FDOT contract T4735 bid tabulation

SR 5, SR 805, SR 9, SR A1A AND SR 786 AT VARIOUS LOCATIONS.. Let by Florida DOT on March 25, 2026, Palm Beach, District 4. 6 bids received; low bid $3,484,511 by Sice Inc.

Owner
Florida DOT
Letting
25 MAR 2026
Pay items
113
Data through
28 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Sice Inc$3,484,511Low
2Signal Technology and Installation Corp.$3,552,812+2.0%
3Horsepower Electric, Inc.$3,869,869+11%
4Carr Construction, LLC$3,887,952+12%
5American Lighting and Signalization, LLC.$3,901,531+12%
6Aum Construction Inc.$3,971,000+14%
FDOT contract T4735: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Sice Inc2. Signal Technology and Installation Corp.3. Horsepower Electric, Inc.4. Carr Construction, LLC5. American Lighting and Signalization, LLC.6. Aum Construction Inc.
0005Mobilization (0101-1)LS1$374,498$177,161$250,000$212,629$375,000$500,000
0010Maintenance of traffic (0102-1)DA1$97,656$50,022$250,000$104,100$48,000$250,000
0015Traffic control officer (0102-14)HR144$112.11$95.48$100.00$100.00$100.00$80.00
0020Work zone sign (0102-60)ED3,844$0.25$0.31$0.25$0.30$0.26$0.50
0025Channelizing device- types I, II, VP, drum, or LCD (0102-74-1)ED15,762$0.15$0.18$0.15$0.10$0.12$0.20
0030Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8)FD17,770$0.06$0.07$0.05$0.10$0.09$0.15
0035Arrow board / advance warning arrow panel (0102-76)ED8,784$6.23$6.19$5.00$5.40$5.00$5.50
0040Portable changeable message sign, temporary (0102-99)ED5,160$12.46$12.37$10.00$11.50$11.00$11.00
0045Temporary signalization and maintenance, intersection (0102-104)ED1,952$33.13$21.44$50.00$8.00$12.00$15.00
0050Temporary traffic detection and maintenance, intersection (0102-107-1)ED1,952$24.79$21.44$50.00$8.00$17.00$15.00
0055Type III barricade (0102-115)ED488$0.37$0.39$0.30$0.40$0.35$1.00
0060Inlet protection system (0104-18)EACH17$249.12$179.68$100.00$517.00$207.00$250.00
0065Monitor existing structures- inspection and settlement monitoring (0108-1)LS1$6,228.07$27,484$10,000$9,673.00$17,715$6,000.00
0070Clearing & grubbing (0110-1-1)ACRE1$10,762$11,681$46,859$13,450$59,050$9,232.00
0075Removal of existing concrete (0110-4-10)SY586$66.18$38.48$38.00$111.00$236.00$50.00
0080Tree protection barrier (0110-21)LF109$12.46$8.79$15.00$36.25$59.00$25.00
0085Tree root and branch pruning (0110-22)EACH1$27.55$643.15$500.00$1,797.00$7,086.00$3,000.00
0090Borrow excavation, truck measure (0120-2-2)CY19.10$216.65$68.72$68.00$253.00$295.00$200.00
0095Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6)SY1,918$7.14$7.56$7.50$18.25$41.00$20.00
0100Asphalt concrete friction course,traffic C, FC-12.5, PG (0337-7-83)TN158.30$342.87$377.92$370.00$1,203.00$1,063.00$550.00
0105Manhole, adjust, utilities (0425-5-1)EACH2$1,304.66$2,473.60$2,430.00$1,660.00$4,252.00$2,000.00
0110Valve boxes, adjust (0425-6)EACH2$1,345.13$1,374.23$1,350.00$415.00$2,952.00$1,500.00
0115Meter boxes, adjust (0425-6-1)EACH1$1,345.13$1,374.22$1,350.00$415.00$1,771.00$1,486.60
0120Concrete curb & gutter, type F (0520-1-10)LF464$86.61$79.71$79.00$48.25$94.00$65.00
0125Concrete sidewalk and driveways, 4" thick (0522-1)SY293$129.47$134.68$133.00$82.00$295.00$120.00
0130Concrete sidewalk and driveways, 6" thick (0522-2)SY281$148.08$164.91$162.00$97.00$413.00$150.00
0135Pavers, architectural, (0526-1-2)SY154$254.44$158.04$156.00$363.00$472.00$350.00
0140Detectable warnings (0527-2)SF191$44.14$48.10$48.00$67.00$77.00$50.00
0145Performance turf, sod (0570-1-2)SY166$27.27$5.85$15.00$20.00$30.00$30.00
0150Painted pavement markings, standard, white, solid, 6" (0710-11101)GM0.11$1,494.74$3,435.67$3,564.00$3,210.00$2,362.00$3,500.00
0155Painted pavement markings, standard, white, solid for interchange and urban island, (0710-11102)GM0.03$2,179.82$4,583.67$3,564.00$4,032.00$3,543.00$4,700.00
0160Painted pavement markings, standard, white, solid for crosswalk and roundabout, 12" (0710-11123)LF240$1.25$2.48$1.35$2.20$2.50$2.50
0165Painted pavement markings, standard, white, solid for diagonal or chevron, 18" (0710-11124)LF61$1.87$2.62$1.35$2.30$5.00$3.00
0170Painted pavement markings, standard, white, solid for stop line or crosswalk, 24" (0710-11125)LF235$2.49$2.75$2.70$2.40$6.00$3.00
0175Painted pavement markings, standard, white, 2-4 dotted guideline/ 6-10 dotted 6" (0710-11141)GM0.09$1,058.77$1,030.82$3,564.00$949.00$1,181.00$5,000.00
0180Painted pavement markings, standard, white, arrows (0710-11170)EACH4$93.42$54.98$48.00$48.25$59.00$60.00
0185Painted pavement markings, standard, yellow, solid, 6" (0710-11201)GM0.05$1,494.74$3,435.85$3,564.00$3,422.00$2,362.00$4,000.00
0190Partnering, DO not bid (0999-16)LS1$6,000.00$6,000.00$6,000.00$6,000.00$6,000.00$6,000.00
0195Initial contingency amount, DO not bid (0999-25)LS1$50,000$50,000$50,000$50,000$50,000$50,000
0200Local agency initial amount (DO not bid) (0999-26)LS1$15,614$15,614$15,614$15,614$15,614$15,614
0205Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111)EACH1$906.40$1,217.12$750.00$907.00$886.00$1,000.00
0210Single column ground sign assembly, remove (0700-1600)EACH2$717.47$142.93$100.00$91.00$118.00$200.00
0215Sign panel, furnish & install overhead mount, UP to 12 SF (0700-3201)EACH7$677.22$1,061.96$750.00$1,045.00$1,195.00$1,500.00
0220Enhanced highway sign AC powered, F&I overhead blank out sign <12 SF (0700-141360)EACH1$6,566.25$9,234.06$12,500$11,883$6,118.00$15,000
0225Raised pavement marker, type B (0706-1-3)EACH54$4.98$6.88$7.00$6.10$8.00$10.00
0230Painted pavement markings, surface (0710-90)LS1$3,550.00$3,570.23$2,565.00$6,046.00$59,050$3,900.00
0235Thermoplastic, standard, solid, 8" for interchange and urban island (0711-11102)GM0.03$6,352.63$15,450$11,404$13,596$11,810$17,000
0240Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123)LF240$2.80$4.33$3.25$3.80$6.00$4.75
0245Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124)LF61$4.15$6.53$5.00$5.70$8.00$7.00
0250Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125)LF235$5.29$8.66$6.50$7.60$12.00$9.50
0255Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141)GM0.09$2,615.79$4,366.17$8,555.00$4,020.00$4,133.00$4,750.00
0260Thermoplastic, preformed, white, arrow (0711-14170)EACH4$560.53$350.43$675.00$308.00$207.00$400.00
0265Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101)GM0.11$5,667.54$11,586$8,555.00$10,679$8,857.00$13,000
0270Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201)GM0.05$5,667.54$10,646$8,555.00$10,604$8,857.00$12,000
0275Green-colored pavement markings, bike lane (0714-10)SF328$26.78$22.42$13.50$19.75$12.00$24.00
0280Conduit, furnish & install, directional bore (0630-2-12)LF166$69.51$41.23$40.00$38.50$41.00$35.00
0285Pull & splice box, F&I, 13" X 24" cover size (0635-2-11)EACH4$1,743.86$1,687.41$2,000.00$1,796.00$1,024.00$2,000.00
0290Lighting conductors, F&I, insulated, no.8 - 6 (0715-1-12)LF1,770$6.83$3.59$3.00$3.00$2.00$3.50
0295Lighting conductors, remove & dispose, contractor owns (0715-1-60)LF330$3.74$1.43$0.10$0.30$0.35$1.00
0300Luminaire & bracket arm- galv steel, furnish & install new luminaire and arm on new/existing pole (0715-5-32)EACH2$1,683.76$1,637.73$3,500.00$1,882.00$3,142.00$2,000.00
0305Pole cable distribution system, furnish and install, conventional (0715-500-1)EACH5$1,217.28$851.95$1,000.00$1,159.00$591.00$800.00
0310Conduit, furnish & install, directional bore (0630-2-12)LF5,005$46.87$48.93$30.00$53.00$41.00$50.00
0315Signal cable- new or reconstructed intersection, furnish & install (0632-7-1)PI8$12,578$13,867$15,000$20,943$8,552.00$15,000
0320Signal cable, remove- intersection (0632-7-6)PI8$2,152.42$2,143.79$1,500.00$1,245.00$1,440.00$550.00
0325Fiber optic cable locator (0633-6)DA244$134.53$157.22$50.00$104.00$266.00$150.00
0330Multi-conductor cable, furnish & install, cat 6 (0633-8-11)LF485$12.89$3.27$8.00$2.90$4.00$10.00
0335Pull & splice box, F&I, 17" X 30" cover size (0635-2-14)EACH136$1,409.79$2,006.78$2,300.00$2,216.00$1,953.00$2,500.00
0340Pull & splice box, F&I, 30" X 48" cover size (0635-2-15)EACH1$5,605.26$2,932.25$5,000.00$4,600.00$4,746.00$5,000.00
0345Electrical power service, F&I, underground, meter by contractor (0639-1122)AS8$4,618.11$5,864.48$10,000$5,581.00$4,523.00$7,500.00
0350Electrical power service, F&I, underground, meter not required (0639-1123)AS2$4,618.11$5,864.48$10,000$3,598.00$4,202.00$7,000.00
0355Electrical service wire, & install (0639-2-1)LF2,421$14.42$5.85$20.00$9.80$5.00$10.00
0360Electrical service wire, (0639-2-6)LF2,135$2.49$1.43$1.00$1.70$0.70$1.00
0365Electrical service disconnect, remove- pole or cabinet to remain (0639-3-60)EACH4$358.74$1,143.36$500.00$207.00$151.00$550.00
0370Prestressed concrete pole, type P-II service pole (0641-2-12)EACH8$3,112.14$3,407.28$3,500.00$2,378.00$2,124.00$3,000.00
0375Prestressed concrete pole, complete pole removal- pedestal/service pole (0641-2-60)EACH3$1,076.21$2,858.38$750.00$622.00$414.00$750.00
0380Strain pole, wood, remove (0643-600)EACH2$1,076.21$4,287.57$500.00$416.00$829.00$2,000.00
0385Aluminum signals pole, (0646-1-11)EACH16$1,968.70$4,576.52$3,500.00$3,320.00$2,793.00$2,500.00
0390Aluminum signals pole, remove (0646-1-60)EACH12$717.47$857.52$500.00$415.00$332.00$550.00
0395Steel mast arm assembly, and install, single arm 40' (0649-21-3)EACH2$75,436$65,646$70,000$73,293$67,000$68,000
0400Steel mast arm assembly, and install, single arm 40' (0649-21-3)EACH1$71,352$65,646$70,000$73,293$67,000$7,300.00
0405Steel mast arm assembly, and install, single arm 50' (0649-21-6)EACH1$80,886$77,069$80,000$84,246$77,000$74,500
0410Steel mast arm assembly, and install, single arm 50' (0649-21-6)EACH2$85,824$73,716$80,000$84,246$74,000$81,000
0415Steel mast arm assembly, and install, single arm 60' (0649-21-10)EACH1$92,683$85,240$90,000$101,200$81,000$88,000
0420Steel mast arm assembly, and install, double arm 60'-50' (0649-21-13)EACH1$120,405$111,938$120,000$135,700$112,000$113,000
0425Steel mast arm assembly, and install, single arm 70' (0649-21-15)EACH1$103,875$90,026$100,000$108,300$86,000$94,000
0430Steel mast arm assembly, and install, double arm 70'-60' (0649-21-19)EACH1$131,459$116,136$125,000$153,900$112,000$137,000
0435Steel mast arm assembly, and install on existing foundation, single arm 40' (0649-22-3)EACH1$33,136$47,118$44,000$48,409$38,500$4,000.00
0440Steel mast arm assembly, and install on existing foundation, single arm 50' (0649-22-6)EACH1$37,095$53,096$45,000$59,361$44,500$49,000
0445Steel mast arm assembly, and install on existing foundation, double arm 70'-60' (0649-22-19)EACH1$71,595$97,701$81,000$121,100$90,000$87,500
0450Steel mast arm assembly, and install on existing foundation, double arm 70'-70' (0649-22-20)EACH1$68,164$100,619$78,000$107,800$94,000$82,600
0455Steel mast arm assembly, remove, pole only- entire foundation remains (0649-26-1)EACH4$4,304.84$6,128.36$3,500.00$1,365.00$3,200.00$3,000.00
0460Steel mast arm assembly, remove, shallow foundation- bolt on attachment (0649-26-3)EACH10$5,550.46$7,660.45$3,500.00$4,684.00$6,000.00$4,000.00
0465Vehicular traffic signal, furnish & install aluminum, 3 section, 1 way (0650-1-14)AS19$1,672.04$1,965.92$2,500.00$2,243.00$1,392.00$2,000.00
0470Vehicular traffic signal, furnish & install aluminum, 5 section cluster, 1 way (0650-1-19)AS4$2,438.69$3,097.25$3,500.00$3,514.00$2,269.00$3,500.00
0475Vehicular traffic signal, furnish & install 3 section, 1 way (0650-1-34)AS19$1,499.83$1,776.24$2,500.00$2,243.00$1,310.00$2,000.00
0480Vehicular traffic signal, furnish & install 4 section, 1 way (0650-1-36)AS2$1,682.99$2,120.62$2,750.00$2,759.00$1,601.00$2,500.00
0485Vehicular traffic signal, furnish & install 5 section straight, 1 way (0650-1-38)AS3$1,873.58$2,473.79$3,000.00$3,514.00$1,844.00$2,800.00
0490Pedestrian signal, furnish & install LED countdown, 1 way (0653-1-11)AS12$1,112.55$1,062.51$1,000.00$1,166.00$799.00$2,000.00
0495Pedestrian signal, furnish & install LED countdown, 2 ways (0653-1-12)AS4$1,315.13$1,908.29$2,000.00$2,407.00$1,688.00$2,500.00
0500Loop assembly, F&I, type F (0660-2106)AS10$3,114.04$4,809.77$2,500.00$1,825.00$1,990.00$2,500.00
0505Vehicle detection system- furnish & install cabinet equipment (0660-4-11)EACH3$11,027$34,636$15,000$18,187$8,827.00$12,000
0510Vehicle detection system- furnish & install above ground equipment (0660-4-12)EACH3$3,914.88$13,070$7,500.00$21,508$21,361$5,000.00
0515Vehicle detection system- relocate above ground equipment (0660-4-42)EACH9$717.47$3,944.70$5,000.00$1,491.00$3,076.00$1,500.00
0520Vehicle detection system- remove (0660-4-60)EACH3$717.47$1,000.44$100.00$207.00$720.00$250.00
0525Pedestrian detector, furnish & install, standard (0665-1-11)EACH21$351.11$510.82$500.00$372.00$294.00$450.00
0530Pedestrian detector, remove- pole/pedestal to remain (0665-1-60)EACH1$269.05$142.94$50.00$26.00$226.00$100.00
0535Traffic controller assembly, F&I, NEMA W/standard lock, 1 preemption (0670-5161)AS1$48,039$52,092$65,000$72,021$45,432$60,000
0540Traffic controller assembly, relocate controller with cabinet (0670-5500)AS2$11,968$11,429$30,000$5,767.00$3,440.00$30,000
0545Traffic controller assembly, remove controller with (0670-5600)AS1$3,398.04$3,064.20$1,500.00$623.00$698.00$1,500.00
0550ITS CCTV camera, non- pressurized, IP, high definition (0682-1173)EACH2$8,414.43$6,453.34$10,000$7,013.00$8,134.00$7,000.00
0555Managed field ethernet switch, furnish & install (0684-1-1)EACH6$3,115.13$3,372.82$5,000.00$4,595.00$4,482.00$11,000
0560Remote power management rpmu, furnish and install (0685-2-1)EACH1$751.14$1,202.50$1,100.00$2,171.00$775.00$1,000.00
0565Internally illuminated sign, furnish & install, overhead mount, 12-18 SF (0700-5-22)EACH13$3,573.01$5,165.20$6,500.00$5,116.00$3,229.00$4,000.00
FDOT contract T4735: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.

Every contract let that day: FDOT letting of March 25, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy