $1,135.47 | $1,192.80 | $1,202.56 | $1,113.92 | $1,203.75 | $394.00 |
| 0715 | Vehicle detection system - microwave, adjust & modify, above ground equipment (0660-3-52) | EACH | 6 | $946.23 | $994.00 | $1,002.14 | $928.27 | $936.25 | $1,062.00 |
| 0720 | Pedestrian detector, furnish & install, standard (0665-1-11) | EACH | 39 | $553.96 | $581.93 | $586.69 | $543.45 | $260.81 | $423.00 |
| 0725 | Traffic controller assembly, F&I, NEMA W/electronic lock (0670-5170) | AS | 2 | $60,875 | $63,949 | $64,472 | $59,720 | $49,086 | $53,535 |
| 0730 | Traffic controller assembly, modify only - no components added (0670-5710) | AS | 2 | $988.49 | $1,038.40 | $1,046.90 | $969.73 | $802.50 | $787.00 |
| 0735 | Traffic signal controller cabinet, adjust/modify (0676-1500) | EACH | 3 | $2,285.65 | $2,401.05 | $2,420.70 | $2,242.26 | $1,270.63 | $1,540.00 |
| 0740 | ITS CCTV camera, non- pressurized, IP, high definition (0682-1173) | EACH | 5 | $16,191 | $17,009 | $17,148 | $15,884 | $5,737.88 | $15,743 |
| 0745 | Managed field ethernet switch, furnish & install (0684-1-1) | EACH | 2 | $5,589.34 | $5,871.55 | $5,919.60 | $5,483.26 | $3,980.40 | $4,723.00 |
| 0750 | Uninterruptible power supply, furnish and install, line interactive with cabinet (0685-1-13) | EACH | 2 | $16,393 | $17,221 | $17,361 | $16,082 | $13,672 | $9,886.00 |
| 0755 | Traffic monitoring site vehicle sensor-non-weight, furnish & install (0695-1-1) | EACH | 14 | $2,474.68 | $2,599.63 | $2,620.91 | $2,427.71 | $4,146.25 | $2,491.00 |
| 0760 | Traffic monitoring site speed/classification unit, furnish & install, volume speed and classification (0695-3-11) | AS | 1 | $10,600 | $11,135 | $11,226 | $10,399 | $4,308.09 | $11,301 |
| 0765 | Traffic monitoring site inductive loop assembly, & install, 2 loops (0695-6-12) | EACH | 14 | $2,946.12 | $3,094.87 | $3,120.20 | $2,890.20 | $3,878.75 | $1,801.00 |
| 0770 | Traffic monitoring site cabinet, F&I, type 3, 2 pane back, pedestal mount (0695-7162) | EACH | 2 | $7,518.42 | $7,898.03 | $7,962.67 | $7,375.73 | $4,971.49 | $7,348.00 |
| 0775 | Traffic monitoring site cabinet, remove existing cabinet (0695-7600) | EACH | 2 | $756.98 | $795.20 | $801.70 | $742.61 | $1,070.00 | $472.00 |
| 0780 | Sign panel, furnish & install overhead mount, UP to 12 SF (0700-3201) | EACH | 4 | $862.63 | $906.19 | $2,201.40 | $846.26 | $1,395.01 | $911.00 |
| 0785 | Internally illuminated sign, furnish & install, overhead mount, 12-18 SF (0700-5-22) | EACH | 9 | $6,653.17 | $6,989.09 | $7,046.29 | $6,526.89 | $4,293.38 | $3,816.00 |
| 0790 | Internally illuminated sign, remove (0700-5-60) | EACH | 3 | $756.97 | $795.19 | $801.70 | $742.61 | $802.50 | $376.00 |
| 0795 | Enhanced highway sign AC powered, F&I ground mount, blank out sign <12 SF (0700-141160) | EACH | 1 | $7,204.27 | $7,568.00 | $7,629.94 | $7,067.53 | $8,025.00 | $9,679.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
Every contract let that day: FDOT letting of April 29, 2026. Compiled by Mirage Metrics.