| 0005 | Mobilization (0101-1) | LS | 1 | $116,000 | $347,515 | $144,000 |
| 0010 | Maintenance of traffic (0102-1) | DA | 1 | $216,000 | $79,249 | $350,000 |
| 0015 | Traffic control officer (0102-14) | HR | 260 | $94.80 | $115.00 | $95.00 |
| 0020 | Work zone sign (0102-60) | ED | 2,820 | $0.30 | $0.30 | $0.24 |
| 0025 | Channelizing device- types I, II, VP, drum, or LCD (0102-74-1) | ED | 20,688 | $0.15 | $0.10 | $0.12 |
| 0030 | Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8) | FD | 4,500 | $0.10 | $0.20 | $0.08 |
| 0035 | Arrow board / advance warning arrow panel (0102-76) | ED | 168 | $6.65 | $5.70 | $5.65 |
| 0040 | Portable changeable message sign, temporary (0102-99) | ED | 488 | $14.05 | $12.50 | $11.95 |
| 0045 | Temporary signalization and maintenance, intersection (0102-104) | ED | 472 | $17.65 | $11.25 | $8.58 |
| 0050 | Type III barricade (0102-115) | ED | 376 | $0.90 | $0.30 | $0.75 |
| 0055 | Sediment barrier (0104-10-3) | LF | 5,841 | $4.45 | $4.70 | $8.00 |
| 0060 | Inlet protection system (0104-18) | EACH | 18 | $235.30 | $450.00 | $200.00 |
| 0065 | Litter removal (0107-1) | ACRE | 141.69 | $94.10 | $106.00 | $1.00 |
| 0070 | Mowing (0107-2) | ACRE | 111.28 | $105.90 | $213.00 | $1.00 |
| 0075 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $5,660.00 | $8,079.00 | $100,000 |
| 0080 | Tree protection barrier (0110-21) | LF | 44 | $28.65 | $4.20 | $20.00 |
| 0085 | Embankment (0120-6) | CY | 5 | $720.50 | $466.00 | $250.00 |
| 0090 | Milling existing asphalt pavement, 2" avg depth (0327-70-5) | SY | 3,613 | $7.60 | $9.50 | $5.00 |
| 0095 | Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6) | SY | 6,453 | $3.55 | $4.40 | $4.00 |
| 0100 | Asphalt concrete friction course,traffic C, FC-12.5, PG (0337-7-83) | TN | 929.80 | $188.70 | $236.00 | $250.00 |
| 0105 | Miscellaneous asphalt (0339-1) | TN | 19.90 | $705.00 | $516.00 | $300.00 |
| 0110 | Guardrail -roadway, general (0536-1-1) | LF | 213 | $32.00 | $31.25 | $26.96 |
| 0115 | Guardrail removal (0536-73) | LF | 251 | $1.80 | $1.80 | $2.00 |
| 0120 | Guardrail end treatment- trailing anchorage (0536-85-20) | EACH | 1 | $1,860.00 | $1,812.00 | $1,802.17 |
| 0125 | Guardrail end treatment- parallel approach terminal (0536-85-24) | EACH | 1 | $3,780.00 | $3,688.00 | $4,237.69 |
| 0130 | Performance turf, sod (0570-1-2) | SY | 604 | $30.00 | $5.80 | $25.00 |
| 0140 | Painted pavement markings, standard, white, solid, 6" (0710-11101) | GM | 0.87 | $1,840.00 | $1,791.00 | $2,200.00 |
| 0145 | Painted pavement markings, standard, white, solid for interchange and urban island, (0710-11102) | GM | 0.11 | $2,780.00 | $2,978.00 | $2,500.00 |
| 0150 | Painted pavement markings, standard, white, solid for crosswalk and roundabout, 12" (0710-11123) | LF | 68 | $1.40 | $1.40 | $3.00 |
| 0155 | Painted pavement markings, standard, white, solid for diagonal or chevron, 18" (0710-11124) | LF | 16 | $2.45 | $2.40 | $4.00 |
| 0160 | Painted pavement markings, standard, white, solid for stop line or crosswalk, 24" (0710-11125) | LF | 14 | $2.55 | $2.50 | $5.00 |
| 0165 | Painted pavement markings, standard, white, arrows (0710-11170) | EACH | 6 | $47.05 | $46.00 | $50.00 |
| 0170 | Painted pavement markings, standard, white, yield line (0710-11180) | LF | 8 | $8.25 | $8.00 | $25.00 |
| 0175 | Painted pavement markings, standard, yellow, solid, 6" (0710-11201) | GM | 0.82 | $1,820.00 | $1,800.00 | $2,200.00 |
| 0180 | High friction surface course (0908-333100) | SY | 10,066 | $26.80 | $28.75 | $25.00 |
| 0185 | Partnering, DO not bid (0999-16) | LS | 1 | $6,000.00 | $6,000.00 | $6,000.00 |
| 0190 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $50,000 | $50,000 | $50,000 |
| 0195 | Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112) | EACH | 1 | $588.00 | $574.00 | $2,624.00 |
| 0200 | Single column ground sign assembly, remove (0700-1600) | EACH | 2 | $88.20 | $86.00 | $332.00 |
| 0205 | Enhanced highway sign solar powered, F&I barrier side mount, W/eds and beacon, 12-20 of static sign panels (0700-142472) | EACH | 1 | $19,600 | $13,339 | $20,448 |
| 0210 | Raised pavement marker, type B (0706-1-3) | EACH | 343 | $4.70 | $4.60 | $8.00 |
| 0215 | Painted pavement markings, surface (0710-90) | LS | 1 | $8,240.00 | $8,030.00 | $10,000 |
| 0220 | Thermoplastic, standard, solid, 8" for interchange and urban island (0711-11102) | GM | 0.11 | $9,290.00 | $9,965.00 | $10,000 |
| 0225 | Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123) | LF | 68 | $4.55 | $4.50 | $8.00 |
| 0230 | Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124) | LF | 16 | $6.10 | $6.00 | $10.00 |
| 0235 | Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125) | LF | 15 | $8.25 | $8.00 | $12.00 |
| 0240 | Thermoplastic, standard, arrow (0711-11170) | EACH | 6 | $97.70 | $95.00 | $150.00 |
| 0245 | Thermoplastic, standard, yield line (0711-11180) | LF | 8 | $14.70 | $14.25 | $30.00 |
| 0250 | Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125) | LF | 48 | $18.95 | $18.50 | $30.00 |
| 0255 | Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101) | GM | 0.87 | $6,400.00 | $6,309.00 | $10,000 |
| 0260 | Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201) | GM | 0.82 | $6,350.00 | $6,267.00 | $10,000 |
| 0265 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 613 | $38.55 | $35.25 | $45.78 |
| 0270 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 5 | $2,800.00 | $1,278.00 | $1,730.62 |
| 0275 | Electrical power service, F&I, underground, meter by contractor (0639-1122) | AS | 1 | $6,410.00 | $4,029.00 | $4,593.77 |
| 0280 | Electrical service wire, & install (0639-2-1) | LF | 150 | $12.05 | $7.70 | $11.57 |
| 0285 | Electrical service disconnect, F&I, pole mount (0639-3-11) | EACH | 1 | $4,180.00 | $2,672.00 | $4,673.52 |
| 0290 | Prestressed concrete pole, type P-II service pole (0641-2-12) | EACH | 1 | $2,710.00 | $1,698.00 | $4,274.75 |
| 0295 | Lighting conductors, F&I, insulated, no.8 - 6 (0715-1-12) | LF | 2,061 | $2.70 | $1.60 | $3.86 |
| 0300 | Luminaire & bracket arm, luminaire and arm on existing pole (0715-5-21) | EACH | 4 | $3,470.00 | $2,140.00 | $2,928.97 |
| 0305 | Load center, rework, voltage (0715-7-21) | EACH | 1 | $2,520.00 | $1,707.00 | $4,458.11 |
| 0310 | Light pole complete, F&I, standard pole standard foundation, 35' mounting height, 15' arm length (0715-61252) | EACH | 1 | $12,300 | $7,583.00 | $11,806 |
| 0315 | Light pole complete, F&I, standard pole standard foundation, 45' mounting height, 15' arm length (0715-61452) | EACH | 2 | $14,200 | $8,670.00 | $13,225 |
| 0320 | Pole cable distribution system, furnish and install, conventional (0715-500-1) | EACH | 7 | $1,350.00 | $861.00 | $1,211.24 |
| 0325 | Fiber optic cable locator (0633-6) | DA | 118 | $43.55 | $67.00 | $275.40 |