Arc Electric Inc: FDOT bid record
Arc Electric Inc submitted 42 bids on Florida DOT contracts in the data, from 28 FEB 2018 to 26 AUG 2026, and was the low bidder on 13 of them (31%). When it was not low, its total sat a median +14% above the low bid.
- Owner
- Florida DOT
- Low bid volume
- $11,868,175
- Latest bid
- 26 AUG 2026
- Data through
- 28 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2018 | 13 | 4 | 31% |
| 2019 | 7 | 4 | 57% |
| 2020 | 1 | 1 | 100% |
| 2021 | 3 | 1 | 33% |
| 2022 | 1 | 0 | 0% |
| 2023 | 4 | 2 | 50% |
| 2024 | 4 | 1 | 25% |
| 2025 | 3 | 0 | 0% |
| 2026 | 6 | 0 | 0% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| District 4 | 29 | 10 | 34% |
| District 6 | 12 | 3 | 25% |
| District 5 | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Pull & splice box, F&I, 13" X 24" cover size | 0635-2-11 | EACH | 52 | 14 (27%) | $700.00 | $1,150.00 |
| Aluminum signals pole, | 0646-1-11 | EACH | 12 | 12 (100%) | $1,050.00 | $2,109.50 |
| Conduit, furnish & install, directional bore | 0630-2-12 | LF | 46 | 9 (20%) | $24.50 | $30.82 |
| Removal of existing concrete | 0110-4-10 | SY | 32 | 8 (25%) | $42.50 | $33.96 |
| Conduit, furnish & install, open trench | 0630-2-11 | LF | 21 | 7 (33%) | $12.00 | $16.54 |
| Electrical power service, F&I, underground, meter by contractor | 0639-1122 | AS | 21 | 7 (33%) | $5,500.00 | $4,500.00 |
| Temporary signalization and maintenance, intersection | 0102-104 | ED | 14 | 7 (50%) | $8.00 | $15.00 |
| Lighting conductors, remove & dispose, contractor owns | 0715-1-60 | LF | 14 | 7 (50%) | $0.25 | $0.50 |
| Mowing | 0107-2 | ACRE | 14 | 6 (43%) | $162.50 | $80.65 |
| Portable changeable message sign, temporary | 0102-99 | ED | 39 | 5 (13%) | $15.00 | $12.00 |
| Load center, F&I, secondary voltage | 0715-7-11 | EACH | 14 | 5 (36%) | $15,000 | $16,670 |
| Work zone sign | 0102-60 | ED | 38 | 4 (11%) | $0.38 | $0.25 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Aum Construction Inc. | 31 | 17 of 31 |
| Signal Technology and Installation Corp. | 26 | 5 of 26 |
| Horsepower Electric, Inc. | 19 | 3 of 19 |
| American Lighting and Signalization, LLC. | 18 | 5 of 18 |
| Sice Inc | 13 | 5 of 13 |
| Under Power Corp | 13 | 1 of 13 |
| Weekley Asphalt Paving, Inc. | 13 | 4 of 13 |
| Florida Safety Contractors, Inc. | 9 | 3 of 9 |
| Powercore, Inc. | 9 | 5 of 9 |
| Traffic Management Solutions, LLC | 8 | 3 of 8 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 26 AUG 2026 | T4757 | District 4 | SR 93 (I-75) FROM SR 869 (I-595) TO SR 25 (US 27) | 3 of 12 | $6,244,444 | +2.0% |
| 26 AUG 2026 | T4773 | District 4 | SR 713 TURNPIKE FEEDER RD / KINGS HWY) FROM N OF INDRIO RD TO US 1 | 4 of 13 | $3,000,000 | +15% |
| 29 JUL 2026 | T6625 | District 6 | SR 968 (W FLAGLER ST) FROM E OF SW 48 CT TO W OF SW 48 AVE | 3 of 7 | $624,242 | +5.0% |
| 20 MAY 2026 | T4737 | District 4 | SR 9 (I-95) AND SR 862 (I-595) AT VARIOUS LOCATIONS AS... | 5 of 7 | $3,456,789 | +21% |
| 25 MAR 2026 | T4734 | District 4 | SR A1A, SR 816, SR 845, SR 810 AND SR 870 AT VARIOUS... | 3 of 7 | $1,747,475 | +3.0% |
| 28 JAN 2026 | T4750 | District 4 | SR 5 (US 1) FROM MIDWAY RD TO S OF EDWARDS RD | 5 of 11 | $2,100,000 | +13% |
| 03 DEC 2025 | T4717 | District 4 | SR 736 (DAVIE BLVD) FROM SR 9 (I-95) TO SR 5 (US 1) | 2 of 8 | $2,299,999 | +2.0% |
| 29 OCT 2025 | T4743 | District 4 | SR 805 (US 1/N DIXIE HWY) FROM N OF LUCERNE AVE TO WPB CANAL | 4 of 10 | $2,777,778 | +12% |
| 27 AUG 2025 | T6609 | District 6 | SR 986 (SUNSET DR) AND SR 94 (KENDALL DR) AT SW 72ND ST, AT | 3 of 7 | $1,777,778 | +3.0% |
| 31 JUL 2024 | T4703 | District 4 | SR 5, SR 704, SR 809, SR 882, SR 818, SR 811, SR 7 AND SR814 | 4 of 6 | $757,728 | +10% |
| 31 JUL 2024 | T4708 | District 4 | SR 814 (ATLANTIC BLVD) FROM E OF TURNPIKE TO E OF NW 28TH AV | 1 of 3 | $1,300,000 | Low, 5.0% under the second |
| 28 FEB 2024 | T4680 | District 4 | SR 882 (FOREST HILL BLVD), SR 5 (US 1), SR 805 (DIXIE HWY).. | 4 of 4 | $1,444,444 | +48% |
| 28 FEB 2024 | T6466 | District 6 | SR 916 (NE 135 ST) AT NE 12TH AVE | 4 of 5 | $904,096 | +21% |
| 06 DEC 2023 | T4658 | District 4 | SR 842, SR 845, SR 811, SR A1A AND SR 810 | 1 of 6 | $626,262 | Low, 4.0% under the second |
| 27 SEP 2023 | T4647 | District 4 | SR 817 (UNIVERSITY DR) AT 28 SEPARATE INTERSECTIONS | 1 of 4 | $555,556 | Low, 3.0% under the second |
| 13 SEP 2023 | T4664 | District 4 | SR 858 (HALLANDALE BEACH BLVD), SR 824 (PEMBROKE RD), SR 5.. | 2 of 2 | $1,250,000 | 0.0% |
| 26 JUL 2023 | T4627 | District 4 | SR 818 (GRIFFIN RD), FROM SR 7 (US 441) TO ANGLERS AVE | 3 of 6 | $2,222,222 | +21% |
| 27 APR 2022 | T4601 | District 4 | NW 9TH AVE AND SR 845 (POWERLINE RD) | 5 of 6 | $1,760,356 | +41% |
| 29 SEP 2021 | T6527 | District 6 | SR 909 (W DIXIE HWY) AND SR 915 (NE 6 AVE) | 5 of 7 | $644,456 | +23% |
| 28 JUL 2021 | T4574 | District 4 | SR 25 (US 27) | 1 of 6 | $622,222 | Low, 5.0% under the second |
| 26 MAY 2021 | T6509 | District 6 | SR 7 (NW 2ND AVE) | 6 of 6 | $864,527 | +11% |
| 29 APR 2020 | T4547 | District 4 | VEHICLE DETECTION AT SIGNALS-TRAFFIC CONTROL DEVICES/SYSTEM | 1 of 7 | $844,444 | Low, 9.0% under the second |
| 30 OCT 2019 | T4529 | District 4 | SR 93 (I-75) | 1 of 6 | $190,000 | Low, 15% under the second |
| 25 SEP 2019 | T6483 | District 6 | SR A1A (COLLINS AVE) | 1 of 2 | $1,399,991 | Low, 17% under the second |
| 25 SEP 2019 | T6484 | District 6 | SR 817 AND SR 9 | 1 of 3 | $800,000 | Low, 4.0% under the second |
How this record was read
FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
- Every bid counted here matched its published total to within one dollar; FDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.