Sice Inc: FDOT bid record

Sice Inc submitted 54 bids on Florida DOT contracts in the data, from 31 JAN 2018 to 26 AUG 2026, and was the low bidder on 9 of them (17%). When it was not low, its total sat a median +11% above the low bid.

Owner
Florida DOT
Low bid volume
$43,618,980
Latest bid
26 AUG 2026
Data through
28 OCT 2026
54Bids
9Low bids
17Win rate, percent
+11%Median gap to the low bid when not low, 45 bids

By year

YearBidsLow bidsWin rate
2018500%
2019500%
20206233%
20219222%
2022300%
2023600%
20243133%
20258225%
20269222%
Sice Inc, FDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
District 418422%
District 214214%
District 513323%
District 6500%
StateWide200%
District 1100%
District 7100%
Sice Inc, FDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Pull & splice box, F&I, 13" X 24" cover size0635-2-11EACH6218 (29%)$1,290.93$1,150.00
Managed field ethernet switch, furnish & install0684-1-1EACH3017 (57%)$2,705.08$4,489.00
Conduit, furnish & install, open trench0630-2-11LF4916 (33%)$11.15$16.54
Fiber optic connection hardware, F&I, splice0633-3-11EACH2113 (62%)$750.00$1,115.00
Electrical power service, F&I, underground, meter by contractor0639-1122AS3512 (34%)$4,323.60$4,500.00
Fiber optic connection hardware, F&I, patch panel- terminated0633-3-16EACH2112 (57%)$1,163.06$1,650.00
Work zone sign0102-60ED4811 (23%)$0.27$0.25
Pull & splice box, F&I, 24" X 36" cover size0635-2-12EACH3211 (34%)$2,419.64$2,231.27
Fiber optic connection hardware, F&I, splice tray0633-3-12EACH2111 (52%)$55.56$67.00
Channelizing device- types I, II, VP, drum, or LCD0102-74-1ED4810 (21%)$0.15$0.13
Fiber optic connection, install, splice0633-2-31EACH2510 (40%)$41.73$52.75
Fiber optic cable, F&I, underground,2-12 fibers0633-1121LF2410 (42%)$2.94$4.00
Sice Inc, FDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Sice Inc, FDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
26 AUG 2026T4757District 4SR 93 (I-75) FROM SR 869 (I-595) TO SR 25 (US 27)4 of 12$6,581,603+8.0%
26 AUG 2026T4773District 4SR 713 TURNPIKE FEEDER RD / KINGS HWY) FROM N OF INDRIO RD TO US 18 of 13$3,200,756+23%
29 JUL 2026T4745District 4SR 882 FOREST HILL BLVD) FROM E OF LAKE CLARKE DR TO US1 (DIXIE HWY)5 of 6$5,889,874+11%
29 JUL 2026T6625District 6SR 968 (W FLAGLER ST) FROM E OF SW 48 CT TO W OF SW 48 AVE7 of 7$675,646+14%
20 MAY 2026T4737District 4SR 9 (I-95) AND SR 862 (I-595) AT VARIOUS LOCATIONS AS...3 of 7$3,103,188+9.0%
25 MAR 2026T4734District 4SR A1A, SR 816, SR 845, SR 810 AND SR 870 AT VARIOUS...1 of 7$1,689,793Low, 0.0% under the second
25 MAR 2026T4735District 4SR 5, SR 805, SR 9, SR A1A AND SR 786 AT VARIOUS LOCATIONS..1 of 6$3,484,511Low, 2.0% under the second
25 MAR 2026T6589District 6SR 90 (US 41/SW 7TH ST) FROM E OF SW 27 AVE TO BRICKELL AVE5 of 6$14,208,516+25%
28 JAN 2026T4750District 4SR 5 (US 1) FROM MIDWAY RD TO S OF EDWARDS RD4 of 11$1,984,923+7.0%
03 DEC 2025T4717District 4SR 736 (DAVIE BLVD) FROM SR 9 (I-95) TO SR 5 (US 1)3 of 8$2,366,463+5.0%
03 DEC 2025T6620District 6SR A1A (COLLINS AVE) FROM S OF SR 826 TO N OF 178 ST5 of 5$1,889,810+31%
29 OCT 2025T4743District 4SR 805 (US 1/N DIXIE HWY) FROM N OF LUCERNE AVE TO WPB CANAL1 of 10$2,487,603Low, 4.0% under the second
30 JUL 2025T6599District 6SR 934 (NW 79 ST) FROM NW 27 AVE TO NW 1 PL6 of 6$7,053,277+21%
30 JUL 2025T7574District 7SR 93 (I-75), 93A (I-275) and SR 400 (I-4) FROM MANATEE/PI..2 of 6$4,701,504+8.0%
11 JUN 2025T5856District 5HIGH BRIDGE AND MAIN STREET BRIDGE FROM EB DRAWBRIDGE SIG...4 of 5$740,995+35%
26 FEB 2025T6588District 6SR 7 (US 441/NW 8 AVE/NW 7 AVE) AND SR 993 (NW 12 AVE) FROM.6 of 6$3,199,610+65%
29 JAN 2025T5845District 5SR 9/400 (I-95 / I-4) AT SR 400 (I-4 / US 92) INTERCHANGES1 of 5$2,046,788Low, 7.0% under the second
28 AUG 2024T2992District 2SR 9 AND SR 9A (I-295) AT VARIOUS LOCATIONS AS SHOWN IN ...3 of 3$3,199,126+35%
12 JUN 2024T4692District 4SR 870 (COMMERCIAL BLVD) FROM SR 845 (POWERLINE RD) TO SR...1 of 3$25,712,321Low, 15% under the second
31 JAN 2024T4654District 4SR 9 (I-95), SR 93 (I-75) AND SR 862 (I-595) AT VARIOUS ..2 of 5$5,689,299+1.0%
06 DEC 2023T4658District 4SR 842, SR 845, SR 811, SR A1A AND SR 8104 of 6$685,375+9.0%
15 NOV 2023T5807District 5SR 400 (I-4) FROM ADVENTURE WAY TO WB REST AREA2 of 3$5,955,505+11%
25 OCT 2023T9030StateWideSR 9 (I-95) AT FLAGLER WEIGH STATION3 of 5$5,966,058+7.0%
27 SEP 2023T4647District 4SR 817 (UNIVERSITY DR) AT 28 SEPARATE INTERSECTIONS4 of 4$645,885+16%
13 SEP 2023T5794District 5SR 423 (JOHN YOUNG PKWY) FROM SR 408 TO SHADER RD3 of 4$896,150+27%
Sice Inc: latest FDOT bids in the data

How this record was read

FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.

  • Every bid counted here matched its published total to within one dollar; FDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy