FDOT letting results, December 6, 2023
22 contracts let by Florida DOT on December 6, 2023, $160,926,859 in low bids, a median of 4 bidders per contract.
- Owner
- Florida DOT
- Contracts
- 22
- Low bids, total
- $160,926,859
- Data through
- 28 OCT 2026
Contracts let that day
| Contract | Project | District | Bids | Low bidder | Low bid | Second bid | Gap | Source |
|---|---|---|---|---|---|---|---|---|
| T1869 | SR 93 (I-75), FROM S OF BONITA BEACH RD TO N OF ALICO RD | District 1 | 3 | Preferred Materials Inc. | $22,922,992 | $26,695,801 | +16% | FDOT |
| T7527 | SR 93A (I-75) FROM S OF PROGRESS BLVD TO N OF WOODBERRY RD | District 7 | 4 | Gosalia Concrete Constructors, Inc. | $22,643,400 | $24,918,133 | +10% | FDOT |
| T2960 | SR 8 (I-10), FROM NASSAU CO LINE TO SR 23 (FIRST COAST ... | District 2 | 2 | Hubbard Construction Company | $18,979,748 | $20,021,814 | +5.0% | FDOT |
| T2951 | SR10 (ATLANTIC BLVD), FROM KERNAN OVERPASS TO MAYPORT RD | District 2 | 3 | Preferred Materials Inc. | $14,919,688 | $17,655,878 | +18% | FDOT |
| T1887 | SR 865 (SAN CARLOS BLVD), FROM N OF CRESCENT ST TO N OF... | District 1 | 4 | Wright Construction Group, Inc. | $13,177,472 | $15,218,429 | +15% | FDOT |
| T4663 | SR 60 FROM W OF CR 512 TO W OF 94TH DR | District 4 | 2 | Ranger Construction Industries, Inc. | $11,192,757 | $11,198,728 | 0.0% | FDOT |
| T4657 | SR-A1A FROM S OF GRAND CT TO S OF LINTON BLVD | District 4 | 6 | The Stout Group LLC | $8,333,362 | $10,339,828 | +24% | FDOT |
| T6573 | SR 976 (SW 40 ST/BIRD RD) FROM E OF SW 87 AVE TO W OF SR 826 | District 6 | 9 | General Asphalt Company, LLC | $7,944,520 | $8,050,305 | +1.0% | FDOT |
| T3866 | SR 261 (US 319/CAPITAL CIRCLE), FROM SR 363 (WOODVILLE HWY) | District 3 | 5 | Peavy & Son Construction Co., Inc. | $7,020,914 | $7,744,865 | +10% | FDOT |
| T2945 | SR 109 (UNIVERSITY BLVD), FROM CRUZ RD TO WATEREDGE LN | District 2 | 3 | Watson Civil Construction, Inc. | $6,853,255 | $7,437,648 | +9.0% | FDOT |
| T3876 | SR 10 (US 90) FROM WALTON CO LINE TO E OF CSX RAILROAD | District 3 | 3 | Anderson Columbia Co., Inc. | $5,789,402 | $5,915,610 | +2.0% | FDOT |
| T2954 | SR 212 (US 90), FROM 12TH ST TO SR A1A | District 2 | 4 | Watson Civil Construction, Inc. | $3,819,110 | $4,679,035 | +23% | FDOT |
| T2961 | CLET HARVEY RD, OVER MUD LAKE SWAMP, BRIDGE NO 274091 | District 2 | 2 | Leware Construction Company of Florida, Inc. | $3,521,000 | $4,192,910 | +19% | FDOT |
| T2953 | DENNIS HOWELL RD, OVER WARRIOR CREEK, BRIDGE NO. 384029 | District 2 | 1 | Anderson Columbia Co., Inc. | $3,145,365 | FDOT | ||
| T4662 | NORTH SHORE DR FROM S OF CARVER CANAL TO N OF CARVER CANAL | District 4 | 4 | Ferreira Construction Co., Inc. | $2,710,165 | $2,970,919 | +10% | FDOT |
| T6564 | SR 913 (SW/SE 26 RD) FROM SW 1 AVE TO RICKENBACKER CAUSEWAY | District 6 | 5 | Jva Engineering Contractor, Inc | $2,427,793 | $2,494,642 | +3.0% | FDOT |
| T3897 | SR 10/SR 12 (US 90) (JEFFERSON ST) FROM CHALK ST TO RALPH... | District 3 | 6 | Graybelle Construction | $1,349,500 | $1,549,484 | +15% | FDOT |
| T1884 | SR 17, AT HILLCREST AVE | District 1 | 4 | American Design Engineering Construction Inc. | $1,190,968 | $1,292,522 | +9.0% | FDOT |
| T7518 | SR 45, SR 55, SR 597, SR 54 AND SR 56 AT VARIOUS L O C A T I O N S | District 7 | 2 | Akca, LLC | $908,274 | $1,052,394 | +16% | FDOT |
| T5821 | SR 35, SR 25, SR 45, SR 500, SR 19 AND SR 200 | District 5 | 6 | TRP Construction Group, LLC | $843,345 | $864,253 | +2.0% | FDOT |
| T4658 | SR 842, SR 845, SR 811, SR A1A AND SR 810 | District 4 | 6 | Arc Electric Inc | $626,262 | $649,649 | +4.0% | FDOT |
| T5820 | SR A1A, SR 5, SR 44, SR 11, SR 415 AND SR 5A | District 5 | 6 | TRP Construction Group, LLC | $607,569 | $628,263 | +3.0% | FDOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than FDOT received, the others did not match their published totals and are left out.