FDOT contract T6599 bid tabulation
SR 934 (NW 79 ST) FROM NW 27 AVE TO NW 1 PL. Let by Florida DOT on July 30, 2025, Miami-Dade, District 6. 6 bids received; low bid $5,847,847 by Aum Construction Inc..
- Owner
- Florida DOT
- Letting
- 30 JUL 2025
- Pay items
- 150
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Aum Construction Inc. | $5,847,847 | Low |
| 2 | Florida Engineering & Development Corp | $5,894,803 | +1.0% |
| 3 | Weekley Asphalt Paving, Inc. | $6,059,424 | +4.0% |
| 4 | Roadway Construction, LLC | $6,446,078 | +10% |
| 5 | Jva Engineering Contractor, Inc | $6,557,500 | +12% |
| 6 | Sice Inc | $7,053,277 | +21% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Aum Construction Inc. | 2. Florida Engineering & Development Corp | 3. Weekley Asphalt Paving, Inc. | 4. Roadway Construction, LLC | 5. Jva Engineering Contractor, Inc | 6. Sice Inc |
|---|---|---|---|---|---|---|---|---|---|
| 0005 | Mobilization (0101-1) | LS | 1 | $550,000 | $584,648 | $344,711 | $644,608 | $716,100 | $680,392 |
| 0010 | Maintenance of traffic (0102-1) | DA | 1 | $200,000 | $553,371 | $620,000 | $250,000 | $298,800 | $444,958 |
| 0015 | Traffic control officer (0102-14) | HR | 52 | $80.00 | $88.17 | $95.00 | $85.00 | $89.00 | $151.97 |
| 0020 | Work zone sign (0102-60) | ED | 19,790 | $0.25 | $0.20 | $0.19 | $0.20 | $0.24 | $0.23 |
| 0025 | Temporary barrier, F&I, low profile, concrete (0102-71-13) | LF | 1,600 | $55.00 | $47.48 | $33.00 | $0.01 | $50.00 | $58.29 |
| 0030 | Temporary barrier, relocate, low profile concrete (0102-71-23) | LF | 2,400 | $20.00 | $17.98 | $28.00 | $0.01 | $25.00 | $20.73 |
| 0035 | Channelizing device- types I, II, VP, drum, or LCD (0102-74-1) | ED | 27,639 | $0.20 | $0.12 | $0.09 | $0.08 | $0.11 | $0.15 |
| 0040 | Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8) | FD | 3,035 | $0.20 | $0.10 | $0.05 | $0.05 | $0.06 | $0.12 |
| 0045 | Arrow board / advance warning arrow panel (0102-76) | ED | 810 | $8.00 | $5.36 | $5.00 | $5.00 | $6.34 | $6.32 |
| 0050 | Temporary crash cushion, redirective option (0102-89-1) | LO | 27 | $1,150.00 | $921.85 | $3,800.00 | $0.01 | $1,330.00 | $1,088.08 |
| 0055 | Portable changeable message sign, temporary (0102-99) | ED | 924 | $15.00 | $11.64 | $9.00 | $10.00 | $11.40 | $13.74 |
| 0060 | Temporary signalization and maintenance, intersection (0102-104) | ED | 801 | $20.00 | $18.64 | $12.00 | $8.50 | $23.70 | $10.94 |
| 0065 | Temporary traffic detection and maintenance, intersection (0102-107-1) | ED | 801 | $20.00 | $18.64 | $12.00 | $8.50 | $23.70 | $10.94 |
| 0070 | Type III barricade (0102-115) | ED | 1,332 | $1.00 | $0.39 | $0.23 | $0.28 | $0.29 | $0.46 |
| 0075 | Inlet protection system (0104-18) | EACH | 51 | $250.00 | $102.20 | $165.00 | $143.29 | $271.80 | $212.75 |
| 0080 | Litter removal (0107-1) | ACRE | 79.92 | $75.00 | $110.55 | $20.00 | $0.01 | $304.00 | $48.63 |
| 0085 | Mowing (0107-2) | ACRE | 28.80 | $100.00 | $366.85 | $50.00 | $0.01 | $278.30 | $72.94 |
| 0090 | Monitor existing structures- inspection and settlement monitoring (0108-1) | LS | 1 | $32,000 | $4,429.00 | $7,000.00 | $0.01 | $5,928.00 | $32,095 |
| 0095 | Monitor existing structures- vibration monitoring (0108-2) | LS | 1 | $15,000 | $2,472.00 | $5,000.00 | $0.01 | $5,928.00 | $13,373 |
| 0100 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $30,000 | $165,938 | $197,995 | $1,459,195 | $47,400 | $91,400 |
| 0105 | Removal of existing concrete (0110-4-10) | SY | 1,796 | $40.00 | $95.83 | $67.00 | $21.21 | $108.88 | $75.25 |
| 0110 | Tree protection barrier (0110-21) | LF | 81 | $20.00 | $13.59 | $19.00 | $6.70 | $5.10 | $12.16 |
| 0115 | Borrow excavation, truck measure (0120-2-2) | CY | 358 | $90.00 | $65.99 | $60.00 | $1.68 | $31.00 | $126.71 |
| 0120 | Regular excavation (3-R projects only) (0120-71) | LS | 1 | $10,000 | $45,141 | $83,450 | $13,150 | $52,870 | $43,065 |
| 0125 | Type B stabilization (0160-4) | SY | 532 | $20.00 | $25.90 | $39.00 | $17.96 | $51.00 | $62.17 |
| 0130 | Optional base, base group 09 (0285-709) | SY | 814 | $45.00 | $102.47 | $67.00 | $55.65 | $127.00 | $150.58 |
| 0135 | Milling existing asphalt pavement, 1 1/4" avg depth (0327-70-12) | SY | 24,392 | $8.00 | $4.64 | $3.00 | $4.00 | $6.60 | $9.42 |
| 0140 | Superpave asphaltic conc, traffic C (0334-1-13) | TN | 120.90 | $450.00 | $243.05 | $320.00 | $172.20 | $343.00 | $450.50 |
| 0145 | Asphalt concrete friction course,traffic C, FC-9.5, PG 76-22 (0337-7-82) | TN | 1,726.30 | $265.00 | $216.30 | $200.00 | $240.00 | $242.00 | $376.89 |
| 0150 | Inlets, curb, type 9, <10' (0425-1201) | EACH | 1 | $16,000 | $8,824.39 | $14,000 | $6,412.71 | $8,980.00 | $17,404 |
| 0155 | Inlets, curb, type 10, <10' (0425-1211) | EACH | 1 | $15,000 | $8,934.60 | $11,000 | $7,166.97 | $9,620.00 | $19,108 |
| 0160 | Inlets, curb, type P-6, <10' (0425-1361) | EACH | 1 | $17,000 | $9,099.92 | $12,000 | $7,731.67 | $10,460 | $20,384 |
| 0165 | Inlets, DT bot, type F, <10' (0425-1561) | EACH | 2 | $15,000 | $9,266.08 | $12,000 | $8,015.29 | $9,230.00 | $22,047 |
| 0170 | Manholes, P-7, <10' (0425-2-41) | EACH | 1 | $15,000 | $10,498 | $14,000 | $6,710.13 | $15,275 | $18,086 |
| 0175 | Manholes, P-8, <10' (0425-2-61) | EACH | 4 | $15,000 | $10,553 | $26,000 | $7,736.67 | $15,725 | $21,659 |
| 0180 | Manhole, adjust (0425-5) | EACH | 7 | $2,000.00 | $984.55 | $1,200.00 | $550.00 | $1,067.00 | $863.71 |
| 0185 | Pipe culvert,optional material,round, 15"S/CD (0430-175115) | LF | 5 | $1,500.00 | $767.22 | $554.00 | $596.21 | $730.00 | $1,494.06 |
| 0190 | Pipe culvert,optional material,round, 18"S/CD (0430-175118) | LF | 128 | $550.00 | $315.28 | $566.00 | $147.27 | $290.00 | $396.32 |
| 0195 | Pipe culvert, opt material, round, 30"S/CD (0430-175130) | LF | 16 | $1,000.00 | $985.75 | $743.00 | $608.06 | $908.00 | $1,551.07 |
| 0200 | Pipe handrail - guiderail, aluminum (0515-1-2) | LF | 30 | $250.00 | $87.55 | $130.00 | $219.00 | $296.00 | $343.91 |
| 0205 | Concrete curb & gutter, type E (0520-1-7) | LF | 396 | $50.00 | $73.70 | $63.85 | $49.88 | $74.40 | $120.21 |
| 0210 | Concrete curb & gutter, type F (0520-1-10) | LF | 3,427 | $50.00 | $74.31 | $49.45 | $47.15 | $47.00 | $113.93 |
| 0215 | Traffic separator concrete- type I, 4' wide (0520-5-11) | LF | 363 | $160.00 | $122.41 | $92.00 | $63.18 | $77.40 | $149.91 |
| 0220 | Traffic separator concrete- type IV, 4' wide (0520-5-41) | LF | 31 | $150.00 | $443.67 | $106.00 | $140.07 | $172.00 | $324.21 |
| 0225 | Concrete sidewalk and driveways, 4" thick (0522-1) | SY | 818 | $100.00 | $101.39 | $67.00 | $68.34 | $130.00 | $160.52 |
| 0230 | Concrete sidewalk and driveways, 6" thick (0522-2) | SY | 822 | $130.00 | $108.78 | $78.00 | $81.00 | $143.20 | $189.12 |
| 0235 | Detectable warnings (0527-2) | SF | 434 | $45.00 | $41.03 | $36.00 | $30.97 | $41.40 | $71.07 |
| 0240 | Fencing, type B, 6.1-7.0, W/ barb wire attmt (0550-10231) | LF | 30 | $100.00 | $61.80 | $79.00 | $83.50 | $60.00 | $343.92 |
| 0245 | Performance turf, sod (0570-1-2) | SY | 695 | $20.00 | $8.05 | $9.80 | $28.56 | $12.60 | $73.81 |
| 0250 | Electrical power service- contribution in aid of construction (ciac), FPL (DO not bid) (0639-8130) | LS | 1 | $16,000 | $16,000 | $16,000 | $16,000 | $16,000 | $16,000 |
| 0255 | Raised pavement marker, type B (0706-1-3) | EACH | 858 | $7.50 | $5.15 | $5.00 | $3.50 | $5.90 | $5.50 |
| 0260 | Painted pavement markings, standard, white, solid, 6" (0710-11101) | GM | 1.61 | $3,000.00 | $1,631.52 | $1,584.00 | $1,504.67 | $1,880.00 | $2,362.91 |
| 0265 | Painted pavement markings, standard, white, solid for interchange and urban island, (0710-11102) | GM | 0.15 | $6,000.00 | $1,903.49 | $1,848.00 | $1,973.68 | $2,190.00 | $3,099.43 |
| 0270 | Painted pavement markings, standard, white, solid for crosswalk and roundabout, 12" (0710-11123) | LF | 3,816 | $1.75 | $0.62 | $0.60 | $1.40 | $0.71 | $2.20 |
| 0275 | Painted pavement markings, standard, white, solid for diagonal or chevron, 18" (0710-11124) | LF | 241 | $3.00 | $0.93 | $0.90 | $1.50 | $1.07 | $2.36 |
| 0280 | Painted pavement markings, standard, white, solid for stop line or crosswalk, 24" (0710-11125) | LF | 3,903 | $2.50 | $1.24 | $1.20 | $1.60 | $1.40 | $2.51 |
| 0285 | Painted pavement markings, standard, white, skip, 10-30 or skip, 6" wide (0710-11131) | GM | 1.05 | $2,200.00 | $407.87 | $396.00 | $488.14 | $470.00 | $766.57 |
