FDOT contract T4716 bid tabulation
SR 811 (ALT A1A) FROM S OF RCA BLVD TO N OF DONALD ROSS RD. Let by Florida DOT on July 30, 2025, Palm Beach, District 4. 8 bids received; low bid $5,935,381 by General Asphalt Company, LLC.
- Owner
- Florida DOT
- Letting
- 30 JUL 2025
- Pay items
- 114
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | General Asphalt Company, LLC | $5,935,381 | Low |
| 2 | Ranger Construction Industries, Inc. | $6,023,042 | +1.0% |
| 3 | Ohla USA Inc | $6,502,951 | +10% |
| 4 | Halley Engineering Contractors, Inc. | $6,986,550 | +18% |
| 5 | Carr Construction, LLC | $7,234,716 | +22% |
| 6 | The Stout Group LLC | $8,005,326 | +35% |
| 7 | J.W. Cheatham, LLC | $8,007,677 | +35% |
| 8 | Florida Engineering & Development Corp | $8,735,232 | +47% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. General Asphalt Company, LLC | 2. Ranger Construction Industries, Inc. | 3. Ohla USA Inc | 4. Halley Engineering Contractors, Inc. | 5. Carr Construction, LLC | 6. The Stout Group LLC |
|---|---|---|---|---|---|---|---|---|---|
| 0005 | Mobilization (0101-1) | LS | 1 | $200,000 | $297,600 | $540,000 | $650,000 | $562,811 | $800,000 |
| 0010 | Maintenance of traffic (0102-1) | DA | 1 | $450,000 | $255,810 | $670,000 | $285,000 | $265,057 | $450,000 |
| 0015 | Pedestrian or bicycle special detour (0102-4-1) | SY | 1 | $27,500 | $44,515 | $46,000 | $20,000 | $32,708 | $30,000 |
| 0020 | Traffic control officer (0102-14) | HR | 448 | $88.00 | $89.90 | $0.01 | $90.00 | $108.00 | $125.00 |
| 0025 | Work zone sign (0102-60) | ED | 5,179 | $0.24 | $0.25 | $0.25 | $0.20 | $0.20 | $0.22 |
| 0030 | Temporary barrier, F&I, low profile, concrete (0102-71-13) | LF | 1,468 | $1.10 | $49.90 | $0.01 | $61.00 | $48.75 | $43.87 |
| 0035 | Channelizing device- types I, II, VP, drum, or LCD (0102-74-1) | ED | 72,150 | $0.12 | $0.12 | $0.13 | $0.25 | $0.10 | $0.11 |
| 0040 | Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8) | FD | 12,062 | $0.07 | $0.06 | $0.07 | $0.07 | $0.10 | $0.06 |
| 0045 | Arrow board / advance warning arrow panel (0102-76) | ED | 400 | $5.61 | $6.04 | $7.25 | $5.00 | $4.60 | $5.10 |
| 0050 | Portable changeable message sign, temporary (0102-99) | ED | 192 | $13.75 | $14.20 | $16.00 | $12.00 | $9.80 | $12.50 |
| 0055 | Temporary signalization and maintenance, intersection (0102-104) | ED | 1,672 | $9.08 | $9.30 | $28.00 | $21.00 | $8.80 | $23.50 |
| 0060 | Temporary traffic detection and maintenance, intersection (0102-107-1) | ED | 1,672 | $9.08 | $9.30 | $28.00 | $21.00 | $8.80 | $23.50 |
| 0065 | Type III barricade (0102-115) | ED | 446 | $0.94 | $0.80 | $0.30 | $0.30 | $0.30 | $0.85 |
| 0070 | Sediment barrier (0104-10-3) | LF | 1,140 | $3.52 | $8.00 | $0.01 | $3.00 | $7.50 | $8.00 |
| 0075 | Inlet protection system (0104-18) | EACH | 120 | $176.00 | $245.02 | $80.00 | $130.00 | $658.00 | $200.00 |
| 0080 | Litter removal (0107-1) | ACRE | 134.89 | $0.01 | $116.90 | $75.00 | $50.00 | $1,980.00 | $1.00 |
| 0085 | Mowing (0107-2) | ACRE | 67.46 | $0.01 | $175.30 | $750.00 | $250.00 | $1,320.00 | $1.00 |
| 0090 | Monitor existing structures- inspection and settlement monitoring (0108-1) | LS | 1 | $1.10 | $562.00 | $12,500 | $3,500.00 | $7,040.00 | $25,000 |
| 0095 | Monitor existing structures- vibration monitoring (0108-2) | LS | 1 | $1.10 | $2,700.00 | $0.01 | $3,500.00 | $2,708.00 | $25,000 |
| 0100 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $17,221 | $8,230.00 | $300,000 | $30,000 | $20,828 | $45,000 |
| 0105 | Removal of existing concrete (0110-4-10) | SY | 806 | $29.15 | $9.82 | $47.00 | $40.00 | $49.50 | $35.00 |
| 0110 | Regular excavation (0120-1) | CY | 196.80 | $48.40 | $33.22 | $34.00 | $116.00 | $49.75 | $80.00 |
| 0115 | Embankment (0120-6) | CY | 34.10 | $82.50 | $40.12 | $60.00 | $50.00 | $102.00 | $150.00 |
| 0120 | Type B stabilization (0160-4) | SY | 1,220 | $2.20 | $20.92 | $21.00 | $30.00 | $30.25 | $40.00 |
| 0125 | Optional base, base group 10 (0285-710) | SY | 955 | $64.08 | $64.25 | $40.01 | $97.00 | $73.00 | $115.00 |
| 0130 | Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6) | SY | 182,003 | $2.27 | $2.70 | $3.00 | $3.75 | $2.90 | $4.00 |
| 0135 | Superpave asphaltic conc, traffic C (0334-1-13) | TN | 65.70 | $351.92 | $444.00 | $210.00 | $260.00 | $481.00 | $350.00 |
| 0140 | Asphalt concrete friction course,traffic C, FC-12.5, PG (0337-7-83) | TN | 15,094.10 | $177.25 | $172.20 | $150.00 | $214.00 | $187.00 | $235.00 |
| 0145 | Manhole, adjust (0425-5) | EACH | 16 | $913.00 | $1,012.00 | $1,400.00 | $800.00 | $975.00 | $950.00 |
| 0150 | Valve boxes, adjust (0425-6) | EACH | 8 | $660.00 | $955.10 | $1,250.00 | $400.00 | $921.00 | $750.00 |
| 0155 | Concrete curb & gutter, type F (0520-1-10) | LF | 1,625 | $44.55 | $51.20 | $50.00 | $58.00 | $98.00 | $55.00 |
| 0160 | Concrete curb, type D (0520-2-4) | LF | 13 | $82.50 | $78.70 | $50.00 | $69.00 | $119.00 | $90.00 |
| 0165 | Traffic separator concrete- type IV, 6' wide (0520-5-42) | LF | 195 | $117.70 | $44.95 | $125.00 | $80.00 | $149.00 | $200.00 |
| 0170 | Concrete sidewalk and driveways, 4" thick (0522-1) | SY | 257 | $95.70 | $91.95 | $150.00 | $86.00 | $110.00 | $180.00 |
| 0175 | Concrete sidewalk and driveways, 6" thick (0522-2) | SY | 302 | $130.90 | $115.22 | $175.00 | $92.00 | $134.00 | $190.00 |
| 0180 | Patterned pavement (0523-3) | SY | 318 | $138.60 | $208.30 | $185.04 | $205.00 | $201.00 | $300.00 |
| 0185 | Detectable warnings (0527-2) | SF | 343 | $39.60 | $56.20 | $46.00 | $63.00 | $32.50 | $50.00 |
| 0190 | Performance turf, sod (0570-1-2) | SY | 5,044 | $6.05 | $8.55 | $6.70 | $7.00 | $5.70 | $10.00 |
| 0195 | Conduit, furnish & install, open trench (0630-2-11) | LF | 424 | $37.46 | $38.26 | $26.00 | $22.50 | $77.00 | $22.50 |
| 0200 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 91 | $75.16 | $76.80 | $31.50 | $22.50 | $76.00 | $18.00 |
| 0205 | Pull & splice box, F&I, 17" X 30" cover size (0635-2-14) | EACH | 2 | $2,092.49 | $2,138.00 | $2,000.00 | $1,400.00 | $3,029.00 | $1,850.00 |
| 0210 | Traffic monitoring site vehicle sensor-non-weight, furnish & install (0695-1-1) | EACH | 17 | $2,424.53 | $2,477.00 | $2,800.00 | $2,550.00 | $4,244.00 | $2,550.00 |
| 0215 | Traffic monitoring site inductive loop assembly, & install, 2 loops (0695-6-12) | EACH | 17 | $2,422.15 | $2,475.00 | $2,500.00 | $1,850.00 | $2,065.00 | $2,200.00 |
| 0220 | Raised pavement marker, type B (0706-1-3) | EACH | 360 | $4.40 | $4.50 | $4.00 | $4.00 | $4.30 | $6.00 |
| 0225 | Painted pavement markings, standard, white, solid, 6" (0710-11101) | GM | 14.05 | $1,870.00 | $1,910.00 | $1,800.00 | $1,700.00 | $1,842.00 | $1,565.00 |
| 0230 | Painted pavement markings, standard, white, solid for interchange and urban island, (0710-11102) | GM | 0.61 | $2,493.70 | $2,510.00 | $2,300.00 | $2,267.00 | $2,459.00 | $2,450.00 |
| 0235 | Painted pavement markings, standard, white, solid for interchange markings, 12" (0710-11103) | GM | 0.21 | $2,640.00 | $2,581.00 | $2,400.00 | $2,400.00 | $2,612.00 | $7,980.00 |
| 0240 | Painted pavement markings, standard, white, solid for crosswalk and roundabout, 12" (0710-11123) | LF | 3,933 | $1.65 | $1.70 | $1.70 | $1.50 | $1.60 | $1.15 |
| 0245 | Painted pavement markings, standard, white, solid for diagonal or chevron, 18" (0710-11124) | LF | 889 | $1.76 | $1.80 | $1.80 | $1.60 | $1.70 | $2.00 |
| 0250 | Painted pavement markings, standard, white, solid for stop line or crosswalk, 24" (0710-11125) | LF | 1,814 | $1.87 | $1.92 | $1.80 | $1.70 | $1.80 | $2.00 |
| 0255 | Painted pavement markings, standard, white, skip, 10-30 or skip, 6" wide (0710-11131) | GM | 10.73 | $539.00 | $550.10 | $500.00 | $490.00 | $531.00 | $645.00 |
| 0260 | Painted pavement marking, standard,white, 3'-9' skip drop line and approach to toll 12" wide, (0710-11133) | GM | 0.28 | $1,078.00 | $1,080.00 | $975.00 | $980.00 | $1,077.00 | $1,565.00 |
| 0265 | Painted pavement markings, standard, white, 2-4 dotted guideline/ 6-10 dotted 6" (0710-11141) | GM | 1.71 | $770.00 | $786.52 | $725.00 | $700.00 | $758.00 | $695.00 |
| 0270 | Painted pavement markings, standard, white, message or symbol (0710-11160) | EACH | 42 | $38.50 | $39.35 | $40.00 | $35.00 | $38.00 | $65.00 |
| 0275 | Painted pavement markings, standard, white, arrows (0710-11170) | EACH | 200 | $38.50 | $39.35 | $40.00 | $35.00 | $38.00 | $38.00 |
| 0280 | Painted pavement markings, standard, yellow, solid, 6" (0710-11201) | GM | 6.38 | $1,870.00 | $1,910.00 | $1,800.00 | $1,700.00 | $1,843.00 | $1,585.00 |
