FDOT contract T4737 bid tabulation
SR 9 (I-95) AND SR 862 (I-595) AT VARIOUS LOCATIONS AS... Let by Florida DOT on May 20, 2026, Broward, Palm Beachfed Aid No:D426024B, District 4. 7 bids received; low bid $2,856,391 by Traffic Management Solutions, LLC.
- Owner
- Florida DOT
- Letting
- 20 MAY 2026
- Pay items
- 63
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Traffic Management Solutions, LLC | $2,856,391 | Low |
| 2 | American Lighting and Signalization, LLC. | $3,049,596 | +7.0% |
| 3 | Sice Inc | $3,103,188 | +9.0% |
| 4 | Rtech Engineering, LLC | $3,363,407 | +18% |
| 5 | Arc Electric Inc | $3,456,789 | +21% |
| 6 | Aum Construction Inc. | $3,469,999 | +21% |
| 7 | Signal Technology and Installation Corp. | $3,900,737 | +37% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Traffic Management Solutions, LLC | 2. American Lighting and Signalization, LLC. | 3. Sice Inc | 4. Rtech Engineering, LLC | 5. Arc Electric Inc | 6. Aum Construction Inc. |
|---|---|---|---|---|---|---|---|---|---|
| 0005 | Mobilization (0101-1) | LS | 1 | $74,845 | $107,988 | $183,769 | $195,000 | $75,000 | $135,000 |
| 0010 | Mobilization (0101-1) | LS | 1 | $154,601 | $107,988 | $145,297 | $100,000 | $75,000 | $135,000 |
| 0015 | Maintenance of traffic (0102-1) | DA | 1 | $102,722 | $26,825 | $103,703 | $103,300 | $75,000 | $125,000 |
| 0020 | Maintenance of traffic (0102-1) | DA | 1 | $212,186 | $26,825 | $72,899 | $66,000 | $75,000 | $125,000 |
| 0025 | Work zone sign (0102-60) | ED | 1,892 | $0.28 | $0.29 | $0.26 | $0.35 | $0.30 | $1.00 |
| 0030 | Channelizing device- types I, II, VP, drum, or LCD (0102-74-1) | ED | 6,404 | $0.13 | $0.17 | $0.12 | $0.21 | $0.15 | $0.30 |
| 0035 | Portable changeable message sign, temporary (0102-99) | ED | 342 | $13.92 | $17.00 | $12.81 | $23.00 | $20.00 | $15.00 |
| 0040 | Existing ITS maintenance (0102-112) | DA | 188 | $280.96 | $156.00 | $178.13 | $160.00 | $450.00 | $100.00 |
| 0045 | Type III barricade (0102-115) | ED | 188 | $0.38 | $0.40 | $0.35 | $0.35 | $1.00 | $1.00 |
| 0050 | Litter removal (0107-1) | ACRE | 133.48 | $32.56 | $40.00 | $27.64 | $35.00 | $50.00 | $45.00 |
| 0055 | Mowing (0107-2) | ACRE | 107.69 | $40.85 | $58.00 | $142.75 | $55.00 | $20.00 | $30.00 |
| 0060 | Milling existing asphalt pavement, 2" avg depth (0327-70-5) | SY | 8,543 | $5.70 | $12.00 | $10.15 | $2.15 | $5.00 | $10.00 |
| 0065 | Superpave asphaltic conc, traffic C (0334-1-13) | TN | 472.80 | $255.71 | $231.00 | $362.99 | $208.00 | $285.00 | $385.00 |
| 0070 | Asphalt concrete friction course,traffic C, FC-9.5, PG 76-22 (0337-7-82) | TN | 472.80 | $298.75 | $289.00 | $419.65 | $230.00 | $240.00 | $385.00 |
| 0075 | Partnering, DO not bid (0999-16) | LS | 1 | $6,000.00 | $6,000.00 | $6,000.00 | $6,000.00 | $6,000.00 | $6,000.00 |
| 0080 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $29,275 | $29,275 | $29,275 | $29,275 | $29,275 | $29,275 |
| 0085 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $20,725 | $20,725 | $20,725 | $20,725 | $20,725 | $20,725 |
| 0090 | Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111) | EACH | 20 | $659.01 | $750.00 | $698.77 | $690.00 | $750.00 | $600.00 |
| 0095 | Single column ground sign assembly, F&I ground mount, 30.0 SF (0700-1113) | EACH | 1 | $3,268.51 | $2,885.00 | $3,843.24 | $2,885.00 | $4,000.00 | $3,300.00 |
| 0100 | Single column ground sign assembly, F&I barrier less than 12 SF (0700-1211) | EACH | 1 | $3,199.89 | $2,539.00 | $3,610.32 | $2,570.00 | $3,600.25 | $3,100.00 |
| 0105 | Single column ground sign assembly, remove (0700-1600) | EACH | 24 | $75.20 | $87.00 | $40.76 | $230.00 | $200.00 | $50.00 |
| 0110 | Sign panel, furnish & install overhead mount, UP to 12 SF (0700-3201) | EACH | 4 | $898.79 | $1,117.00 | $1,281.08 | $847.50 | $1,200.00 | $1,500.00 |
| 0115 | Sign panel, furnish & install overhead mount, 31-50 SF (0700-3204) | EACH | 2 | $3,138.47 | $2,496.00 | $3,493.86 | $3,262.50 | $3,300.00 | $3,000.00 |
| 0120 | Retroreflective sign strip- furnish and install, 2' (0700-13-12) | EACH | 22 | $84.68 | $129.00 | $110.64 | $110.00 | $110.00 | $100.00 |
| 0125 | Retroreflective sign strip- furnish and install, 5' (0700-13-15) | EACH | 16 | $131.76 | $181.00 | $139.75 | $135.00 | $145.00 | $150.00 |
| 0130 | Enhanced highway sign AC powered, F&I ground mount, highlighted sign <12 SF (0700-141140) | EACH | 11 | $8,299.64 | $5,692.00 | $5,526.38 | $7,000.00 | $12,500 | $6,200.00 |
| 0135 | Enhanced highway sign AC powered, F&I barrier side mount, highlighted sign <12 SF (0700-141440) | EACH | 1 | $10,666 | $4,175.00 | $8,949.28 | $8,500.00 | $15,000 | $6,500.00 |
| 0140 | Enhanced highway sign solar powered, F&I ground mount, highlighted sign <12 SF (0700-142140) | EACH | 7 | $7,949.82 | $6,998.00 | $7,443.35 | $8,750.00 | $12,000 | $7,500.00 |
| 0145 | Enhanced highway sign solar powered, F&I barrier top mount, highlighted sign <12 SF (0700-142240) | EACH | 3 | $9,499.64 | $5,422.00 | $10,851 | $10,500 | $15,000 | $8,000.00 |
| 0150 | Enhanced highway sign solar powered, F&I barrier side mount, highlighted sign <12 SF (0700-142440) | EACH | 2 | $9,194.88 | $5,422.00 | $10,810 | $11,500 | $15,000 | $8,000.00 |
| 0155 | Raised pavement marker, type B (0706-1-3) | EACH | 1,066 | $6.33 | $6.00 | $5.82 | $4.85 | $7.00 | $10.00 |
| 0160 | Painted pavement markings, surface (0710-90) | LS | 1 | $5,696.42 | $23,264 | $7,337.10 | $46,500 | $5,000.00 | $5,000.00 |
| 0165 | Painted pavement markings, surface (0710-90) | LS | 1 | $6,329.36 | $29,606 | $7,919.41 | $32,000 | $5,500.00 | $5,980.30 |
| 0170 | Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125) | LF | 24 | $15.19 | $9.00 | $13.98 | $7.50 | $15.00 | $25.00 |
| 0175 | Thermoplastic, standard, message or symbol (0711-11160) | EACH | 6 | $379.76 | $127.00 | $349.39 | $185.00 | $325.00 | $500.00 |
| 0180 | Thermoplastic, standard, arrow (0711-11170) | EACH | 97 | $113.93 | $130.00 | $104.82 | $89.00 | $120.00 | $150.00 |
| 0185 | Thermoplastic, standard-open graded asphalt surfaces solid, 6" (0711-15101) | GM | 0.70 | $10,760 | $17,265 | $9,899.26 | $6,150.00 | $9,500.00 | $12,000 |
| 0190 | Thermoplastic, standard-open graded asphalt surfaces, skip, 6",10-30 skip or 3-9 lane (0711-15131) | GM | 0.15 | $5,696.42 | $4,316.00 | $5,240.78 | $2,550.00 | $6,000.00 | $6,750.00 |
| 0195 | Thermoplastic, standard-open graded asphalt surfaces, yellow, solid, 6" (0711-15201) | GM | 0.40 | $10,760 | $15,243 | $9,899.26 | $6,050.00 | $10,000 | $12,000 |
| 0200 | Itsfm subsurface documentation- project length (0611-1-1) | MI | 3.21 | $3,071.96 | $3,808.00 | $3,843.24 | $3,450.00 | $3,500.00 | $4,300.00 |
| 0205 | Itsfm location documentation- ITS site (0611-2-2) | EACH | 11 | $1,843.18 | $2,187.00 | $2,206.95 | $2,900.00 | $2,000.00 | $2,400.00 |
| 0210 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 13,531 | $24.02 | $52.00 | $29.11 | $40.00 | $40.00 | $38.00 |
| 0215 | Conduit, furnish & install, aboveground (0630-2-14) | LF | 386 | $42.47 | $27.00 | $69.88 | $45.00 | $45.00 | $70.00 |
| 0220 | Fiber optic cable, F&I, underground,2-12 fibers (0633-1121) | LF | 17,251 | $4.87 | $4.00 | $4.48 | $4.20 | $3.75 | $4.70 |
| 0225 | Fiber optic connection, install, splice (0633-2-31) | EACH | 192 | $56.96 | $52.00 | $52.41 | $58.00 | $55.00 | $56.00 |
| 0230 | Fiber optic connection hardware, F&I, splice enclosure (0633-3-11) | EACH | 2 | $1,582.34 | $1,443.00 | $1,455.77 | $1,595.00 | $1,500.00 | $1,550.00 |
| 0235 | Fiber optic connection hardware, F&I, splice tray (0633-3-12) | EACH | 7 | $63.29 | $58.00 | $58.23 | $62.00 | $65.00 | $62.00 |
| 0240 | Fiber optic connection hardware, F&I, patch panel- terminated (0633-3-16) | EACH | 12 | $1,753.24 | $1,598.00 | $1,613.00 | $1,850.00 | $1,350.00 | $1,700.00 |
| 0245 | Fiber optic connection hardware, adjust/modify splice enclosure (0633-3-51) | EACH | 5 | $917.76 | $837.00 | $844.35 | $875.00 | $900.00 | $900.00 |
| 0250 | Fiber optic cable locator (0633-6) | DA | 213 | $191.11 | $156.00 | $157.22 | $205.00 | $200.00 | $75.00 |
| 0255 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 67 | $1,218.40 | $1,463.00 | $1,418.51 | $1,525.00 | $1,600.00 | $1,500.00 |
| 0260 | Pull & splice box, F&I, 24" X 36" cover size (0635-2-12) | EACH | 40 | $2,333.19 | $3,354.00 | $2,551.68 | $2,600.00 | $3,200.00 | $2,500.00 |
| 0265 | Junction box, furnish & install, mounted (0635-3-12) | EACH | 1 | $1,080.74 | $1,380.00 | $1,164.62 | $984.77 | $2,088.00 | $2,000.00 |
| 0270 | Electrical service wire, & install (0639-2-1) | LF | 5,741 | $18.25 | $13.00 | $7.27 | $20.00 | $15.00 | $24.00 |
| 0275 | Electrical service disconnect, F&I, pole mount (0639-3-11) | EACH | 12 | $3,120.61 | $1,570.00 | $3,617.89 | $2,550.00 | $4,000.00 | $2,500.00 |
| 0280 | Electrical power service- transformer, F&I, <5 kva, single phase, copper windings (0639-6111) | EACH | 10 | $2,493.77 | $1,321.00 | $3,306.35 | $3,050.00 | $7,410.00 | $5,000.00 |
| 0285 | Prestressed concrete pole, type P-II service pole (0641-2-12) | EACH | 12 | $1,492.07 | $1,734.00 | $2,795.00 | $2,800.00 | $3,500.00 | $2,500.00 |
| 0290 | Vehicle detection system- wrong way for exit ramp, 1 or 2 lanes, AC powered (0660-7-21) | EACH | 3 | $32,777 | $37,295 | $40,536 | $58,500 | $70,000 | $50,000 |
| 0295 | Vehicle detection system- wrong way for exit ramp, 3 or more lanes, AC powered (0660-7-22) | EACH | 8 | $32,777 | $37,523 | $40,753 | $60,500 | $70,000 | $50,000 |
| 0300 | ITS cabinet, furnish & install, base mount, 334, 24" W X 66" H X 30" D (0676-2143) | EACH | 12 | $10,701 | $8,486.00 | $15,504 | $11,950 | $9,000.00 | $14,500 |
| 0305 | Managed field ethernet switch, furnish & install (0684-1-1) | EACH | 12 | $11,755 | $15,176 | $10,350 | $11,500 | $6,500.00 | $13,500 |
| 0310 | Uninterruptible power supply, furnish and install, line interactive (0685-1-11) | EACH | 12 | $4,223.86 | $8,187.00 | $3,531.42 | $7,950.00 | $10,000 | $6,500.00 |
| 0315 | Remote power management rpmu, furnish and install (0685-2-1) | EACH | 12 | $1,184.53 | $864.00 | $840.10 | $1,150.00 | $1,000.00 | $1,500.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
Every contract let that day: FDOT letting of May 20, 2026. Compiled by Mirage Metrics.