| 0290 | Painted pavement markings, standard, white, 2-4 dotted guideline/ 6-10 dotted 6" (0710-11141) | GM | 0.07 | $12,000 | $407.84 | $396.00 | $614.86 | $470.00 | $965.57 |
| 0295 | Painted pavement markings, standard, white, message or symbol (0710-11160) | EACH | 27 | $150.00 | $61.80 | $60.00 | $35.00 | $71.10 | $54.96 |
| 0300 | Painted pavement markings, standard, white, arrows (0710-11170) | EACH | 35 | $100.00 | $41.20 | $40.00 | $35.00 | $47.40 | $54.96 |
| 0305 | Painted pavement markings, standard, yellow, solid, 6" (0710-11201) | GM | 1.11 | $3,500.00 | $1,631.52 | $1,584.00 | $1,706.15 | $1,880.00 | $2,679.31 |
| 0310 | Painted pavement markings, standard, yellow, solid for diagonal or chevron, 18" (0710-11224) | LF | 104 | $5.00 | $0.93 | $0.90 | $1.50 | $1.07 | $2.36 |
| 0315 | Painted pavement markings, standard, yellow, skip, 6" (0710-11231) | GM | 0.02 | $15,000 | $407.89 | $396.00 | $515.79 | $470.00 | $809.99 |
| 0320 | Painted pavement markings, standard, yellow, 2-4 dotted guideline/6-10 dotted extension, 6" (0710-11241) | GM | 0.29 | $3,000.00 | $407.90 | $396.00 | $659.09 | $470.00 | $1,035.02 |
| 0325 | Painted pavement markings, standard, yellow, island nose (0710-11290) | SF | 92 | $20.00 | $2.06 | $2.00 | $5.00 | $2.30 | $7.85 |
| 0330 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $57,616 | $57,616 | $57,616 | $57,616 | $57,616 | $57,616 |
| 0335 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 5 | $1,750.00 | $991.48 | $2,000.00 | $1,399.00 | $2,371.00 | $1,033.37 |
| 0340 | Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111) | EACH | 107 | $700.00 | $540.75 | $525.00 | $450.00 | $622.00 | $595.71 |
| 0345 | Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112) | EACH | 1 | $2,500.00 | $2,672.85 | $2,595.00 | $1,300.00 | $3,080.00 | $2,005.96 |
| 0350 | Single column ground sign assembly, F&I ground mount, 30.0 SF (0700-1113) | EACH | 7 | $2,800.00 | $2,878.85 | $2,795.00 | $1,800.00 | $3,315.00 | $2,604.37 |
| 0355 | Single column ground sign assembly, remove (0700-1600) | EACH | 35 | $50.00 | $10.30 | $10.00 | $20.00 | $12.00 | $121.57 |
| 0360 | Multi-column ground sign assembly, F&I ground mount, 30.0 SF (0700-2113) | EACH | 1 | $9,000.00 | $6,586.85 | $6,395.00 | $3,900.00 | $7,585.00 | $7,172.82 |
| 0365 | Retroreflective sign strip- furnish and install, 5' (0700-13-15) | EACH | 7 | $150.00 | $257.50 | $250.00 | $120.00 | $296.00 | $170.20 |
| 0370 | Enhanced highway sign solar powered, F&I ground mount, highlighted sign <12 SF (0700-142140) | EACH | 5 | $15,000 | $11,304 | $14,000 | $13,769 | $26,000 | $10,833 |
| 0375 | Tubular marker, 36" yellow (0704-1-4) | EACH | 41 | $200.00 | $97.85 | $95.00 | $93.00 | $112.60 | $267.46 |
| 0380 | Raised pavement marker, type B (0706-1-3) | EACH | 858 | $7.50 | $5.15 | $5.00 | $3.50 | $5.90 | $5.50 |
| 0385 | Painted pavement markings, durable paint, yellow, island nose (0710-12290) | SF | 92 | $15.00 | $2.06 | $2.00 | $5.00 | $2.40 | $7.85 |
| 0390 | Painted pavement markings, surface (0710-90) | LS | 1 | $25,000 | $17,068 | $16,571 | $12,186 | $19,600 | $19,137 |
| 0395 | Thermoplastic, standard, solid, 8" for interchange and urban island (0711-11102) | GM | 0.02 | $16,000 | $6,797.83 | $6,600.00 | $6,085.22 | $7,825.00 | $9,556.12 |
| 0400 | Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123) | LF | 3,815 | $2.75 | $2.47 | $2.40 | $3.10 | $2.85 | $4.87 |
| 0405 | Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124) | LF | 241 | $4.00 | $4.12 | $4.00 | $4.65 | $4.70 | $7.30 |
| 0410 | Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125) | LF | 564 | $5.00 | $5.15 | $5.00 | $6.20 | $5.90 | $9.74 |
| 0415 | Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141) | GM | 0.07 | $7,500.00 | $1,631.62 | $1,584.00 | $2,128.38 | $1,880.00 | $3,342.37 |
| 0420 | Thermoplastic, standard, message or symbol (0711-11160) | EACH | 10 | $250.00 | $123.60 | $120.00 | $85.00 | $142.00 | $133.48 |
| 0425 | Thermoplastic, standard, arrow (0711-11170) | EACH | 35 | $150.00 | $82.40 | $80.00 | $61.00 | $95.00 | $95.79 |
| 0430 | Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron (0711-11224) | LF | 104 | $8.00 | $3.71 | $3.60 | $4.26 | $4.20 | $6.69 |
| 0435 | Thermoplastic, standard, yellow, 2-4 dotted guide line dotted extension line, 6" (0711-11241) | GM | 0.29 | $5,000.00 | $6,526.08 | $6,336.00 | $2,281.47 | $7,515.00 | $3,582.78 |
| 0440 | Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125) | LF | 3,318 | $24.00 | $19.57 | $19.00 | $16.00 | $22.50 | $25.13 |
| 0445 | Thermoplastic, preformed, white, message (0711-14160) | EACH | 17 | $600.00 | $267.80 | $260.00 | $310.00 | $308.00 | $486.82 |
| 0450 | Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101) | GM | 1.61 | $7,500.00 | $6,526.08 | $6,336.00 | $5,263.35 | $7,515.00 | $8,265.47 |
| 0455 | Thermoplastic, standard-other surfaces, white, solid, 8" (0711-16102) | GM | 0.13 | $12,000 | $6,798.29 | $6,600.00 | $7,052.25 | $7,825.00 | $11,075 |
| 0460 | Thermoplastic, standard-other surfaces, white, skip, 6",10-30 or 3-9 lane drop (0711-16131) | GM | 1.06 | $3,500.00 | $2,266.00 | $2,200.00 | $1,315.72 | $2,610.00 | $2,066.18 |
| 0465 | Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201) | GM | 1.11 | $7,500.00 | $6,526.08 | $6,336.00 | $4,841.45 | $7,510.00 | $7,602.93 |
| 0470 | Thermoplastic, standard-other surfaces, yellow, skip, 6" (0711-16231) | GM | 0.02 | $15,000 | $2,265.79 | $2,200.00 | $1,269.47 | $2,610.00 | $1,993.55 |
| 0475 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 2,901 | $30.00 | $45.00 | $42.00 | $30.00 | $33.20 | $48.63 |
| 0480 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 42 | $1,750.00 | $1,100.00 | $1,800.00 | $1,399.00 | $1,423.00 | $1,033.37 |
| 0485 | Pull & splice box, install (0635-2-30) | EACH | 3 | $1,500.00 | $1,250.00 | $1,800.00 | $1,017.50 | $1,185.00 | $607.87 |
| 0490 | Electrical power service, F&I, underground, meter by contractor (0639-1122) | AS | 3 | $7,000.00 | $6,000.00 | $8,500.00 | $5,781.50 | $6,165.00 | $5,207.59 |
| 0495 | Electrical power service, remove underground (0639-1620) | AS | 3 | $750.00 | $850.00 | $750.00 | $1,485.00 | $1,010.00 | $1,400.52 |
| 0500 | Prestressed concrete pole, type P-II service pole (0641-2-12) | EACH | 3 | $2,000.00 | $2,900.00 | $3,500.00 | $3,036.00 | $2,964.00 | $2,400.74 |
| 0505 | Prestressed concrete pole, complete pole removal- pedestal/service pole (0641-2-60) | EACH | 3 | $750.00 | $650.00 | $500.00 | $995.50 | $1,010.00 | $1,050.39 |
| 0510 | Lighting conductors, F&I, insulated, no.8 - 6 (0715-1-12) | LF | 9,075 | $3.50 | $5.00 | $5.00 | $2.90 | $3.50 | $3.14 |
| 0515 | Lighting conductors, F&I, insulated, no 4 to no 2 (0715-1-13) | LF | 1,646 | $6.00 | $5.00 | $7.00 | $4.50 | $5.30 | $6.22 |
| 0520 | Lighting conductors, remove & dispose, contractor owns (0715-1-60) | LF | 7,236 | $0.25 | $0.25 | $0.25 | $0.20 | $0.59 | $1.06 |
| 0525 | Load center, F&I, secondary voltage (0715-7-11) | EACH | 3 | $16,500 | $16,000 | $18,000 | $17,636 | $26,600 | $12,948 |
| 0530 | Load center, remove, voltage (0715-7-41) | EACH | 3 | $500.00 | $900.00 | $500.00 | $594.00 | $17,785 | $1,400.52 |
| 0535 | Luminaire, F&I- replace existing luminaire on existing pole/arm, roadway, cobra head (0715-11211) | EACH | 7 | $1,300.00 | $1,500.00 | $1,800.00 | $1,542.00 | $2,194.00 | $1,195.49 |
| 0540 | Light pole complete, F&I, standard pole standard foundation, 40' mounting height, 15' arm length (0715-61352) | EACH | 6 | $8,600.00 | $7,500.00 | $12,000 | $8,000.00 | $11,265 | $8,896.32 |
| 0545 | Light pole complete, F&I, utility conflict pole standard foundation, 35' mounting height, 16' arm length (0715-65266) | EACH | 1 | $9,000.00 | $8,000.00 | $12,500 | $8,010.00 | $17,784 | $13,529 |
| 0550 | Light pole complete, remove pole and foundation (0715-69000) | EACH | 1 | $2,209.15 | $650.00 | $1,500.00 | $632.50 | $1,185.00 | $1,565.86 |
| 0555 | Pole cable distribution system, furnish and install, conventional (0715-500-1) | EACH | 26 | $750.00 | $750.00 | $1,200.00 | $1,232.00 | $1,720.00 | $974.17 |
| 0560 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 4,272 | $40.00 | $60.00 | $48.00 | $38.00 | $39.10 | $49.96 |
| 0565 | Signal cable- new or reconstructed intersection, furnish & install (0632-7-1) | PI | 11 | $12,000 | $12,000 | $14,000 | $10,098 | $12,450 | $14,615 |
| 0570 | Signal cable, remove- intersection (0632-7-6) | PI | 7 | $500.00 | $750.00 | $800.00 | $1,728.00 | $950.00 | $1,575.59 |
| 0575 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 223 | $1,750.00 | $1,000.00 | $1,700.00 | $1,399.00 | $1,422.70 | $1,033.37 |
| 0580 | Pull & splice box, F&I, 24" X 36" cover size (0635-2-12) | EACH | 11 | $2,500.00 | $2,000.00 | $3,000.00 | $3,455.50 | $3,035.00 | $1,823.60 |
| 0585 | Pull & splice box, install (0635-2-30) | EACH | 11 | $1,500.00 | $850.00 | $1,700.00 | $1,017.50 | $1,185.00 | $729.44 |
| 0595 | Electrical power service, F&I, underground, meter by contractor (0639-1122) | AS | 11 | $7,000.00 | $6,000.00 | $4,800.00 | $5,592.50 | $6,165.00 | $5,207.59 |
| 0600 | Electrical power service, remove overhead (0639-1610) | AS | 8 | $750.00 | $560.00 | $500.00 | $1,498.50 | $1,010.00 | $1,400.52 |
| 0605 | Electrical service wire, & install (0639-2-1) | LF | 2,404 | $8.00 | $11.00 | $10.00 | $10.00 | $11.80 | $8.46 |
| 0610 | Electrical service wire, (0639-2-6) | LF | 650 | $1.00 | $0.10 | $1.00 | $1.20 | $1.19 | $1.82 |
| 0615 | Prestressed concrete pole, type P-II service pole (0641-2-12) | EACH | 11 | $2,000.00 | $2,550.00 | $3,800.00 | $3,292.50 | $2,905.00 | $2,400.74 |
| 0620 | Prestressed concrete pole, complete pole removal- pedestal/service pole (0641-2-60) | EACH | 3 | $750.00 | $750.00 | $500.00 | $1,089.00 | $1,010.00 | $1,050.39 |
| 0625 | Aluminum signals pole, (0646-1-11) | EACH | 31 | $2,000.00 | $2,210.00 | $2,000.00 | $2,985.00 | $2,350.00 | $1,394.91 |
| 0630 | Aluminum signals pole, furnish install pedestrian detector post (0646-1-12) | EACH | 8 | $1,900.00 | $2,100.00 | $2,200.00 | $2,568.00 | $2,134.00 | $1,169.11 |
| 0635 | Aluminum signals pole, remove (0646-1-60) | EACH | 15 | $250.00 | $600.00 | $100.00 | $267.00 | $237.10 | $466.84 |
| 0640 | Steel mast arm assembly, and install, single arm 40' (0649-21-3) | EACH | 1 | $62,000 | $55,000 | $50,000 | $54,737 | $78,000 | $68,264 |
| 0645 | Steel mast arm assembly, and install, double arm 40'-30' (0649-21-4) | EACH | 1 | $79,000 | $70,000 | $95,000 | $69,245 | $110,800 | $83,049 |
| 0650 | Steel mast arm assembly, and install, single arm 50' (0649-21-6) | EACH | 1 | $62,000 | $65,000 | $65,000 | $86,422 | $88,400 | $71,960 |
| 0655 | Steel mast arm assembly, and install, double arm 50'-30' (0649-21-7) | EACH | 1 | $83,000 | $70,000 | $100,000 | $82,309 | $116,900 | $88,297 |
| 0660 | Steel mast arm assembly, and install, single arm 60' (0649-21-10) | EACH | 3 | $75,000 | $70,000 | $88,000 | $66,527 | $94,250 | $80,234 |
| 0665 | Steel mast arm assembly, and install, single arm 78' (0649-21-21) | EACH | 1 | $95,000 | $82,500 | $10,000 | $86,455 | $111,400 | $90,783 |
| 0670 | Steel mast arm assembly, remove, shallow foundation- bolt on attachment (0649-26-3) | EACH | 3 | $5,000.00 | $3,500.00 | $4,000.00 | $4,983.00 | $4,150.00 | $10,942 |
| 0675 | Vehicular traffic signal, furnish & install aluminum, 3 section, 1 way (0650-1-14) | AS | 33 | $2,000.00 | $1,500.00 | $2,000.00 | $1,796.00 | $1,612.00 | $1,596.03 |
| 0680 | Vehicular signal auxiliaries, repair/replace/retrofit- & install, backplate- flexible required (0650-2109) | EACH | 38 | $350.00 | $500.00 | $800.00 | $558.00 | $1,010.00 | $497.59 |
| 0685 | Pedestrian signal, furnish & install LED countdown, 1 way (0653-1-11) | AS | 26 | $1,800.00 | $750.00 | $1,300.00 | $947.50 | $978.00 | $962.98 |
| 0690 | Pedestrian signal, furnish & install LED countdown, 2 ways (0653-1-12) | AS | 9 | $2,200.00 | $1,550.00 | $1,800.00 | $1,649.50 | $1,482.00 | $1,791.17 |
| 0695 | Pedestrian signal, remove ped signal- pole/pedestal to remain (0653-1-60) | AS | 2 | $250.00 | $95.00 | $500.00 | $179.00 | $77.00 | $350.13 |
| 0700 | Vehicle detection system- furnish & install cabinet equipment (0660-4-11) | EACH | 21 | $5,500.00 | $5,050.00 | $4,500.00 | $5,065.00 | $6,285.00 | $5,422.79 |
| 0705 | Vehicle detection system- furnish & install above ground equipment (0660-4-12) | EACH | 21 | $3,500.00 | $2,750.00 | $3,500.00 | $4,115.50 | $3,794.00 | $4,164.44 |
| 0710 | Pedestrian detector, furnish & install, standard (0665-1-11) | EACH | 54 | $350.00 | $325.00 | $800.00 | $533.50 | $415.00 | $572.21 |
| 0715 | Pedestrian detector, remove- pole/pedestal to remain (0665-1-60) | EACH | 7 | $50.00 | $95.00 | $300.00 | $66.00 | $60.00 | $233.42 |
| 0720 | Traffic controller assembly, F&I, caltrans W/standard lock (0670-5180) | AS | 5 | $50,000 | $45,000 | $46,000 | $48,271 | $61,650 | $45,653 |
| 0725 | Traffic controller assembly, remove controller with (0670-5600) | AS | 2 | $1,500.00 | $750.00 | $1,500.00 | $1,518.00 | $1,010.00 | $10,611 |
| 0730 | Cellular modem, furnish and install (0684-8-1) | EACH | 5 | $2,500.00 | $1,900.00 | $5,000.00 | $4,947.00 | $5,930.00 | $1,970.97 |
| 0735 | Sign panel, furnish & install overhead mount, UP to 12 SF (0700-3201) | EACH | 7 | $1,200.00 | $1,050.00 | $1,000.00 | $963.50 | $1,423.00 | $829.40 |
| 0740 | Sign panel, remove, UP to 12 SF (0700-3601) | EACH | 7 | $100.00 | $260.00 | $400.00 | $139.50 | $83.00 | $175.07 |
| 0745 | Internally illuminated sign, furnish & install, overhead mount, 12-18 SF (0700-5-22) | EACH | 6 | $3,500.00 | $2,750.00 | $4,200.00 | $3,313.50 | $3,675.00 | $3,364.58 |
| 0750 | Enhanced highway sign AC powered, F&I overhead blank out sign 12-16 SF (0700-141390) | EACH | 4 | $9,000.00 | $6,000.00 | $15,000 | $13,837 | $10,670 | $12,132 |
| 0755 | Relocate trees and palms, palms, <10.0" DBH, 14.0' or of clear trunk (0581-1272) | EACH | 1 | $12,000 | $10,300 | $4,450.00 | $6,500.00 | $5,335.00 | $6,686.53 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
Every contract let that day: FDOT letting of July 30, 2025. Compiled by Mirage Metrics.