FDOT contract T4733 bid tabulation

SR 9 (I-95) NB EXIT RAMP TO WB SR 68 (ORANGE AVE). Let by Florida DOT on July 30, 2025, St Lucie, District 4. 4 bids received; low bid $840,956 by C.W. Roberts Contracting, Inc..

Owner
Florida DOT
Letting
30 JUL 2025
Pay items
48
Data through
28 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1C.W. Roberts Contracting, Inc.$840,956Low
2Carr Construction, LLC$870,928+4.0%
3Ranger Construction Industries, Inc.$890,801+6.0%
4The Stout Group LLC$1,320,500+57%
FDOT contract T4733: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. C.W. Roberts Contracting, Inc.2. Carr Construction, LLC3. Ranger Construction Industries, Inc.4. The Stout Group LLC
0005Mobilization (0101-1)LS1$154,000$108,200$89,000$130,000
0010Maintenance of traffic (0102-1)DA1$55,000$84,000$237,190$400,000
0015Traffic control officer (0102-14)HR30$89.25$112.00$91.50$200.00
0020Work zone sign (0102-60)ED621$0.60$0.60$0.60$0.37
0025Channelizing device- types I, II, VP, drum, or LCD (0102-74-1)ED5,010$0.35$0.30$0.30$0.19
0030Portable changeable message sign, temporary (0102-99)ED38$36.65$28.00$30.50$22.00
0035Type III barricade (0102-115)ED5$2.50$0.60$0.60$1.50
0040Sediment barrier (0104-10-3)LF1,450$8.70$4.30$5.45$9.00
0045Inlet protection system (0104-18)EACH3$333.00$223.00$203.80$250.00
0050Litter removal (0107-1)ACRE27.46$224.00$89.00$147.10$1.00
0055Mowing (0107-2)ACRE25.69$454.00$178.00$285.90$1.00
0060Clearing & grubbing (0110-1-1)ACRE1$12,000$24,465$14,900$100,000
0065Regular excavation (0120-1)CY112.90$81.25$65.00$34.45$65.00
0070Embankment (0120-6)CY671.30$28.50$68.00$35.10$95.00
0075Type B stabilization (0160-4)SY860$36.25$40.25$10.20$30.00
0080Optional base, base group 01 (0285-701)SY619$34.25$75.00$44.00$70.00
0085Milling existing asphalt pavement, 2" avg depth (0327-70-5)SY2,633$4.25$7.60$6.35$10.00
0090Milling existing asphalt pavement, 1 1/4" avg depth (0327-70-12)SY1,002$4.35$15.00$5.50$8.00
0095Asphalt concrete friction course,traffic C, FC-9.5, PG 76-22 (0337-7-82)TN297$225.50$303.00$202.40$400.00
0100Performance turf, sod (0570-1-2)SY2,070$10.00$5.00$7.45$10.00
0105Raised pavement marker, type B (0706-1-3)EACH79$6.00$8.90$6.10$8.00
0110Painted pavement markings, standard, white, solid, 6" (0710-11101)GM0.30$3,000.00$2,746.00$3,000.00$2,500.00
0115Painted pavement markings, standard, yellow, solid, 6" (0710-11201)GM0.30$3,000.00$2,774.00$3,030.00$2,500.00
0120High friction surface course (0908-333100)SY2,633$40.00$44.75$39.75$35.00
0125Initial contingency amount, DO not bid (0999-25)LS1$41,314$41,314$41,314$41,314
0130Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111)EACH26$726.00$670.00$701.00$600.00
0135Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112)EACH1$3,875.00$3,575.00$2,260.00$3,200.00
0140Single column ground sign assembly, remove (0700-1600)EACH16$91.00$84.00$61.00$75.00
0145Retroreflective sign strip- furnish and install, 2' (0700-13-12)EACH2$151.35$140.00$182.90$125.00
0150Retroreflective sign strip- furnish and install, 5' (0700-13-15)EACH1$181.50$168.00$243.90$150.00
0155Delineator, flexible tubular (0705-11-1)EACH33$133.25$140.00$134.20$125.00
0160Raised pavement marker, type B (0706-1-3)EACH110$6.00$8.90$6.10$8.00
0165Painted pavement markings, surface (0710-90)LS1$6,700.00$8,379.00$6,770.00$17,500
0170Thermoplastic, standard, solid, 8" for interchange and urban island (0711-11102)GM0.01$22,000$13,965$23,200$10,000
0175Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123)LF30$5.20$8.90$5.25$8.00
0180Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124)LF26$7.75$11.25$7.80$10.00
0185Thermoplastic, standard, arrow (0711-11170)EACH2$123.00$13.50$124.40$12.00
0190Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125)LF30$26.00$33.50$26.50$30.00
0195Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101)GM0.29$13,650$9,723.00$13,800$8,500.00
0200Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201)GM0.30$13,400$9,592.00$13,600$8,500.00
0205Conduit, furnish & install, open trench (0630-2-11)LF1,071$16.35$11.00$14.65$13.50
0210Pull & splice box, F&I, 13" X 24" cover size (0635-2-11)EACH9$2,500.00$1,432.00$1,620.00$2,074.00
0215Lighting conductors, F&I, insulated, no.8 - 6 (0715-1-12)LF3,981$3.00$2.60$2.55$2.60
0220Light pole complete, F&I, standard pole standard foundation, 45' mounting height, 0' arm length (0715-61400)EACH7$12,000$13,057$12,800$10,044
0225Light pole complete, F&I, standard pole standard foundation, 45' mounting height, 10' arm length (0715-61421)EACH1$12,500$13,057$12,800$10,279
0230Light pole complete, remove pole and foundation (0715-69000)EACH7$1,785.00$937.00$1,720.00$1,474.00
0235Pole cable distribution system, furnish and install, conventional (0715-500-1)EACH8$1,000.00$1,235.00$1,310.00$801.00
0240Fiber optic cable locator (0633-6)DA133$260.00$23.00$42.05$216.00
FDOT contract T4733: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.

Every contract let that day: FDOT letting of July 30, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy