FDOT contract T4737 bid tabulation

SR 9 (I-95) AND SR 862 (I-595) AT VARIOUS LOCATIONS AS... Let by Florida DOT on May 20, 2026, Broward, Palm Beachfed Aid No:D426024B, District 4. 7 bids received; low bid $2,856,391 by Traffic Management Solutions, LLC.

Owner
Florida DOT
Letting
20 MAY 2026
Pay items
63
Data through
28 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Traffic Management Solutions, LLC$2,856,391Low
2American Lighting and Signalization, LLC.$3,049,596+7.0%
3Sice Inc$3,103,188+9.0%
4Rtech Engineering, LLC$3,363,407+18%
5Arc Electric Inc$3,456,789+21%
6Aum Construction Inc.$3,469,999+21%
7Signal Technology and Installation Corp.$3,900,737+37%
FDOT contract T4737: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Traffic Management Solutions, LLC2. American Lighting and Signalization, LLC.3. Sice Inc4. Rtech Engineering, LLC5. Arc Electric Inc6. Aum Construction Inc.
0005Mobilization (0101-1)LS1$74,845$107,988$183,769$195,000$75,000$135,000
0010Mobilization (0101-1)LS1$154,601$107,988$145,297$100,000$75,000$135,000
0015Maintenance of traffic (0102-1)DA1$102,722$26,825$103,703$103,300$75,000$125,000
0020Maintenance of traffic (0102-1)DA1$212,186$26,825$72,899$66,000$75,000$125,000
0025Work zone sign (0102-60)ED1,892$0.28$0.29$0.26$0.35$0.30$1.00
0030Channelizing device- types I, II, VP, drum, or LCD (0102-74-1)ED6,404$0.13$0.17$0.12$0.21$0.15$0.30
0035Portable changeable message sign, temporary (0102-99)ED342$13.92$17.00$12.81$23.00$20.00$15.00
0040Existing ITS maintenance (0102-112)DA188$280.96$156.00$178.13$160.00$450.00$100.00
0045Type III barricade (0102-115)ED188$0.38$0.40$0.35$0.35$1.00$1.00
0050Litter removal (0107-1)ACRE133.48$32.56$40.00$27.64$35.00$50.00$45.00
0055Mowing (0107-2)ACRE107.69$40.85$58.00$142.75$55.00$20.00$30.00
0060Milling existing asphalt pavement, 2" avg depth (0327-70-5)SY8,543$5.70$12.00$10.15$2.15$5.00$10.00
0065Superpave asphaltic conc, traffic C (0334-1-13)TN472.80$255.71$231.00$362.99$208.00$285.00$385.00
0070Asphalt concrete friction course,traffic C, FC-9.5, PG 76-22 (0337-7-82)TN472.80$298.75$289.00$419.65$230.00$240.00$385.00
0075Partnering, DO not bid (0999-16)LS1$6,000.00$6,000.00$6,000.00$6,000.00$6,000.00$6,000.00
0080Initial contingency amount, DO not bid (0999-25)LS1$29,275$29,275$29,275$29,275$29,275$29,275
0085Initial contingency amount, DO not bid (0999-25)LS1$20,725$20,725$20,725$20,725$20,725$20,725
0090Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111)EACH20$659.01$750.00$698.77$690.00$750.00$600.00
0095Single column ground sign assembly, F&I ground mount, 30.0 SF (0700-1113)EACH1$3,268.51$2,885.00$3,843.24$2,885.00$4,000.00$3,300.00
0100Single column ground sign assembly, F&I barrier less than 12 SF (0700-1211)EACH1$3,199.89$2,539.00$3,610.32$2,570.00$3,600.25$3,100.00
0105Single column ground sign assembly, remove (0700-1600)EACH24$75.20$87.00$40.76$230.00$200.00$50.00
0110Sign panel, furnish & install overhead mount, UP to 12 SF (0700-3201)EACH4$898.79$1,117.00$1,281.08$847.50$1,200.00$1,500.00
0115Sign panel, furnish & install overhead mount, 31-50 SF (0700-3204)EACH2$3,138.47$2,496.00$3,493.86$3,262.50$3,300.00$3,000.00
0120Retroreflective sign strip- furnish and install, 2' (0700-13-12)EACH22$84.68$129.00$110.64$110.00$110.00$100.00
0125Retroreflective sign strip- furnish and install, 5' (0700-13-15)EACH16$131.76$181.00$139.75$135.00$145.00$150.00
0130Enhanced highway sign AC powered, F&I ground mount, highlighted sign <12 SF (0700-141140)EACH11$8,299.64$5,692.00$5,526.38$7,000.00$12,500$6,200.00
0135Enhanced highway sign AC powered, F&I barrier side mount, highlighted sign <12 SF (0700-141440)EACH1$10,666$4,175.00$8,949.28$8,500.00$15,000$6,500.00
0140Enhanced highway sign solar powered, F&I ground mount, highlighted sign <12 SF (0700-142140)EACH7$7,949.82$6,998.00$7,443.35$8,750.00$12,000$7,500.00
0145Enhanced highway sign solar powered, F&I barrier top mount, highlighted sign <12 SF (0700-142240)EACH3$9,499.64$5,422.00$10,851$10,500$15,000$8,000.00
0150Enhanced highway sign solar powered, F&I barrier side mount, highlighted sign <12 SF (0700-142440)EACH2$9,194.88$5,422.00$10,810$11,500$15,000$8,000.00
0155Raised pavement marker, type B (0706-1-3)EACH1,066$6.33$6.00$5.82$4.85$7.00$10.00
0160Painted pavement markings, surface (0710-90)LS1$5,696.42$23,264$7,337.10$46,500$5,000.00$5,000.00
0165Painted pavement markings, surface (0710-90)LS1$6,329.36$29,606$7,919.41$32,000$5,500.00$5,980.30
0170Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125)LF24$15.19$9.00$13.98$7.50$15.00$25.00
0175Thermoplastic, standard, message or symbol (0711-11160)EACH6$379.76$127.00$349.39$185.00$325.00$500.00
0180Thermoplastic, standard, arrow (0711-11170)EACH97$113.93$130.00$104.82$89.00$120.00$150.00
0185Thermoplastic, standard-open graded asphalt surfaces solid, 6" (0711-15101)GM0.70$10,760$17,265$9,899.26$6,150.00$9,500.00$12,000
0190Thermoplastic, standard-open graded asphalt surfaces, skip, 6",10-30 skip or 3-9 lane (0711-15131)GM0.15$5,696.42$4,316.00$5,240.78$2,550.00$6,000.00$6,750.00
0195Thermoplastic, standard-open graded asphalt surfaces, yellow, solid, 6" (0711-15201)GM0.40$10,760$15,243$9,899.26$6,050.00$10,000$12,000
0200Itsfm subsurface documentation- project length (0611-1-1)MI3.21$3,071.96$3,808.00$3,843.24$3,450.00$3,500.00$4,300.00
0205Itsfm location documentation- ITS site (0611-2-2)EACH11$1,843.18$2,187.00$2,206.95$2,900.00$2,000.00$2,400.00
0210Conduit, furnish & install, directional bore (0630-2-12)LF13,531$24.02$52.00$29.11$40.00$40.00$38.00
0215Conduit, furnish & install, aboveground (0630-2-14)LF386$42.47$27.00$69.88$45.00$45.00$70.00
0220Fiber optic cable, F&I, underground,2-12 fibers (0633-1121)LF17,251$4.87$4.00$4.48$4.20$3.75$4.70
0225Fiber optic connection, install, splice (0633-2-31)EACH192$56.96$52.00$52.41$58.00$55.00$56.00
0230Fiber optic connection hardware, F&I, splice enclosure (0633-3-11)EACH2$1,582.34$1,443.00$1,455.77$1,595.00$1,500.00$1,550.00
0235Fiber optic connection hardware, F&I, splice tray (0633-3-12)EACH7$63.29$58.00$58.23$62.00$65.00$62.00
0240Fiber optic connection hardware, F&I, patch panel- terminated (0633-3-16)EACH12$1,753.24$1,598.00$1,613.00$1,850.00$1,350.00$1,700.00
0245Fiber optic connection hardware, adjust/modify splice enclosure (0633-3-51)EACH5$917.76$837.00$844.35$875.00$900.00$900.00
0250Fiber optic cable locator (0633-6)DA213$191.11$156.00$157.22$205.00$200.00$75.00
0255Pull & splice box, F&I, 13" X 24" cover size (0635-2-11)EACH67$1,218.40$1,463.00$1,418.51$1,525.00$1,600.00$1,500.00
0260Pull & splice box, F&I, 24" X 36" cover size (0635-2-12)EACH40$2,333.19$3,354.00$2,551.68$2,600.00$3,200.00$2,500.00
0265Junction box, furnish & install, mounted (0635-3-12)EACH1$1,080.74$1,380.00$1,164.62$984.77$2,088.00$2,000.00
0270Electrical service wire, & install (0639-2-1)LF5,741$18.25$13.00$7.27$20.00$15.00$24.00
0275Electrical service disconnect, F&I, pole mount (0639-3-11)EACH12$3,120.61$1,570.00$3,617.89$2,550.00$4,000.00$2,500.00
0280Electrical power service- transformer, F&I, <5 kva, single phase, copper windings (0639-6111)EACH10$2,493.77$1,321.00$3,306.35$3,050.00$7,410.00$5,000.00
0285Prestressed concrete pole, type P-II service pole (0641-2-12)EACH12$1,492.07$1,734.00$2,795.00$2,800.00$3,500.00$2,500.00
0290Vehicle detection system- wrong way for exit ramp, 1 or 2 lanes, AC powered (0660-7-21)EACH3$32,777$37,295$40,536$58,500$70,000$50,000
0295Vehicle detection system- wrong way for exit ramp, 3 or more lanes, AC powered (0660-7-22)EACH8$32,777$37,523$40,753$60,500$70,000$50,000
0300ITS cabinet, furnish & install, base mount, 334, 24" W X 66" H X 30" D (0676-2143)EACH12$10,701$8,486.00$15,504$11,950$9,000.00$14,500
0305Managed field ethernet switch, furnish & install (0684-1-1)EACH12$11,755$15,176$10,350$11,500$6,500.00$13,500
0310Uninterruptible power supply, furnish and install, line interactive (0685-1-11)EACH12$4,223.86$8,187.00$3,531.42$7,950.00$10,000$6,500.00
0315Remote power management rpmu, furnish and install (0685-2-1)EACH12$1,184.53$864.00$840.10$1,150.00$1,000.00$1,500.00
FDOT contract T4737: unit prices by line, the 6 lowest bidders (all in the CSV)

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.

Every contract let that day: FDOT letting of May 20, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy