FDOT contract T4750 bid tabulation
SR 5 (US 1) FROM MIDWAY RD TO S OF EDWARDS RD. Let by Florida DOT on January 28, 2026, St Lucie, District 4. 11 bids received; low bid $1,856,551 by Carr Construction, LLC.
- Owner
- Florida DOT
- Letting
- 28 JAN 2026
- Pay items
- 36
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Carr Construction, LLC | $1,856,551 | Low |
| 2 | American Lighting and Signalization, LLC. | $1,874,958 | +1.0% |
| 3 | New Era Electric Inc | $1,926,833 | +4.0% |
| 4 | Sice Inc | $1,984,923 | +7.0% |
| 5 | Arc Electric Inc | $2,100,000 | +13% |
| 6 | Traffic Management Solutions, LLC | $2,102,867 | +13% |
| 7 | Ferreira Construction Co., Inc. | $2,114,794 | +14% |
| 8 | Gerelco Traffic Controls, Inc. | $2,262,634 | +22% |
| 9 | Signal Technology and Installation Corp. | $2,345,343 | +26% |
| 10 | Horsepower Electric, Inc. | $2,370,442 | +28% |
| 11 | Aum Construction Inc. | $2,467,000 | +33% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Carr Construction, LLC | 2. American Lighting and Signalization, LLC. | 3. New Era Electric Inc | 4. Sice Inc | 5. Arc Electric Inc | 6. Traffic Management Solutions, LLC |
|---|---|---|---|---|---|---|---|---|---|
| 0005 | Mobilization (0101-1) | LS | 1 | $72,300 | $220,121 | $220,000 | $192,193 | $185,000 | $194,395 |
| 0010 | Maintenance of traffic (0102-1) | DA | 1 | $37,500 | $35,128 | $151,550 | $107,974 | $75,000 | $192,893 |
| 0015 | Work zone sign (0102-60) | ED | 8,064 | $0.20 | $0.24 | $0.22 | $0.35 | $0.50 | $0.30 |
| 0020 | Channelizing device- types I, II, VP, drum, or LCD (0102-74-1) | ED | 52,416 | $0.10 | $0.11 | $0.11 | $0.15 | $0.15 | $0.14 |
| 0025 | Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8) | FD | 3,360 | $0.10 | $0.07 | $0.04 | $0.06 | $0.75 | $0.10 |
| 0030 | Arrow board / advance warning arrow panel (0102-76) | ED | 168 | $5.50 | $6.51 | $2.97 | $8.64 | $10.00 | $7.72 |
| 0035 | Portable changeable message sign, temporary (0102-99) | ED | 364 | $9.50 | $11.25 | $10.45 | $18.51 | $15.00 | $15.43 |
| 0040 | Type III barricade (0102-115) | ED | 728 | $0.30 | $0.36 | $0.29 | $0.47 | $0.50 | $0.64 |
| 0045 | Sediment barrier (0104-10-3) | LF | 365 | $5.90 | $3.55 | $1.32 | $3.70 | $5.00 | $2.02 |
| 0050 | Inlet protection system (0104-18) | EACH | 6 | $566.00 | $142.06 | $160.90 | $246.80 | $301.00 | $209.90 |
| 0055 | Litter removal (0107-1) | ACRE | 52.23 | $130.00 | $41.78 | $132.00 | $1.96 | $50.00 | $33.61 |
| 0060 | Mowing (0107-2) | ACRE | 45.79 | $90.00 | $57.82 | $132.00 | $43.19 | $50.00 | $44.82 |
| 0065 | Monitor existing structures- inspection and settlement monitoring (0108-1) | LS | 1 | $5,000.00 | $1.18 | $8,768.64 | $2,467.99 | $10,000 | $3,362.12 |
| 0070 | Monitor existing structures- vibration monitoring (0108-2) | LS | 1 | $5,000.00 | $1.18 | $5,970.33 | $3,084.98 | $10,000 | $3,362.12 |
| 0075 | Tree root and branch pruning (0110-22) | EACH | 10 | $396.00 | $1,014.05 | $521.51 | $55.53 | $1,000.00 | $450.08 |
| 0080 | Performance turf, sod (0570-1-2) | SY | 46 | $41.75 | $50.52 | $4.75 | $17.89 | $100.00 | $4.57 |
| 0085 | Partnering, DO not bid (0999-16) | LS | 1 | $6,000.00 | $6,000.00 | $6,000.00 | $6,000.00 | $6,000.00 | $6,000.00 |
| 0090 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $50,000 | $50,000 | $50,000 | $50,000 | $50,000 | $50,000 |
| 0095 | Conduit, furnish & install, open trench (0630-2-11) | LF | 2,467 | $14.25 | $14.14 | $15.40 | $18.51 | $14.00 | $9.85 |
| 0100 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 11,546 | $21.50 | $18.95 | $22.00 | $30.85 | $28.00 | $34.27 |
| 0105 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 98 | $1,457.00 | $1,351.19 | $1,320.00 | $905.98 | $2,800.00 | $1,343.79 |
| 0110 | Electrical power service, F&I, underground, meter by contractor (0639-1122) | AS | 3 | $5,100.00 | $5,451.31 | $5,882.86 | $3,226.03 | $1,350.00 | $7,306.61 |
| 0115 | Electrical service wire, & install (0639-2-1) | LF | 62 | $10.00 | $4.72 | $13.26 | $22.27 | $8.00 | $8.97 |
| 0120 | Electrical service wire, (0639-2-6) | LF | 2,868 | $0.90 | $0.95 | $1.27 | $1.23 | $1.00 | $0.75 |
| 0125 | Prestressed concrete pole, type P-II service pole (0641-2-12) | EACH | 3 | $2,254.00 | $1,560.37 | $2,786.74 | $2,816.26 | $2,310.00 | $1,295.33 |
| 0130 | Lighting conductors, F&I, insulated, no.8 - 6 (0715-1-12) | LF | 49,077 | $2.20 | $1.89 | $2.09 | $2.63 | $3.50 | $2.45 |
| 0135 | Luminaire & bracket arm, luminaire and arm; pole remains (0715-5-51) | EACH | 18 | $307.00 | $329.77 | $235.22 | $473.85 | $4,000.00 | $273.55 |
| 0140 | Load center, F&I, secondary voltage (0715-7-11) | EACH | 3 | $21,054 | $11,921 | $21,419 | $11,917 | $14,000 | $13,736 |
| 0145 | Light pole complete, F&I, standard pole standard foundation, 35' mounting height, 12' arm length (0715-61242) | EACH | 1 | $9,620.00 | $8,460.51 | $9,020.00 | $8,699.27 | $7,500.00 | $7,551.42 |
| 0150 | Light pole complete, F&I, standard pole standard foundation, 40' mounting height, 12' arm length (0715-61342) | EACH | 1 | $10,742 | $9,715.76 | $8,781.49 | $9,607.68 | $7,700.00 | $8,590.86 |
| 0155 | Light pole complete, F&I, standard pole standard foundation, 45' mounting height, 8' arm length (0715-61411) | EACH | 2 | $11,035 | $9,785.24 | $10,291 | $9,915.33 | $7,700.00 | $8,879.81 |
| 0160 | Light pole complete, F&I, standard pole standard foundation, 45' mounting height, 12' arm length (0715-61442) | EACH | 66 | $11,035 | $10,512 | $8,256.05 | $9,113.42 | $8,100.00 | $9,132.71 |
| 0165 | Light pole complete, F&I, utility conflict pole standard foundation, 35' mounting height, 16' arm length (0715-65266) | EACH | 13 | $10,863 | $10,456 | $11,474 | $9,866.48 | $8,500.00 | $8,735.33 |
| 0170 | Light pole complete, remove pole and foundation (0715-69000) | EACH | 20 | $246.00 | $1,343.03 | $963.22 | $2,132.34 | $1,000.00 | $1,161.37 |
| 0175 | Pole cable distribution system, furnish and install, conventional (0715-500-1) | EACH | 83 | $1,136.00 | $604.50 | $605.00 | $679.44 | $650.00 | $842.31 |
| 0180 | Fiber optic cable locator (0633-6) | DA | 168 | $43.75 | $248.61 | $165.00 | $259.14 | $220.00 | $208.05 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
Every contract let that day: FDOT letting of January 28, 2026. Compiled by Mirage Metrics.