FDOT letting results, May 20, 2026
17 contracts let by Florida DOT on May 20, 2026, $166,456,647 in low bids, a median of 6 bidders per contract.
- Owner
- Florida DOT
- Contracts
- 17
- Low bids, total
- $166,456,647
- Data through
- 28 OCT 2026
Contracts let that day
| Contract | Project | District | Bids | Low bidder | Low bid | Second bid | Gap | Source |
|---|---|---|---|---|---|---|---|---|
| T4666 | SR 9 (I-95) AT CR 809A (NORTHLAKE BLVD) | District 4 | 8 | Ohla USA Inc | $54,604,406 | $57,939,604 | +6.0% | FDOT |
| T5882 | ELLIS RD FROM J RODES BLVD TO WICKHAM RD | District 5 | 10 | Masci General Contractors, Inc | $31,904,104 | $36,850,784 | +16% | FDOT |
| T7610 | SR 590 (DREW ST) FROM N OSCEOLA AVE TO US 19 | District 7 | 6 | Russell Engineering, Inc. | $20,715,555 | $20,823,233 | +1.0% | FDOT |
| T7595 | SR 580 (W BUSCH BLVD) AND GUNN HWY FROM N DALE MABRY HWY TO | District 7 | 8 | C.W. Roberts Contracting, Inc. | $12,762,535 | $12,835,551 | +1.0% | FDOT |
| T2A68 | CR 357 OVER SHIRED CREEK, BRIDGE NO 300043 | District 2 | 4 | Anderson Columbia Co., Inc. | $8,739,218 | $12,123,571 | +39% | FDOT |
| T7587 | SR 597 (N DALE MABRY HWY) FROM N OF W SOUTH AVE TO N OF W... | District 7 | 5 | Hubbard Construction Company | $7,418,953 | $7,469,177 | +1.0% | FDOT |
| T5863 | SR 434 FROM RANGELINE RD TO W OF SR 15/600 (US 17-92) | District 5 | 6 | Masci General Contractors, Inc | $5,972,774 | $6,631,483 | +11% | FDOT |
| T1933 | SR 25 (US 27) FROM MP 4.478 TO MP 4.856 | District 1 | 6 | Ohla USA Inc | $5,395,000 | $6,320,278 | +17% | FDOT |
| T3987 | SR 61 / SR 363 (CRAWFORDVILLE RD / ADAMS ST) FROM ARDEN RD.. | District 3 | 4 | C.W. Roberts Contracting, Inc. | $4,628,915 | $4,737,780 | +2.0% | FDOT |
| T7576 | FOREST RIDGE BLVD FROM W LAKE BEVERLY DR TO W COLBERT CT | District 7 | 3 | C.W. Roberts Contracting, Inc. | $2,959,906 | $3,236,740 | +9.0% | FDOT |
| T4737 | SR 9 (I-95) AND SR 862 (I-595) AT VARIOUS LOCATIONS AS... | District 4 | 7 | Traffic Management Solutions, LLC | $2,856,391 | $3,049,596 | +7.0% | FDOT |
| T2A66 | SR 500 (US ALT 27) AND SR 49 (US 129) AT CR 335A AND AT NW.. | District 2 | 4 | Whitehurst, V. E. & Sons, Inc. | $2,146,953 | $2,267,340 | +6.0% | FDOT |
| T3991 | SR 30 (US 98) FROM W OF ST JOE INLET BRIDGE TO ICWW BRIDGE | District 3 | 6 | C.W. Roberts Contracting, Inc. | $2,120,388 | $2,394,197 | +13% | FDOT |
| T7607 | SR 93 (I-75) AT CR 54 | District 7 | 6 | Blacktip Services Incorporated | $1,685,246 | $1,719,000 | +2.0% | FDOT |
| T3992 | SR 10 (US 90) AT W SPENCER FIELD RD | District 3 | 3 | Roads, Inc. of NWF | $1,461,250 | $1,555,497 | +6.0% | FDOT |
| T9049 | SR 93 (I-75) AT NB AND SB WILDWOOD WEIGH STATIONS | StateWide | 2 | Yoroca Engineering Contractors, LLC | $670,439 | $1,218,225 | +82% | FDOT |
| T7609 | SR 685 | District 7 | 4 | Blacktip Services Incorporated | $414,615 | $455,814 | +10% | FDOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than FDOT received, the others did not match their published totals and are left out. Each contract number opens its full bid tabulation.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.