FDOT contract T4707 bid tabulation

SR 806 (ATLANTIC AVE) AND SR 704 (OKEECHOBEE BLVD) AT HOME.. Let by Florida DOT on May 28, 2025, Palm Beach, District 4. 6 bids received; low bid $3,150,898 by Weekley Asphalt Paving, Inc..

Owner
Florida DOT
Letting
28 MAY 2025
Pay items
110
Data through
28 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Weekley Asphalt Paving, Inc.$3,150,898Low
2Signal Technology and Installation Corp.$3,414,211+8.0%
3Horsepower Electric, Inc.$3,435,793+9.0%
4Aum Construction Inc.$3,479,479+10%
5Carr Construction, LLC$3,601,698+14%
6Ranger Construction Industries, Inc.$4,100,341+30%
FDOT contract T4707: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Weekley Asphalt Paving, Inc.2. Signal Technology and Installation Corp.3. Horsepower Electric, Inc.4. Aum Construction Inc.5. Carr Construction, LLC6. Ranger Construction Industries, Inc.
0005Mobilization (0101-1)LS1$250,700$210,569$200,000$225,000$186,600$566,235
0010Maintenance of traffic (0102-1)DA1$385,750$43,481$150,000$150,000$76,144$190,575
0015Pedestrian or bicycle special detour (0102-4-1)SY1$13,400$5,288.89$75,000$5,000.00$20,000$28,350
0020Traffic control officer (0102-14)HR338$88.00$95.01$100.00$80.00$100.00$90.40
0025Work zone sign (0102-60)ED8,761$0.20$0.26$0.25$0.35$0.20$0.25
0030Channelizing device- types I, II, VP, drum, or LCD (0102-74-1)ED57,683$0.10$0.13$0.13$0.20$0.10$0.12
0035Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8)FD85,671$0.05$0.06$0.05$0.10$0.10$0.06
0040Arrow board / advance warning arrow panel (0102-76)ED630$5.00$6.34$6.25$8.00$5.00$6.05
0045Portable changeable message sign, temporary (0102-99)ED662$10.00$13.94$13.75$15.00$10.00$12.05
0050Temporary signalization and maintenance, intersection (0102-104)ED466$22.00$28.99$50.00$15.00$10.75$11.32
0055Temporary traffic detection and maintenance, intersection (0102-107-1)ED466$5.00$28.99$50.00$15.00$10.75$11.32
0060Type III barricade (0102-115)ED210$0.30$0.96$0.94$5.00$0.30$0.40
0065Sediment barrier (0104-10-3)LF507$2.45$5.67$2.00$3.50$5.50$7.50
0070Inlet protection system (0104-18)EACH14$155.00$212.37$100.00$250.00$629.00$114.60
0075Litter removal (0107-1)ACRE18.18$45.00$160.09$100.00$150.00$337.00$482.00
0080Mowing (0107-2)ACRE5.88$78.00$182.82$100.00$200.00$421.00$1,055.00
0085Monitor existing structures- inspection and settlement monitoring (0108-1)LS1$9,900.00$11,274$20,000$12,000$8,900.00$10,723
0090Clearing & grubbing (0110-1-1)ACRE1$198,964$84,518$38,000$20,000$35,000$29,230
0095Removal of existing concrete (0110-4-10)SY770$37.00$36.78$45.00$40.00$52.00$22.70
0100Regular excavation (0120-1)CY1,036$50.22$115.66$20.00$20.00$35.00$46.10
0105Embankment (0120-6)CY2$100.00$401.13$315.00$1,000.00$35.00$902.15
0110Flowable fill (0121-70)CY1.80$390.00$534.85$500.00$750.00$914.00$1,533.00
0115Type B stabilization (0160-4)SY1,582$16.29$10.17$8.00$10.00$37.50$12.30
0120Optional base, base group 06 (0285-706)SY633$40.00$58.84$70.00$60.00$52.00$95.02
0125Optional base, base group 09 (0285-709)SY446$49.00$88.92$75.00$70.00$53.00$64.20
0130Milling existing asphalt pavement, 2" avg depth (0327-70-5)SY4,698$5.50$4.93$7.00$10.00$9.30$11.73
0135Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6)SY3,003$4.00$3.83$6.00$7.50$7.70$7.35
0140Superpave asphaltic conc, traffic C (0334-1-13)TN131$300.00$402.47$275.44$360.00$338.00$379.50
0145Asphalt concrete friction course,traffic C, FC-12.5, PG (0337-7-83)TN871$228.00$220.63$305.00$365.00$225.00$295.72
0150Manhole, adjust (0425-5)EACH3$1,200.00$1,203.39$2,312.50$2,000.00$645.00$1,570.00
0155Concrete curb & gutter, type F (0520-1-10)LF774$59.73$86.34$52.50$55.00$72.00$44.72
0160Concrete traffic separator, special- variable width (0520-70)SY291$201.00$152.43$150.00$120.00$227.00$106.20
0165Concrete sidewalk and driveways, 4" thick (0522-1)SY11$125.00$133.71$275.00$115.00$107.00$600.65
0170Concrete sidewalk and driveways, 6" thick (0522-2)SY696$78.58$117.67$120.00$115.00$150.00$92.30
0175Detectable warnings (0527-2)SF161$45.00$49.48$52.50$40.00$30.00$50.12
0180Performance turf, sod (0570-1-2)SY1,153$9.50$12.04$20.00$20.00$49.75$16.25
0185Painted pavement markings, standard, white, solid, 6" (0710-11101)GM0.63$2,800.00$3,166.81$3,125.00$5,000.00$6,800.00$3,615.00
0190Painted pavement markings, standard, yellow, solid, 6" (0710-11201)GM0.26$2,800.00$3,166.81$3,125.00$7,000.00$7,062.00$3,615.00
0195Partnering, DO not bid (0999-16)LS1$6,000.00$6,000.00$6,000.00$6,000.00$6,000.00$6,000.00
0200Initial contingency amount, DO not bid (0999-25)LS1$50,000$50,000$50,000$50,000$50,000$50,000
0205Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111)EACH18$600.00$920.24$812.50$850.00$495.00$694.00
0210Single column ground sign assembly, relocate (0700-1500)EACH3$550.00$637.09$562.50$500.00$215.00$500.30
0215Single column ground sign assembly, remove (0700-1600)EACH14$30.00$70.79$62.50$100.00$50.00$60.25
0220Multi-column ground sign assembly, F&I ground mount, 30.0 SF (0700-2113)EACH1$5,900.00$9,528.65$8,125.00$7,000.00$4,400.00$7,975.00
0225Multi-column ground sign assembly, remove (0700-2600)EACH1$1,100.00$2,898.75$2,500.00$2,000.00$1,200.00$1,507.00
0230Retroreflective sign strip- furnish and install, 5' (0700-13-15)EACH8$109.00$176.97$156.25$150.00$75.00$186.75
0235Tubular marker, 36" yellow (0704-1-4)EACH25$130.00$285.02$281.25$250.00$90.00$114.50
0240Object marker, type 1 (0705-10-1)EACH1$340.00$380.02$375.00$350.00$245.00$295.20
0245Raised pavement marker, type B (0706-1-3)EACH356$4.00$12.67$12.50$12.00$5.00$4.82
0250Painted pavement markings, durable paint, yellow, island nose (0710-12290)SF28$3.50$25.34$25.00$50.00$7.00$6.02
0255Painted pavement markings, surface (0710-90)LS1$9,980.00$25,334$25,000$18,898$3,800.00$7,332.00
0260Thermoplastic, standard, solid, 8" for interchange and urban island (0711-11102)GM0.14$5,100.00$10,767$10,625$15,000$6,949.00$10,389
0265Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123)LF1,648$2.00$6.34$6.25$6.00$3.00$3.80
0270Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124)LF42$3.00$8.87$8.75$15.00$4.00$5.67
0275Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125)LF429$4.00$11.41$11.25$12.00$5.00$7.57
0280Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141)GM0.21$1,650.00$5,700.29$5,625.00$8,500.00$3,280.00$3,252.00
0285Thermoplastic, standard, message or symbol (0711-11160)EACH1$200.00$380.02$375.00$500.00$125.00$83.13
0290Thermoplastic, standard, arrow (0711-11170)EACH19$100.00$158.34$156.25$200.00$90.00$63.90
0295Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron (0711-11224)LF96$3.00$8.87$8.75$15.00$5.00$5.67
0300Thermoplastic, standard, yellow, 2-4 dotted guide line dotted extension line, 6" (0711-11241)GM0.07$1,650.00$5,700.30$5,625.00$15,000$3,059.00$2,925.00
0305Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125)LF1,502$18.00$25.34$25.00$25.00$19.00$18.70
0310Thermoplastic, preformed, white, message (0711-14160)EACH5$450.00$380.02$375.00$500.00$195.00$239.00
0315Thermoplastic, preformed, white, arrow (0711-14170)EACH5$450.00$158.34$156.25$300.00$195.00$100.00
0320Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101)GM0.61$4,800.00$9,500.43$9,375.00$10,000$6,543.00$8,128.00
0325Thermoplastic, standard-other surfaces, white, skip, 6",10-30 or 3-9 lane drop (0711-16131)GM0.40$1,800.00$5,700.26$5,625.00$7,000.00$2,659.00$2,022.00
0330Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201)GM0.79$4,800.00$9,500.41$9,375.00$10,000$6,541.00$7,645.00
0335Thermoplastic, remove existing thermoplastic pavement markings- surface to remain (0711-17-1)SF9,932$2.60$2.54$2.50$3.50$2.00$2.14
0340Channelizing curb, centerline (0921-703100)LF13$350.00$232.81$300.00$100.00$50.00$150.60
0345Conduit, furnish & install, open trench (0630-2-11)LF677$22.00$28.34$40.00$50.00$31.25$25.20
0350Conduit, furnish & install, directional bore (0630-2-12)LF1,809$38.00$76.67$40.00$75.00$55.00$59.70
0355Conduit, furnish & install, aboveground (0630-2-14)LF100$35.00$38.27$50.00$100.00$60.00$65.70
0360Signal cable- new or reconstructed intersection, furnish & install (0632-7-1)PI2$14,000$17,994$25,000$20,000$16,634$12,100
0365Fiber optic cable, F&I, underground,2-12 fibers (0633-1121)LF500$4.00$4.12$5.00$6.00$3.30$5.60
0370Fiber optic cable, F&I, underground,13-48 fibers (0633-1122)LF1,500$4.25$4.50$6.00$7.00$3.60$6.10
0375Fiber optic connection, install, termination (0633-2-32)EACH7$200.00$221.68$100.00$260.00$175.00$300.82
0380Fiber optic connection hardware, F&I, splice tray (0633-3-12)EACH2$60.00$63.34$500.00$100.00$50.00$85.95
0385Fiber optic cable locator (0633-6)DA233$165.00$349.97$100.00$150.00$168.00$409.51
0390Pull & splice box, F&I, 17" X 30" cover size (0635-2-14)EACH43$1,500.00$1,937.64$2,100.00$1,700.00$2,552.00$2,235.00
0395Pull & splice box, F&I, 30" X 48" cover size (0635-2-15)EACH3$3,000.00$3,171.81$5,000.00$2,500.00$4,905.00$5,553.00
0400Electrical power service, F&I, underground, meter by contractor (0639-1122)AS2$6,700.00$8,438.21$10,000$7,500.00$6,747.00$6,953.00
0405Electrical service wire, & install (0639-2-1)LF160$15.00$7.86$20.00$10.00$11.25$13.35
0410Prestressed concrete pole, type P-II service pole (0641-2-12)EACH2$2,500.00$2,858.11$5,000.00$2,000.00$2,522.00$4,838.00
0415Prestressed concrete pole, complete pole removal- pole 30' and greater (0641-2-80)EACH8$500.00$5,072.80$3,500.00$3,500.00$12,326$7,247.00
0420Aluminum signals pole, (0646-1-11)EACH15$1,700.00$3,598.27$4,500.00$2,000.00$3,546.00$3,320.00
0425Aluminum signals pole, remove (0646-1-60)EACH14$200.00$579.75$300.00$500.00$674.00$565.54
0430Steel mast arm assembly, and install, single arm 50' (0649-21-6)EACH1$65,000$118,069$90,000$83,000$96,061$95,440
0435Steel mast arm assembly, and install, single arm 60' (0649-21-10)EACH2$75,000$88,894$92,000$94,000$111,800$116,945
0440Steel mast arm assembly, and install, single arm 70' (0649-21-15)EACH1$82,000$99,394$100,000$125,000$128,900$132,502
0445Steel mast arm assembly, and install, double arm 70'-60' (0649-21-19)EACH1$115,000$135,336$135,000$156,000$174,800$179,172
0450Steel mast arm assembly, and install, double arm 78'-70' (0649-21-26)EACH2$122,000$140,793$140,000$165,500$188,000$187,585
0455Steel mast arm assembly, and install, double arm 78'-78' (0649-21-27)EACH1$125,000$142,249$150,000$169,000$190,100$187,795
0460Vehicular traffic signal, furnish & install aluminum, 3 section, 1 way (0650-1-14)AS33$1,800.00$1,922.53$2,800.00$1,800.00$2,324.00$2,050.00
0465Vehicular traffic signal, furnish & install aluminum, 4 section, 1 way (0650-1-16)AS2$2,000.00$2,954.06$3,500.00$2,000.00$2,811.00$3,396.00
0470Vehicular traffic signal, furnish & install aluminum, 5 section cluster, 1 way (0650-1-19)AS5$2,200.00$3,099.00$4,000.00$2,500.00$3,492.00$3,688.00
0475Pedestrian signal, furnish & install LED countdown, 1 way (0653-1-11)AS15$1,400.00$1,162.97$1,200.00$1,800.00$1,239.00$1,348.00
0480Loop detector inductive, F&I, type 10 (0660-1110)EACH22$200.00$1,841.18$500.00$600.00$863.00$570.00
0485Loop assembly, F&I, type F (0660-2106)AS33$2,800.00$2,973.47$2,000.00$2,000.00$2,284.00$2,328.00
0490Signal priority and preemption system, furnish and install, detector (0663-1122)EACH2$13,500$8,645.50$9,000.00$10,500$10,740$8,990.00
0495Signal priority and preemption system, furnish and install, cabinet electronics (0663-1123)EACH2$5,200.00$11,602$9,000.00$6,000.00$10,299$10,822
0500Pedestrian detector, furnish & install, standard (0665-1-11)EACH15$650.00$515.41$500.00$500.00$364.00$513.00
0505Traffic controller assembly, F&I, NEMA W/concrete riser, 1 preemption (0670-5116)AS1$55,000$52,919$65,000$55,000$86,827$60,660
0510Traffic controller assembly, remove controller with (0670-5600)AS2$500.00$1,449.38$1,500.00$1,500.00$1,010.00$2,263.00
0515ITS CCTV camera, F&I, dome enclosure - pressurized, IP, standard definition (0682-1112)EACH1$6,500.00$7,315.31$10,000$8,500.00$5,775.00$9,930.00
0520ITS CCTV camera, remove & disposal (0682-1600)EACH1$500.00$443.36$250.00$500.00$350.00$602.00
0525Managed field ethernet switch, furnish & install (0684-1-1)EACH2$4,400.00$4,807.21$7,500.00$7,000.00$3,795.00$6,525.00
0530Remote power management rpmu, furnish and install (0685-2-1)EACH2$1,000.00$1,059.05$1,500.00$1,000.00$2,186.00$1,935.00
0535Sign panel, furnish & install overhead mount, UP to 12 SF (0700-3201)EACH14$800.00$962.36$1,200.00$1,600.00$1,157.00$1,305.00
0540Internally illuminated sign, furnish & install, overhead mount, 12-18 SF (0700-5-22)EACH8$3,000.00$5,250.98$6,500.00$5,000.00$5,729.00$5,965.00
0545Luminaire & bracket arm- aluminum, furnish & install new luminaire and arm on new/existing pole (0715-5-31)EACH8$1,200.00$869.63$3,500.00$1,500.00$1,783.00$5,660.00
0555Atc cabinet with controller, tees, housing type 3, 44.5" W X 28" D (0923-676108)EACH1$9,500.00$91,197$80,000$100,000$86,827$103,893
FDOT contract T4707: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.

Every contract let that day: FDOT letting of May 28, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy