J.W. Cheatham, LLC submitted 12 bids on Florida DOT contracts in the data, from 25 APR 2018 to 25 FEB 2026, and was the low bidder on 5 of them (42%). When it was not low, its total sat a median +12% above the low bid.
- Owner
- Florida DOT
- Low bid volume
- $16,368,230
- Latest bid
- 25 FEB 2026
- Data through
- 28 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2018 | 2 | 1 | 50% |
| 2019 | 4 | 1 | 25% |
| 2020 | 2 | 1 | 50% |
| 2023 | 1 | 1 | 100% |
| 2024 | 1 | 1 | 100% |
| 2025 | 1 | 0 | 0% |
| 2026 | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Inlet protection system | 0104-18 | EACH | 10 | 4 (40%) | $100.00 | $150.00 |
| Traffic control officer | 0102-14 | HR | 8 | 4 (50%) | $55.00 | $80.00 |
| Thermoplastic, preformed, white, message | 0711-14160 | EACH | 8 | 4 (50%) | $216.00 | $243.70 |
| Concrete sidewalk and driveways, 4" thick | 0522-1 | SY | 7 | 4 (57%) | $40.00 | $65.00 |
| Pedestrian detector, remove- pole/pedestal to remain | 0665-1-60 | EACH | 7 | 4 (57%) | $41.00 | $71.00 |
| Conduit, furnish & install, directional bore | 0630-2-12 | LF | 17 | 3 (18%) | $31.00 | $30.82 |
| Pull & splice box, F&I, 13" X 24" cover size | 0635-2-11 | EACH | 13 | 3 (23%) | $689.00 | $1,150.00 |
| Performance turf, sod | 0570-1-2 | SY | 11 | 3 (27%) | $3.70 | $5.00 |
| Mowing | 0107-2 | ACRE | 10 | 3 (30%) | $165.00 | $80.65 |
| Thermoplastic, standard, solid, 12" for crosswalk and roundabout | 0711-11123 | LF | 10 | 3 (30%) | $2.40 | $3.25 |
| Thermoplastic, standard, solid, 18" for diagonals and chevrons | 0711-11124 | LF | 8 | 3 (38%) | $2.95 | $4.58 |
| Thermoplastic, preformed, white, arrow | 0711-14170 | EACH | 8 | 3 (38%) | $146.50 | $135.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Ranger Construction Industries, Inc. | 9 | 3 of 9 |
| Halley Engineering Contractors, Inc. | 8 | 2 of 8 |
| General Asphalt Company, LLC | 5 | 3 of 5 |
| Hardrives of Delray, Inc. | 5 | 3 of 5 |
| Roadway Construction, LLC | 4 | 1 of 4 |
| C.W. Roberts Contracting, Inc. | 4 | 1 of 4 |
| Weekley Asphalt Paving, Inc. | 3 | 1 of 3 |
| Ohl USA Inc | 3 | 1 of 3 |
| Ohla USA Inc | 2 | 2 of 2 |
| The Stout Group LLC | 2 | 2 of 2 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 25 FEB 2026 | T4751 | District 4 | SR 704 (OKEECHOBEE BLVD) FROM E OF SR 809 (MILITARY TR) TO.. | 4 of 4 | $2,642,302 | +13% |
| 30 JUL 2025 | T4716 | District 4 | SR 811 (ALT A1A) FROM S OF RCA BLVD TO N OF DONALD ROSS RD | 7 of 8 | $8,007,677 | +35% |
| 31 JUL 2024 | T4694 | District 4 | SR 704 (OKEECHOBEE BLVD) FROM RED TR TO W OF AUSTRALIAN AVE | 1 of 4 | $3,150,955 | Low, 13% under the second |
| 29 MAR 2023 | T4642 | District 4 | SR 809 (MILITARY TRAIL) | 1 of 1 | $2,584,711 | Low |
| 26 FEB 2020 | T4545 | District 4 | SR 804 (BOYNTON BEACH BLVD) | 4 of 11 | $2,133,229 | +2.0% |
| 29 JAN 2020 | T4540 | District 4 | SR 5 (US 1/ROOSEVELT BR) | 1 of 5 | $1,005,700 | Low, 4.0% under the second |
| 04 DEC 2019 | T4533 | District 4 | HAMLIN BLVD | 2 of 7 | $302,128 | +1.0% |
| 22 MAY 2019 | T4504 | District 4 | SR 5 (US 1/FEDERAL HWY) | 1 of 5 | $8,446,061 | Low, 10% under the second |
| 27 MAR 2019 | T4515 | District 4 | SR 5 (US 1) (FEDERAL HWY) | 2 of 5 | $1,996,323 | +2.0% |
| 27 FEB 2019 | T4497 | District 4 | SR 7 (US 441) | 6 of 6 | $9,135,712 | +15% |
| 05 DEC 2018 | T4492 | District 4 | SR 710 (BEELINE HWY) | 1 of 8 | $1,180,804 | Low, 13% under the second |
| 25 APR 2018 | T4459 | District 4 | SR 7 | 4 of 8 | $55,576,909 | +12% |
How this record was read
FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
- Every bid counted here matched its published total to within one dollar; FDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.