| 0285 | Painted pavement markings, standard, yellow, solid for diagonal or chevron, 18" (0710-11224) | LF | 106 | $1.65 | $1.70 | $1.55 | $1.50 | $1.60 | $2.00 |
| 0290 | Painted pavement markings, standard, yellow, 2-4 dotted guideline/6-10 dotted extension, 6" (0710-11241) | GM | 0.58 | $770.00 | $778.50 | $710.00 | $700.00 | $763.00 | $820.00 |
| 0295 | Partnering, DO not bid (0999-16) | LS | 1 | $6,000.00 | $6,000.00 | $6,000.00 | $6,000.00 | $6,000.00 | $6,000.00 |
| 0300 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $74,474 | $74,474 | $74,474 | $74,474 | $74,474 | $74,474 |
| 0305 | Local agency initial amount (DO not bid) (0999-26) | LS | 1 | $380.00 | $380.00 | $380.00 | $380.00 | $380.00 | $380.00 |
| 0310 | Local agency initial amount (DO not bid) (0999-26) | LS | 1 | $2,385.00 | $2,385.00 | $2,385.00 | $2,385.00 | $2,385.00 | $2,385.00 |
| 0315 | Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111) | EACH | 41 | $600.05 | $613.00 | $560.00 | $546.00 | $650.00 | $545.50 |
| 0320 | Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112) | EACH | 2 | $1,925.28 | $1,970.00 | $1,700.00 | $1,751.00 | $3,033.00 | $1,750.25 |
| 0325 | Single column ground sign assembly, F&I ground mount, 30.0 SF (0700-1113) | EACH | 5 | $2,337.78 | $2,390.00 | $2,000.00 | $2,126.00 | $3,303.00 | $2,125.25 |
| 0330 | Single column ground sign assembly, F&I barrier less than 12 SF (0700-1211) | EACH | 1 | $2,508.26 | $2,563.00 | $2,810.00 | $2,281.00 | $3,791.00 | $2,280.24 |
| 0335 | Single column ground sign assembly, remove (0700-1600) | EACH | 58 | $44.00 | $44.95 | $25.00 | $40.00 | $48.75 | $40.00 |
| 0340 | Multi-column ground sign assembly, F&I ground mount, 50.0 SF (0700-2114) | EACH | 10 | $7,535.50 | $7,698.00 | $5,400.00 | $6,851.00 | $8,664.00 | $6,850.45 |
| 0345 | Multi-column ground sign assembly, F&I ground mount, 1-200.0 SF (0700-2116) | EACH | 1 | $16,914 | $17,300 | $15,750 | $15,377 | $21,661 | $15,377 |
| 0350 | Multi-column ground sign assembly, remove (0700-2600) | EACH | 5 | $1,210.00 | $1,236.00 | $870.00 | $1,100.00 | $2,166.00 | $1,100.00 |
| 0355 | Sign panel, remove, UP to 12 SF (0700-3601) | EACH | 2 | $110.00 | $112.40 | $400.00 | $100.00 | $66.00 | $100.00 |
| 0360 | Retroreflective sign strip- furnish and install, 5' (0700-13-15) | EACH | 25 | $154.00 | $157.30 | $500.00 | $140.00 | $162.00 | $140.00 |
| 0365 | Tubular marker, 36" white post (0704-1-3) | EACH | 4 | $236.50 | $241.60 | $210.00 | $215.00 | $244.00 | $215.00 |
| 0370 | Tubular marker, 36" yellow (0704-1-4) | EACH | 11 | $236.50 | $241.60 | $220.00 | $215.00 | $244.00 | $215.00 |
| 0375 | Object marker, type 1 (0705-10-1) | EACH | 9 | $390.78 | $399.20 | $230.00 | $356.00 | $352.00 | $355.25 |
| 0380 | Raised pavement marker, type B (0706-1-3) | EACH | 3,622 | $4.40 | $4.50 | $4.15 | $4.00 | $4.30 | $4.00 |
| 0385 | Painted pavement markings, durable paint, yellow, island nose (0710-12290) | SF | 263 | $4.40 | $4.50 | $4.15 | $4.00 | $4.30 | $5.00 |
| 0390 | Painted pavement markings, surface (0710-90) | LS | 1 | $76,924 | $78,600 | $70,000 | $70,000 | $75,738 | $68,000 |
| 0395 | Thermoplastic, standard, solid, 8" for interchange and urban island (0711-11102) | GM | 0.61 | $6,371.20 | $6,412.00 | $5,835.00 | $5,792.00 | $6,283.00 | $8,000.00 |
| 0400 | Thermoplastic, standard, solid, 12" for interchange markings (0711-11103) | GM | 0.21 | $9,625.00 | $9,410.00 | $8,510.00 | $8,750.00 | $9,522.00 | $12,300 |
| 0405 | Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123) | LF | 3,933 | $3.32 | $3.40 | $3.00 | $3.02 | $3.30 | $3.65 |
| 0410 | Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124) | LF | 889 | $4.98 | $5.10 | $4.60 | $4.53 | $4.90 | $5.00 |
| 0415 | Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125) | LF | 1,748 | $6.64 | $6.80 | $6.00 | $6.04 | $6.50 | $7.30 |
| 0420 | Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141) | GM | 1.71 | $2,475.00 | $2,530.00 | $2,280.00 | $2,250.00 | $2,451.00 | $2,650.00 |
| 0425 | Thermoplastic, standard, message or symbol (0711-11160) | EACH | 42 | $141.90 | $144.95 | $130.00 | $129.00 | $140.00 | $185.00 |
| 0430 | Thermoplastic, standard, arrow (0711-11170) | EACH | 200 | $60.50 | $61.80 | $55.80 | $55.00 | $60.00 | $80.00 |
| 0435 | Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron (0711-11224) | LF | 106 | $4.57 | $4.66 | $4.20 | $4.15 | $4.50 | $5.45 |
| 0440 | Thermoplastic, standard, yellow, 2-4 dotted guide line dotted extension line, 6" (0711-11241) | GM | 0.58 | $2,475.00 | $2,502.00 | $2,268.00 | $2,250.00 | $2,454.00 | $2,850.00 |
| 0445 | Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125) | LF | 3,317 | $15.40 | $15.73 | $14.25 | $14.00 | $15.25 | $15.80 |
| 0450 | Thermoplastic, preformed, white, message (0711-14160) | EACH | 56 | $214.50 | $219.10 | $200.00 | $195.00 | $211.00 | $225.00 |
| 0455 | Thermoplastic, preformed, white, arrow (0711-14170) | EACH | 57 | $110.00 | $112.40 | $100.00 | $100.00 | $108.00 | $145.00 |
| 0460 | Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101) | GM | 14.05 | $4,810.30 | $4,912.00 | $4,400.00 | $4,373.00 | $4,755.00 | $5,345.00 |
| 0465 | Thermoplastic, standard-other surfaces, white, skip, 6",10-30 or 3-9 lane drop (0711-16131) | GM | 10.73 | $1,204.50 | $1,230.00 | $1,100.00 | $1,095.00 | $1,186.00 | $1,940.00 |
| 0470 | Thermoplastic, standard-other surfaces white, skip, 12"- approach to toll plaza or 3-9 lane drop (0711-16133) | GM | 0.28 | $2,409.00 | $2,408.00 | $2,150.00 | $2,190.00 | $2,406.00 | $3,855.00 |
| 0475 | Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201) | GM | 6.38 | $4,422.00 | $4,515.00 | $4,000.00 | $4,020.00 | $4,359.00 | $5,345.00 |
| 0480 | Green-colored pavement markings, bike lane (0714-10) | SF | 8,834 | $7.88 | $5.62 | $7.50 | $7.16 | $7.80 | $9.75 |
| 0485 | Conduit, furnish & install, open trench (0630-2-11) | LF | 793 | $25.14 | $25.67 | $21.00 | $22.50 | $15.75 | $18.00 |
| 0490 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 3,072 | $50.86 | $51.96 | $32.00 | $22.50 | $42.00 | $28.00 |
| 0495 | Signal cable- new or reconstructed intersection, furnish & install (0632-7-1) | PI | 8 | $10,673 | $10,903 | $11,000 | $10,500 | $12,702 | $9,800.00 |
| 0500 | Signal cable, remove- intersection (0632-7-6) | PI | 8 | $2,075.54 | $2,121.00 | $1,680.00 | $1,500.00 | $1,584.00 | $1,500.00 |
| 0505 | Pull & splice box, F&I, 17" X 30" cover size (0635-2-14) | EACH | 57 | $2,012.55 | $2,056.00 | $1,500.00 | $1,185.00 | $3,030.00 | $1,350.00 |
| 0510 | Aluminum signals pole, (0646-1-11) | EACH | 30 | $3,077.13 | $3,144.00 | $2,400.00 | $1,910.00 | $4,282.00 | $2,200.00 |
| 0515 | Aluminum signals pole, remove (0646-1-60) | EACH | 12 | $518.88 | $530.02 | $255.00 | $225.00 | $528.00 | $225.00 |
| 0520 | Pedestrian signal, furnish & install LED countdown, 1 way (0653-1-11) | AS | 26 | $1,084.22 | $1,108.00 | $845.00 | $750.00 | $1,168.00 | $750.00 |
| 0525 | Pedestrian signal, furnish & install LED countdown, 2 ways (0653-1-12) | AS | 4 | $1,908.98 | $1,950.00 | $1,200.00 | $1,100.00 | $2,300.00 | $1,100.00 |
| 0530 | Pedestrian signal, remove ped signal- pole/pedestal to remain (0653-1-60) | AS | 20 | $129.72 | $132.52 | $62.00 | $55.00 | $86.00 | $55.00 |
| 0535 | Loop detector inductive, F&I, type 9 (0660-1109) | EACH | 51 | $440.23 | $450.00 | $215.00 | $192.00 | $822.00 | $192.00 |
| 0540 | Loop detector inductive, F&I, type 10 (0660-1110) | EACH | 23 | $521.24 | $533.00 | $250.00 | $222.00 | $822.00 | $222.00 |
| 0545 | Loop detector inductive, remove- cabinet to remain (0660-1600) | EACH | 82 | $64.86 | $66.25 | $28.00 | $25.00 | $26.50 | $25.00 |
| 0550 | Loop assembly, F&I, type F (0660-2106) | AS | 112 | $2,114.73 | $2,160.10 | $2,500.00 | $1,850.00 | $2,111.00 | $2,150.00 |
| 0555 | Vehicle detection system- remove (0660-4-60) | EACH | 1 | $778.33 | $795.02 | $115.00 | $105.00 | $264.00 | $105.00 |
| 0560 | Vehicle detection system- remove above ground (0660-4-62) | EACH | 4 | $778.33 | $795.02 | $250.00 | $215.00 | $528.00 | $215.00 |
| 0565 | Pedestrian detector, furnish & install, standard (0665-1-11) | EACH | 34 | $470.38 | $481.00 | $300.00 | $266.00 | $447.00 | $266.00 |
| 0570 | Pedestrian detector, remove- pole/pedestal to remain (0665-1-60) | EACH | 18 | $129.72 | $133.00 | $60.00 | $53.00 | $33.00 | $53.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
Every contract let that day: FDOT letting of July 30, 2025. Compiled by Mirage Metrics.