FDOT contract T7611 bid tabulation

SR 582 (FOWLER AVE) FROM BRUCE B DOWNS BLVD TO 50TH ST. Let by Florida DOT on April 29, 2026, Hillsborough, District 7. 9 bids received; low bid $10,292,804 by Preferred Materials Inc..

Owner
Florida DOT
Letting
29 APR 2026
Pay items
159
Data through
28 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Preferred Materials Inc.$10,292,804Low
2Hubbard Construction Company$10,736,421+4.0%
3C.W. Roberts Contracting, Inc.$11,357,868+10%
4Ajax Paving Industries of Florida LLC$11,790,338+15%
5Blacktip Services Incorporated$12,269,865+19%
6Cone & Graham, Inc.$12,404,647+21%
7Burgess Civil, LLC$12,436,865+21%
8PCS Civil, Inc.$12,670,392+23%
9Nelson, David, Construction Co.$14,217,909+38%
FDOT contract T7611: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Preferred Materials Inc.2. Hubbard Construction Company3. C.W. Roberts Contracting, Inc.4. Ajax Paving Industries of Florida LLC5. Blacktip Services Incorporated6. Cone & Graham, Inc.
0005Mobilization (0101-1)LS1$594,000$446,526$930,508$705,000$550,000$1,100,000
0010Mobilization (0101-1)LS1$89,500$148,842$42,908$50,000$550,000$139,603
0015Maintenance of traffic (0102-1)DA1$242,200$391,143$509,764$825,000$220,094$755,500
0020Maintenance of traffic (0102-1)DA1$223,250$130,381$38,357$50,000$220,094$125,000
0025Pedestrian or bicycle special detour (0102-4-1)SY1$18,513$22,540$26,040$49,419$12,000$7,500.00
0030Pedestrian escort/flagger (0102-5)HR240$43.62$39.47$40.57$52.14$85.00$101.00
0035Traffic control officer (0102-14)HR1,040$91.71$94.89$95.18$109.49$68.00$95.00
0040Work zone sign (0102-60)ED16,089$0.20$0.24$0.20$0.22$0.25$0.19
0045Channelizing device- types I, II, VP, drum, or LCD (0102-74-1)ED26,485$0.11$0.10$0.10$0.09$0.15$0.10
0050Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8)FD9,965$0.04$0.07$0.05$0.06$0.35$0.04
0055Arrow board / advance warning arrow panel (0102-76)ED452$5.39$5.68$5.60$5.21$6.00$5.00
0060Portable changeable message sign, temporary (0102-99)ED760$10.79$11.36$11.20$10.43$12.00$10.00
0065Temporary signalization and maintenance, intersection (0102-104)ED3,522$5.28$5.54$5.60$5.18$26.75$9.00
0070Temporary traffic detection and maintenance, intersection (0102-107-1)ED3,420$8.87$9.32$9.40$8.70$26.75$9.00
0075Existing ITS maintenance (0102-112)DA380$119.57$125.60$126.63$117.30$29.43$244.00
0080Type III barricade (0102-115)ED781$0.27$0.34$0.30$0.31$0.35$0.25
0085Sediment barrier (0104-10-3)LF24,811$1.94$1.12$2.85$2.09$2.70$4.00
0090Soil tracking prevention device (0104-15)EACH3$500.00$5,695.66$500.00$5,384.23$500.00$2,500.00
0095Inlet protection system (0104-18)EACH86$75.52$214.97$161.25$130.35$45.00$175.00
0100Litter removal (0107-1)ACRE667.22$42.62$44.10$96.30$61.53$65.00$40.00
0105Mowing (0107-2)ACRE600.94$42.62$44.10$48.15$61.53$65.00$50.00
0110Clearing & grubbing (0110-1-1)ACRE1$220,858$232,009$66,290$133,000$479,000$975,650
0115Clearing & grubbing (0110-1-1)ACRE1$85,154$89,454$6,719.75$25,000$479,000$288,118
0120Selective clearing and areas with trees to remain (0110-2-2)ACRE3.64$7,334.84$7,705.18$9,751.04$8,265.08$21,500$11,500
0125Removal of existing concrete (0110-4-10)SY6,018$23.43$24.62$30.94$40.07$60.00$28.00
0130Tree protection barrier (0110-21)LF2,679$6.75$7.10$4.85$7.82$7.00$9.80
0135Tree root and branch pruning (0110-22)EACH39$1,051.85$1,104.96$627.10$625.68$1,000.00$1,420.00
0140Tree removal (0110-23)EACH46$1,647.61$1,730.80$2,015.68$1,355.64$1,500.00$2,300.00
0145Regular excavation (0120-1)CY3,702.20$21.92$23.03$29.58$34.48$50.00$65.00
0150Embankment (0120-6)CY1,747.20$32.49$34.13$21.26$38.71$20.00$65.00
0155Geosynthetic reinforced soil slope (0145-1)SF1,184$3.31$3.48$4.45$7.54$5.00$20.00
0160Type B stabilization (0160-4)SY4,122$29.31$30.79$19.06$14.78$19.00$24.00
0165Optional base, base group 01 (0285-701)SY424$26.88$28.23$74.05$31.42$65.00$60.00
0170Optional base, base group 06 (0285-706)SY2,325$36.11$37.23$22.98$44.55$36.00$30.00
0175Optional base, base group 15 (0285-715)SY324$120.65$100.17$131.28$263.30$95.00$105.00
0180Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6)SY46,475$3.09$3.19$3.25$3.63$3.71$3.75
0185Milling existing asphalt pavement, 3 3/4" avg depth (0327-70-20)SY84,402$2.20$2.88$3.55$6.71$3.57$3.27
0190Superpave asphaltic conc, traffic C (0334-1-13)TN366.70$141.96$124.42$157.45$168.07$141.54$128.17
0195Superpave asphaltic concrete, traffic C, PG76-22 (0334-1-53)TN10,534.30$137.03$151.14$174.22$161.51$170.16$154.42
0200Asphalt concrete friction course,traffic C, FC-12.5, PG (0337-7-83)TN10,718.70$174.30$161.84$195.66$187.99$181.94$167.30
0205Inlets, DT bot, type C,<10' (0425-1521)EACH2$9,926.19$10,427$5,780.51$5,735.42$9,500.00$9,065.00
0210Inlets, ditch bottom, type C, partial (0425-1525)EACH2$8,255.82$8,672.66$10,778$2,919.85$9,500.00$7,059.00
0215Inlets, DT bot, type D, <10' (0425-1541)EACH1$9,296.26$9,765.63$6,653.25$6,778.22$9,500.00$9,591.00
0220Manhole, adjust (0425-5)EACH6$1,330.25$1,397.41$1,610.75$282.46$1,750.00$1,250.00
0225Pipe culvert,optional material,round, 18"S/CD (0430-175118)LF300$172.77$181.49$137.03$130.35$335.00$112.00
0230Pipe culvert,optional material,round, 24"S/CD (0430-175124)LF42$291.63$306.36$316.84$156.42$335.00$181.00
0235Mitered end section, optional round, 24" CD (0430-982129)EACH1$4,563.06$4,793.46$4,086.44$2,919.85$900.00$4,000.00
0240Mitered end section, optional round, 18" SD (0430-984125)EACH8$3,521.49$3,699.29$4,059.49$2,294.17$900.00$3,750.00
0245Pipe handrail - guiderail, aluminum (0515-1-2)LF212$65.27$68.57$99.06$54.23$58.00$52.00
0250Concrete curb & gutter, type E (0520-1-7)LF1,688$44.40$46.64$47.65$57.05$35.00$28.25
0255Concrete curb & gutter, type F (0520-1-10)LF434$42.28$44.42$30.70$69.06$35.00$27.50
0260Concrete curb, type D (0520-2-4)LF249$32.52$34.16$30.70$41.30$35.00$23.25
0265Concrete traffic separator, special- variable width (0520-70)SY4,701$104.26$139.08$77.31$118.14$95.00$89.10
0270Concrete sidewalk and driveways, 4" thick (0522-1)SY9,264$56.38$59.23$54.83$56.51$62.00$42.30
0275Concrete sidewalk and driveways, 6" thick (0522-2)SY775$98.62$103.60$68.21$140.80$75.00$62.10
0280Detectable warnings (0527-2)SF906$29.74$31.24$39.79$21.90$34.00$30.75
0285Riprap, rubble, F&I, ditch lining (0530-3-4)TN4$286.38$300.84$824.71$208.56$500.00$350.00
0290Fencing, type B, 5.1-6.0', standard (0550-10220)LF105$43.16$46.25$42.52$52.14$55.00$50.00
0295Fence gate, type B, double, 18.1- 20.0' opening (0550-60224)EACH2$1,510.50$2,037.43$2,526.74$2,607.01$2,750.00$2,500.00
0300Performance turf, sod (0570-1-2)SY25,158$4.16$4.37$6.35$5.02$4.99$4.00
0305Painted pavement markings, standard, white, solid, 6" (0710-11101)GM9.98$1,832.70$1,915.51$1,905.99$2,126.48$1,356.00$1,700.00
0310Painted pavement markings, standard, white, solid for crosswalk and roundabout, 12" (0710-11123)LF6,198$1.40$1.47$1.45$1.63$1.13$1.30
0315Painted pavement markings, standard, white, solid for stop line or crosswalk, 24" (0710-11125)LF5,881$1.51$1.58$1.55$1.75$2.26$1.40
0320Painted pavement markings, standard, white, skip, 10-30 or skip, 6" wide (0710-11131)GM5.75$1.62$1.69$1.70$1.88$621.50$1,500.00
0325Painted pavement markings, standard, white, message or symbol (0710-11160)EACH98$37.76$39.47$39.19$43.78$56.50$35.00
0330Painted pavement markings, standard, white, arrows (0710-11170)EACH257$32.37$33.83$33.59$37.53$28.25$30.00
0335Painted pavement markings, standard, yellow, solid, 6" (0710-11201)GM3.60$1,830.60$1,913.32$1,905.28$2,126.48$1,356.00$1,700.00
0340Directional indicators (0919-528100)SF94$41.64$89.31$111.98$31.28$48.00$55.00
0345Initial contingency amount, DO not bid (0999-25)LS1$120,000$120,000$120,000$120,000$120,000$120,000
0350Initial contingency amount, DO not bid (0999-25)LS1$10,000$10,000$10,000$10,000$10,000$10,000
0355Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111)EACH75$523.28$549.70$951.85$505.76$678.00$580.00
0360Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112)EACH18$1,942.06$2,040.12$1,511.76$1,877.05$2,034.00$2,250.00
0365Single column ground sign assembly, relocate (0700-1500)EACH7$539.46$566.70$615.90$521.40$226.00$250.00
0370Single column ground sign assembly, remove (0700-1600)EACH62$26.97$28.33$195.97$26.07$45.20$70.00
0375Single column ground sign assembly, F&I cantilever mount, 20.1-30.0 SF (0700-1913)EACH2$2,913.09$3,060.17$4,759.24$2,815.57$4,520.00$4,300.00
0380Multi-column ground sign assembly, F&I ground mount, 50.0 SF (0700-2114)EACH2$9,170.85$9,633.89$9,238.52$8,863.83$10,170$9,200.00
0385Multi-column ground sign assembly, remove (0700-2600)EACH2$1,618.39$1,700.10$839.87$1,564.21$1,130.00$2,000.00
0390Sign panel, furnish & install ground mount, UP to 12 SF (0700-3101)EACH2$377.62$396.69$503.92$364.98$452.00$355.00
0395Sign panel, remove, UP to 12 SF (0700-3601)EACH2$37.76$39.67$167.98$36.50$45.20$50.00
0400Retroreflective sign strip- furnish and install, 5' (0700-13-15)EACH7$134.86$141.68$139.98$130.35$113.00$110.00
0405Tubular marker, 36" white post (0704-1-3)EACH26$188.81$198.35$167.97$182.49$226.00$180.00
0410Raised pavement marker, type B (0706-1-3)EACH2,069$4.32$4.51$4.50$5.00$6.78$4.00
0415Painted pavement markings, standard, white, island nose (0710-11190)SF112$4.32$4.51$4.50$5.00$3.39$4.00
0420Painted pavement markings, standard, yellow, island nose (0710-11290)SF842$4.32$4.51$4.50$5.00$3.39$4.00
0425Painted pavement markings, surface (0710-90)LS1$38,841$40,596$40,314$45,031$56,500$36,000
0430Painted pavement markings, surface (0710-90)LS1$5,205.81$5,441.03$5,403.14$6,035.44$9,040.00$4,825.00
0435Thermoplastic, standard, solid, 8" for interchange and urban island (0711-11102)GM0.50$6,288.65$6,572.78$6,660.22$7,380.12$11,300$5,900.00
0440Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123)LF4,401$3.34$3.50$3.45$3.88$5.65$3.10
0445Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124)LF2,679$5.02$5.24$5.20$5.82$6.78$4.65
0450Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125)LF1,669$6.69$6.99$6.95$7.76$7.91$6.20
0455Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141)GM4.64$2,264.28$2,366.59$2,284.26$2,626.82$5,650.00$2,100.00
0460Thermoplastic, standard, message or symbol (0711-11160)EACH79$75.52$78.94$78.39$87.56$226.00$70.00
0465Thermoplastic, standard, arrow (0711-11170)EACH163$57.18$59.77$59.35$66.30$90.40$53.00
0470Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron (0711-11224)LF168$4.61$4.82$4.80$5.34$6.78$4.27
0475Thermoplastic, standard, yellow, 2-4 dotted guide line dotted extension line, 6" (0711-11241)GM0.50$2,238.33$2,339.46$2,370.58$2,626.82$6,215.00$2,100.00
0480Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125)LF3,758$16.43$17.17$17.05$19.05$16.95$15.23
0485Thermoplastic, preformed, white, message (0711-14160)EACH71$222.26$232.30$230.68$257.68$282.50$206.00
0490Thermoplastic, preformed, white, arrow (0711-14170)EACH71$92.79$96.98$96.30$107.57$169.50$86.00
0495Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101)GM9.02$4,769.98$4,985.51$4,961.78$5,533.84$7,345.00$4,424.00
0500Thermoplastic, standard-other surfaces, white, skip, 6",10-30 or 3-9 lane drop (0711-16131)GM5.55$1,193.29$1,247.21$1,240.75$1,383.46$2,486.00$1,106.00
0505Thermoplastic, standard-other surfaces white, skip, 12"- approach to toll plaza or 3-9 lane drop (0711-16133)GM0.06$2,386.50$2,494.50$2,477.00$2,766.92$5,650.00$2,212.00
0510Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201)GM3.23$4,378.74$4,576.60$4,558.84$5,086.03$7,345.00$4,066.00
0515Banner brackets for standard light poles (0715-52-47)EACH33$883.77$928.39$935.99$866.99$1,872.50$1,697.00
0520Itsfm subsurface documentation- project length (0611-1-1)MI5.74$4,659.89$4,886.65$4,926.64$4,567.47$4,313.44$3,931.00
0525Itsfm location documentation- intersection (0611-2-1)EACH12$3,533.91$3,712.33$3,742.72$3,466.83$3,276.88$2,986.00
0530Conduit, furnish & install, open trench (0630-2-11)LF1,930$51.37$53.96$54.40$50.39$7.36$36.00
0535Conduit, furnish & install, directional bore (0630-2-12)LF3,318$58.22$61.16$61.66$57.11$50.83$41.00
0540Conduit, furnish & install, aboveground (0630-2-14)LF90$60.89$63.97$64.49$59.74$8.69$21.00
0545Signal cable- new or reconstructed intersection, furnish & install (0632-7-1)PI7$10,613$11,149$11,241$10,412$13,375$9,143.00
0550Signal cable, remove- intersection (0632-7-6)PI5$1,135.47$1,192.80$1,202.56$1,113.92$3,210.00$1,506.00
0555Fiber optic cable, F&I, underground,2-12 fibers (0633-1121)LF1,059$5.70$5.98$6.05$5.59$4.01$5.00
0560Fiber optic cable, relocate, underground (0633-1420)LF870$4.68$4.92$4.95$4.59$4.01$4.00
0565Fiber optic connection, install, splice (0633-2-31)EACH102$64.91$68.19$68.74$63.68$32.77$55.00
0570Fiber optic connection, install, termination (0633-2-32)EACH24$122.61$128.80$129.85$141.45$35.44$104.00
0575Fiber optic connection hardware, F&I, splice (0633-3-11)EACH2$1,803.01$1,894.05$1,909.55$1,768.79$1,284.00$1,524.00
0580Fiber optic connection hardware, F&I, splice tray (0633-3-12)EACH11$72.12$75.76$76.38$70.75$58.18$61.00
0585Fiber optic connection hardware, F&I, buffer tube fan out kit (0633-3-14)EACH2$122.61$128.80$129.86$120.28$58.18$104.00
0590Fiber optic connection hardware, F&I, patch panel- terminated (0633-3-16)EACH2$1,723.68$1,810.71$1,825.53$1,690.96$1,070.00$1,457.00
0595Fiber optic connection hardware, F&I, connector panel (0633-3-17)EACH2$144.24$151.53$152.77$141.50$112.35$122.00
0600Fiber optic cable locator (0633-6)DA380$252.42$265.17$267.34$247.63$160.50$213.00
0605Pull & splice box, F&I, 13" X 24" cover size (0635-2-11)EACH7$1,486.40$1,561.45$1,574.23$1,458.19$1,471.25$1,502.00
0610Pull & splice box, F&I, 24" X 36" cover size (0635-2-12)EACH6$2,485.93$2,611.44$2,632.81$2,438.74$2,296.49$2,824.00
0615Pull & splice box, F&I, 30" X 60" rectangular or 36" round size (0635-2-13)EACH2$5,670.05$5,956.33$6,005.08$5,562.43$3,823.91$5,849.00
0620Pull & splice box, F&I, 17" X 30" cover size (0635-2-14)EACH89$1,795.08$1,885.71$1,901.15$1,761.01$1,741.43$1,720.00
0625Electrical power service, F&I, underground, meter by contractor (0639-1122)AS2$4,299.39$4,516.47$4,553.43$4,217.79$3,945.63$4,894.00
0630Electrical service wire, & install (0639-2-1)LF549$8.64$9.08$9.15$8.48$8.43$11.00
0635Electrical service disconnect, F&I, pole mount (0639-3-11)EACH2$1,570.94$1,650.26$1,663.76$1,541.12$2,073.13$1,615.00
0640Prestressed concrete pole, type P-II service pole (0641-2-12)EACH4$3,064.69$3,219.43$3,245.78$3,006.53$1,738.75$2,253.00
0645Aluminum signals pole, (0646-1-11)EACH38$2,955.41$3,104.63$3,130.04$2,899.32$2,130.64$3,051.00
0650Aluminum signals pole, remove (0646-1-60)EACH18$756.97$795.19$801.70$742.61$267.50$347.00
0655Aluminum pole- index 695-001, furnish & install, 15' (0646-2115)EACH1$3,794.12$3,985.68$4,018.31$3,722.11$2,570.68$4,183.00
0660Steel mast arm assembly, and install, single arm 78' (0649-21-21)EACH4$113,398$119,123$120,098$111,245$102,218$121,333
0665Vehicular traffic signal, furnish & install aluminum, 3 section, 1 way (0650-1-14)AS16$1,651.78$1,735.18$1,749.38$1,620.43$1,900.59$1,553.00
0670Vehicular traffic signal, furnish & install aluminum, 3 section, 2-4 ways (0650-1-15)AS1$3,033.46$3,186.63$3,212.70$2,975.88$3,381.20$2,576.00
0675Vehicular traffic signal, furnish & install aluminum, 4 section, 1 way (0650-1-16)AS4$2,093.66$2,199.37$2,217.37$2,053.92$2,462.34$1,888.00
0680Vehicular signal auxiliaries, repair/replace/retrofit- & install, backplate- flexible required (0650-2109)EACH36$664.01$697.54$703.25$651.41$802.50$552.00
0685Pedestrian signal, furnish & install LED countdown, 1 way (0653-1-11)AS37$978.39$1,027.79$1,036.20$959.82$613.90$873.00
0690Pedestrian signal, furnish & install LED countdown, 2 ways (0653-1-12)AS1$1,939.32$2,037.24$2,053.91$1,902.51$1,239.86$1,845.00
0695Loop detector inductive, F&I, type 10 (0660-1110)EACH4$424.93$446.39$450.04$416.87$394.56$419.00
0700Loop assembly- F&I, type A (0660-2101)AS12$1,847.08$1,940.35$1,956.22$1,812.03$2,808.75$1,521.00
0705Loop assembly, F&I, type F (0660-2106)AS17$2,029.91$2,132.40$2,149.85$1,991.38$3,210.00$1,355.00
0710Vehicle detection system- microwave, adjust & modify, cabinet equipment (0660-3-51)EACH1$1,135.47$1,192.80$1,202.56$1,113.92$1,203.75$394.00
0715Vehicle detection system - microwave, adjust & modify, above ground equipment (0660-3-52)EACH6$946.23$994.00$1,002.14$928.27$936.25$1,062.00
0720Pedestrian detector, furnish & install, standard (0665-1-11)EACH39$553.96$581.93$586.69$543.45$260.81$423.00
0725Traffic controller assembly, F&I, NEMA W/electronic lock (0670-5170)AS2$60,875$63,949$64,472$59,720$49,086$53,535
0730Traffic controller assembly, modify only - no components added (0670-5710)AS2$988.49$1,038.40$1,046.90$969.73$802.50$787.00
0735Traffic signal controller cabinet, adjust/modify (0676-1500)EACH3$2,285.65$2,401.05$2,420.70$2,242.26$1,270.63$1,540.00
0740ITS CCTV camera, non- pressurized, IP, high definition (0682-1173)EACH5$16,191$17,009$17,148$15,884$5,737.88$15,743
0745Managed field ethernet switch, furnish & install (0684-1-1)EACH2$5,589.34$5,871.55$5,919.60$5,483.26$3,980.40$4,723.00
0750Uninterruptible power supply, furnish and install, line interactive with cabinet (0685-1-13)EACH2$16,393$17,221$17,361$16,082$13,672$9,886.00
0755Traffic monitoring site vehicle sensor-non-weight, furnish & install (0695-1-1)EACH14$2,474.68$2,599.63$2,620.91$2,427.71$4,146.25$2,491.00
0760Traffic monitoring site speed/classification unit, furnish & install, volume speed and classification (0695-3-11)AS1$10,600$11,135$11,226$10,399$4,308.09$11,301
0765Traffic monitoring site inductive loop assembly, & install, 2 loops (0695-6-12)EACH14$2,946.12$3,094.87$3,120.20$2,890.20$3,878.75$1,801.00
0770Traffic monitoring site cabinet, F&I, type 3, 2 pane back, pedestal mount (0695-7162)EACH2$7,518.42$7,898.03$7,962.67$7,375.73$4,971.49$7,348.00
0775Traffic monitoring site cabinet, remove existing cabinet (0695-7600)EACH2$756.98$795.20$801.70$742.61$1,070.00$472.00
0780Sign panel, furnish & install overhead mount, UP to 12 SF (0700-3201)EACH4$862.63$906.19$2,201.40$846.26$1,395.01$911.00
0785Internally illuminated sign, furnish & install, overhead mount, 12-18 SF (0700-5-22)EACH9$6,653.17$6,989.09$7,046.29$6,526.89$4,293.38$3,816.00
0790Internally illuminated sign, remove (0700-5-60)EACH3$756.97$795.19$801.70$742.61$802.50$376.00
0795Enhanced highway sign AC powered, F&I ground mount, blank out sign <12 SF (0700-141160)EACH1$7,204.27$7,568.00$7,629.94$7,067.53$8,025.00$9,679.00
FDOT contract T7611: unit prices by line, the 6 lowest bidders (all in the CSV)

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.

Every contract let that day: FDOT letting of April 29, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy