The Stout Group LLC: FDOT bid record
The Stout Group LLC submitted 99 bids on Florida DOT contracts in the data, from 31 JAN 2018 to 28 OCT 2026, and was the low bidder on 9 of them (9%). When it was not low, its total sat a median +15% above the low bid.
- Owner
- Florida DOT
- Low bid volume
- $27,524,908
- Latest bid
- 28 OCT 2026
- Data through
- 28 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2018 | 3 | 0 | 0% |
| 2019 | 11 | 1 | 9% |
| 2020 | 10 | 1 | 10% |
| 2021 | 17 | 2 | 12% |
| 2022 | 4 | 0 | 0% |
| 2023 | 11 | 2 | 18% |
| 2024 | 13 | 1 | 8% |
| 2025 | 16 | 2 | 13% |
| 2026 | 14 | 0 | 0% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| District 4 | 52 | 8 | 15% |
| District 6 | 41 | 1 | 2% |
| District 1 | 6 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Work zone sign | 0102-60 | ED | 94 | 40 (43%) | $0.22 | $0.25 |
| Removal of existing concrete | 0110-4-10 | SY | 84 | 33 (39%) | $20.00 | $33.96 |
| Arrow board / advance warning arrow panel | 0102-76 | ED | 78 | 33 (42%) | $5.05 | $5.90 |
| Portable changeable message sign, temporary | 0102-99 | ED | 92 | 32 (35%) | $10.00 | $12.00 |
| Pull & splice box, F&I, 13" X 24" cover size | 0635-2-11 | EACH | 157 | 31 (20%) | $1,384.00 | $1,150.00 |
| Channelizing device- types I, II, VP, drum, or LCD | 0102-74-1 | ED | 96 | 26 (27%) | $0.12 | $0.13 |
| Raised pavement marker, type B | 0706-1-3 | EACH | 88 | 26 (30%) | $5.00 | $5.00 |
| Channelizing device- pedestrian LCD (longitudinal channelizing device) | 0102-74-8 | FD | 68 | 25 (37%) | $0.06 | $0.07 |
| Conduit, furnish & install, directional bore | 0630-2-12 | LF | 135 | 24 (18%) | $34.30 | $30.82 |
| Thermoplastic, preformed, white, solid, 24" for crosswalk | 0711-14125 | LF | 74 | 23 (31%) | $17.55 | $17.00 |
| Thermoplastic, standard, arrow | 0711-11170 | EACH | 82 | 21 (26%) | $78.00 | $80.00 |
| Manhole, adjust | 0425-5 | EACH | 63 | 21 (33%) | $750.00 | $1,055.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| General Asphalt Company, LLC | 64 | 49 of 64 |
| Weekley Asphalt Paving, Inc. | 57 | 31 of 57 |
| Ranger Construction Industries, Inc. | 41 | 14 of 41 |
| Florida Engineering & Development Corp | 41 | 20 of 41 |
| Roadway Construction, LLC | 35 | 18 of 35 |
| Ohla USA Inc | 28 | 15 of 28 |
| Zahlene Enterprises Inc. | 25 | 13 of 25 |
| Horizon Contractors, Inc. | 24 | 14 of 24 |
| Jva Engineering Contractor, Inc | 22 | 10 of 22 |
| Halley Engineering Contractors, Inc. | 20 | 9 of 20 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 28 OCT 2026 | T4765 | District 4 | SR 816 (OAKLAND PARK BLVD) FROM ROCK ISLAND RD TO E OF NW 31 AVE | 4 of 6 | $8,432,226 | +11% |
| 30 SEP 2026 | T6593 | District 6 | SR 5 (US 1 / OVERSEAS HWY) FROM W OF VENETIAN BLVD TO EXECUTIVE BAY | 4 of 5 | $3,768,908 | +27% |
| 30 SEP 2026 | T6613 | District 6 | SR 860 (MIAMI GARDENS DR) AT NW 37TH AVE AND FROM NE 6TH AVE TO W | 7 of 9 | $2,053,425 | +21% |
| 29 JUL 2026 | T4745 | District 4 | SR 882 FOREST HILL BLVD) FROM E OF LAKE CLARKE DR TO US1 (DIXIE HWY) | 2 of 6 | $5,422,489 | +2.0% |
| 29 JUL 2026 | T6595 | District 6 | SR 985 (SW 107 AVE) FROM SR 94 (SW 88 ST) TO N OF SW 56 ST | 7 of 12 | $4,678,875 | +7.0% |
| 10 JUN 2026 | T1930 | District 1 | SR 25/SR 80 (US 27) FROM INDUSTRIAL CANAL TO W SAGAMORE AVE | 3 of 5 | $5,022,135 | +5.0% |
| 10 JUN 2026 | T4766 | District 4 | SR 84 (SE 24TH ST) FROM SW 4TH AVE TO SR 5 (US 1) | 2 of 8 | $1,271,127 | +1.0% |
| 20 MAY 2026 | T1933 | District 1 | SR 25 (US 27) FROM MP 4.478 TO MP 4.856 | 6 of 6 | $9,388,018 | +74% |
| 29 APR 2026 | T4723 | District 4 | SR 5 (US 1) FROM PALMETTO PARK RD TO SR 850 (NORTHLAKE BLVD) | 2 of 4 | $2,493,437 | +10% |
| 25 MAR 2026 | T4740 | District 4 | SR 5 (US 1) FROM CAMINO REAL TO NE 8TH ST (MIZNER BLVD) | 4 of 9 | $6,749,702 | +6.0% |
| 25 MAR 2026 | T6591 | District 6 | SR 25 (US 27 OKEECHOBEE RD) AND SR 9 (NW 27 AVE) FROM... | 5 of 7 | $6,798,593 | +8.0% |
| 25 FEB 2026 | T4751 | District 4 | SR 704 (OKEECHOBEE BLVD) FROM E OF SR 809 (MILITARY TR) TO.. | 3 of 4 | $2,383,298 | +2.0% |
| 25 FEB 2026 | T6619 | District 6 | SR 969 (NW 72 AVE) AND SR 826 AT SR 948 (NW 36 ST) AT SR... | 3 of 6 | $1,789,318 | +9.0% |
| 28 JAN 2026 | T6618 | District 6 | SR 934 (71ST ST) FROM BAY DR E TO COLLINS AVE | 5 of 5 | $2,788,261 | +27% |
| 03 DEC 2025 | T6615 | District 6 | SR 5 (US 1 / BISCAYNE BLVD) FROM S OF NE 38TH ST TO NE 61... | 6 of 8 | $7,358,335 | +17% |
| 29 OCT 2025 | T4727 | District 4 | SR A1A (NE OCEAN BLVD) FROM NE SHORE VILLAGE TER TO SR 732 ( | 7 of 13 | $6,492,838 | +33% |
| 27 AUG 2025 | T4702 | District 4 | SR 7 (US 441) AT LAKE WORTH RD | 1 of 8 | $3,408,647 | Low, 0.0% under the second |
| 27 AUG 2025 | T4715 | District 4 | SR 817 (UNIVERSITY DR) FROM NOVA DR TO SR 84 | 3 of 9 | $7,481,823 | +9.0% |
| 27 AUG 2025 | T4728 | District 4 | N 22ND AVE (SW 12TH AVE) FROM SHERIDAN ST TO STIRLING RD | 1 of 6 | $2,926,112 | Low, 7.0% under the second |
| 30 JUL 2025 | T4648 | District 4 | SR 84 AT WESTON ROAD | 4 of 5 | $3,746,849 | +17% |
| 30 JUL 2025 | T4716 | District 4 | SR 811 (ALT A1A) FROM S OF RCA BLVD TO N OF DONALD ROSS RD | 6 of 8 | $8,005,326 | +35% |
| 30 JUL 2025 | T4720 | District 4 | I-95 RAMP AT SR 704 (OKEECHOBEE BLVD), SR 786 (PGA BLVD) AND | 3 of 3 | $1,521,467 | +25% |
| 30 JUL 2025 | T4726 | District 4 | UTOPIA DR FROM RIVIERA BLVD TO SR 824 (PEMBROKE RD) | 4 of 6 | $1,685,689 | +20% |
| 30 JUL 2025 | T4733 | District 4 | SR 9 (I-95) NB EXIT RAMP TO WB SR 68 (ORANGE AVE) | 4 of 4 | $1,320,500 | +57% |
| 28 MAY 2025 | T4719 | District 4 | SR 15 (E MAIN ST) FROM ANNONA ST TO S OF SR 700 (CONNERS HWY | 6 of 6 | $4,676,051 | +36% |
How this record was read
FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
- Every bid counted here matched its published total to within one dollar; FDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.