Aum Construction Inc.: FDOT bid record

Aum Construction Inc. submitted 89 bids on Florida DOT contracts in the data, from 28 FEB 2018 to 28 OCT 2026, and was the low bidder on 27 of them (30%). When it was not low, its total sat a median +12% above the low bid.

Owner
Florida DOT
Low bid volume
$53,328,107
Latest bid
28 OCT 2026
Data through
28 OCT 2026
89Bids
27Low bids
30Win rate, percent
+12%Median gap to the low bid when not low, 62 bids

By year

YearBidsLow bidsWin rate
20188563%
20199222%
20205360%
20218338%
20229333%
20237229%
20241119%
202518633%
202614214%
Aum Construction Inc., FDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
District 6421740%
District 442921%
District 7300%
District 1100%
District 511100%
Aum Construction Inc., FDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Conduit, furnish & install, directional bore0630-2-12LF12843 (34%)$30.00$30.82
Prestressed concrete pole, type P-II service pole0641-2-12EACH7638 (50%)$2,500.00$2,200.00
Signal cable, remove- intersection0632-7-6PI3631 (86%)$500.00$1,000.00
Pole cable distribution system, furnish and install, conventional0715-500-1EACH5829 (50%)$750.00$816.00
Traffic control officer0102-14HR5628 (50%)$80.00$80.00
Removal of existing concrete0110-4-10SY8125 (31%)$30.00$33.96
Pull & splice box, F&I, 13" X 24" cover size0635-2-11EACH13923 (17%)$1,500.00$1,150.00
Lighting conductors, F&I, insulated, no.8 - 60715-1-12LF6723 (34%)$3.00$2.40
Concrete curb & gutter, type F0520-1-10LF5722 (39%)$45.00$42.32
Electrical service wire, & install0639-2-1LF6118 (30%)$10.00$8.33
Concrete sidewalk and driveways, 4" thick0522-1SY7417 (23%)$87.50$65.00
Luminaire, F&I- replace existing luminaire on existing pole/arm, roadway, cobra head0715-11211EACH5117 (33%)$1,300.00$1,494.24
Aum Construction Inc., FDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Aum Construction Inc., FDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
28 OCT 2026T5894District 5SR 438 FROM LAKE STANLEY RD TO HIAWASSEE RD1 of 5$2,495,000Low, 3.0% under the second
30 SEP 2026T6613District 6SR 860 (MIAMI GARDENS DR) AT NW 37TH AVE AND FROM NE 6TH AVE TO W5 of 9$1,895,895+12%
26 AUG 2026T4757District 4SR 93 (I-75) FROM SR 869 (I-595) TO SR 25 (US 27)6 of 12$6,969,999+14%
26 AUG 2026T4773District 4SR 713 TURNPIKE FEEDER RD / KINGS HWY) FROM N OF INDRIO RD TO US 17 of 13$3,149,000+21%
26 AUG 2026T7624District 7SR 93 (I-275), SR 690 AND SR 686 FROM SR 686 TO OLD TAMPA BAY, FROM SR 694 TO5 of 7$1,073,950+161%
29 JUL 2026T4745District 4SR 882 FOREST HILL BLVD) FROM E OF LAKE CLARKE DR TO US1 (DIXIE HWY)6 of 6$5,999,000+13%
29 JUL 2026T4747District 4SR 5 (S FEDERAL HWY) FROM SR 5 (US1 / N DIXIE HWY) TO 10TH AVE S4 of 6$998,000+20%
29 JUL 2026T6595District 6SR 985 (SW 107 AVE) FROM SR 94 (SW 88 ST) TO N OF SW 56 ST11 of 12$5,159,159+18%
20 MAY 2026T4737District 4SR 9 (I-95) AND SR 862 (I-595) AT VARIOUS LOCATIONS AS...6 of 7$3,469,999+21%
25 MAR 2026T4734District 4SR A1A, SR 816, SR 845, SR 810 AND SR 870 AT VARIOUS...6 of 7$1,946,800+15%
25 MAR 2026T4735District 4SR 5, SR 805, SR 9, SR A1A AND SR 786 AT VARIOUS LOCATIONS..6 of 6$3,971,000+14%
25 MAR 2026T4753District 4SR 814 (W ATLANTIC BLVD) FROM W OF LAKESIDE DR TO VISTA...2 of 3$285,285+3.0%
25 MAR 2026T6589District 6SR 90 (US 41/SW 7TH ST) FROM E OF SW 27 AVE TO BRICKELL AVE1 of 6$11,399,399Low, 6.0% under the second
28 JAN 2026T4750District 4SR 5 (US 1) FROM MIDWAY RD TO S OF EDWARDS RD11 of 11$2,467,000+33%
03 DEC 2025T4717District 4SR 736 (DAVIE BLVD) FROM SR 9 (I-95) TO SR 5 (US 1)7 of 8$2,598,998+15%
03 DEC 2025T6614District 6SR 817 (NW 27 AVE) FRM SESAME ST TO DUNAD AVE2 of 6$869,7450.0%
03 DEC 2025T6615District 6SR 5 (US 1 / BISCAYNE BLVD) FROM S OF NE 38TH ST TO NE 61...7 of 8$7,397,446+18%
03 DEC 2025T6620District 6SR A1A (COLLINS AVE) FROM S OF SR 826 TO N OF 178 ST1 of 5$1,437,565Low, 2.0% under the second
29 OCT 2025T4743District 4SR 805 (US 1/N DIXIE HWY) FROM N OF LUCERNE AVE TO WPB CANAL3 of 10$2,769,699+11%
29 OCT 2025T6621District 6SR 5 (US 1 / BISCAYNE BLVD) AT VARIOUS LOCATIONS AS SHOWN IN2 of 6$3,722,534+4.0%
24 SEP 2025T4721District 4SR 811 (DIXIE HWY) FROM N OF SR 816 (OAKLAND PARK BLVD) TO..1 of 4$825,000Low, 12% under the second
24 SEP 2025T4752District 4SR 858 HALLANDALE BEACH BLVD FROM E OF SR 7 (US 441) TO SW..1 of 5$279,999Low, 5.0% under the second
27 AUG 2025T6609District 6SR 986 (SUNSET DR) AND SR 94 (KENDALL DR) AT SW 72ND ST, AT2 of 7$1,744,999+1.0%
30 JUL 2025T6599District 6SR 934 (NW 79 ST) FROM NW 27 AVE TO NW 1 PL1 of 6$5,847,847Low, 1.0% under the second
28 MAY 2025T4707District 4SR 806 (ATLANTIC AVE) AND SR 704 (OKEECHOBEE BLVD) AT HOME..4 of 6$3,479,479+10%
Aum Construction Inc.: latest FDOT bids in the data

How this record was read

FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.

  • Every bid counted here matched its published total to within one dollar; FDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy