FDOT contract T6595 bid tabulation
SR 985 (SW 107 AVE) FROM SR 94 (SW 88 ST) TO N OF SW 56 ST. Let by Florida DOT on July 29, 2026, Miami-Dade, District 6. 12 bids received; low bid $4,378,413 by Bacallao Construction & Engineering Development, LLC D/B/A BC&E.
- Owner
- Florida DOT
- Letting
- 29 JUL 2026
- Pay items
- 152
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Bacallao Construction & Engineering Development, LLC D/B/A BC&E | $4,378,413 | Low |
| 2 | General Asphalt Company, LLC | $4,413,442 | +1.0% |
| 3 | Horizon Contractors, Inc. | $4,503,471 | +3.0% |
| 4 | Weekley Asphalt Paving, Inc. | $4,512,561 | +3.0% |
| 5 | H & R Paving, Inc. | $4,577,100 | +5.0% |
| 6 | Ohla USA Inc | $4,640,446 | +6.0% |
| 7 | The Stout Group LLC | $4,678,875 | +7.0% |
| 8 | Florida Engineering & Development Corp | $4,844,048 | +11% |
| 9 | Jva Engineering Contractor, Inc | $4,946,946 | +13% |
| 10 | Asphalt Group, Inc. | $5,069,430 | +16% |
| 11 | Aum Construction Inc. | $5,159,159 | +18% |
| 12 | Ranger Construction Industries, Inc. | $5,479,889 | +25% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Bacallao Construction & Engineering Development, LLC D/B/A BC&E | 2. General Asphalt Company, LLC | 3. Horizon Contractors, Inc. | 4. Weekley Asphalt Paving, Inc. | 5. H & R Paving, Inc. | 6. Ohla USA Inc |
|---|---|---|---|---|---|---|---|---|---|
| 0005 | Removal of existing structures/bridges 870692 (0110-3) | SF | 1 | $11,000 | $6,760.00 | $30,000 | $26,778 | $23,000 | $25,000 |
| 0010 | Concrete traffic railing- 36" single-slope (0521-5-13) | LF | 45 | $480.00 | $253.76 | $500.00 | $458.00 | $795.00 | $300.00 |
| 0015 | Mobilization (0101-1) | LS | 1 | $440,000 | $300,000 | $420,000 | $113,100 | $946,466 | $464,000 |
| 0020 | Maintenance of traffic (0102-1) | DA | 1 | $73,061 | $480,000 | $150,000 | $281,481 | $138,498 | $218,754 |
| 0025 | Pedestrian or bicycle special detour (0102-4-1) | SY | 1 | $2,500.00 | $1,040.00 | $1,000.00 | $29,000 | $5,000.00 | $1.00 |
| 0030 | Traffic control officer (0102-14) | HR | 316 | $80.00 | $88.40 | $80.00 | $93.00 | $1.00 | $80.00 |
| 0035 | Work zone sign (0102-60) | ED | 13,802 | $0.20 | $0.20 | $0.22 | $0.19 | $0.19 | $0.19 |
| 0040 | Temporary barrier, F&I, low profile, concrete (0102-71-13) | LF | 276 | $0.01 | $39.52 | $50.00 | $47.00 | $38.00 | $0.15 |
| 0045 | Temporary barrier, relocate, low profile concrete (0102-71-23) | LF | 455 | $0.01 | $16.64 | $0.01 | $39.00 | $16.00 | $0.02 |
| 0050 | Channelizing device- types I, II, VP, drum, or LCD (0102-74-1) | ED | 63,960 | $0.10 | $0.11 | $0.20 | $0.10 | $0.01 | $0.10 |
| 0055 | Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8) | FD | 4,800 | $0.07 | $0.11 | $0.12 | $0.10 | $0.10 | $0.10 |
| 0060 | Arrow board / advance warning arrow panel (0102-76) | ED | 540 | $5.00 | $5.20 | $6.00 | $5.00 | $5.00 | $5.08 |
| 0065 | Portable changeable message sign, temporary (0102-99) | ED | 1,456 | $10.00 | $9.52 | $10.00 | $9.15 | $0.01 | $9.29 |
| 0070 | Temporary signalization and maintenance, intersection (0102-104) | ED | 2,040 | $8.00 | $8.58 | $22.00 | $7.16 | $8.50 | $8.38 |
| 0075 | Temporary traffic detection and maintenance, intersection (0102-107-1) | ED | 2,040 | $8.00 | $8.58 | $22.00 | $7.16 | $8.50 | $8.38 |
| 0080 | Type III barricade (0102-115) | ED | 1,496 | $0.25 | $0.42 | $0.50 | $0.40 | $0.40 | $0.41 |
| 0085 | Removable tape, black, solid 6" (0102-913-11) | GM | 0.09 | $44,000 | $45,760 | $16,000 | $12,000 | $15,000 | $10,909 |
| 0090 | Removable tape, black, 10'-30', 6'-10', or 2'-4' skip (0102-913-12) | GM | 0.03 | $68,000 | $70,720 | $17,000 | $3,000.00 | $15,000 | $2,068.97 |
| 0095 | Removable tape, white, solid 6" (0102-913-21) | GM | 0.09 | $22,000 | $22,880 | $16,000 | $12,000 | $15,000 | $10,909 |
| 0100 | Removable tape, white, 10'-30', 6'-10', or 2'-4' skip, 6" wide (0102-913-22) | GM | 0.03 | $68,000 | $70,720 | $20,000 | $3,000.00 | $15,000 | $2,068.97 |
| 0105 | Removable tape, white, 24" stop bar (0102-913-23) | LF | 7 | $95.00 | $98.80 | $30.00 | $20.00 | $20.00 | $20.00 |
| 0110 | Removable tape, white, symbol or arrow (0102-913-29) | EACH | 1 | $850.00 | $884.00 | $400.00 | $375.00 | $300.00 | $375.00 |
| 0115 | Removable tape, yellow, solid, (0102-913-31) | GM | 0.05 | $40,000 | $41,600 | $20,000 | $12,000 | $15,000 | $10,000 |
| 0120 | Inlet protection system (0104-18) | EACH | 110 | $50.00 | $156.00 | $80.00 | $140.00 | $110.00 | $216.09 |
| 0125 | Litter removal (0107-1) | ACRE | 68.53 | $0.01 | $1.04 | $0.01 | $40.00 | $1.00 | $179.43 |
| 0130 | Mowing (0107-2) | ACRE | 26.18 | $0.01 | $1.04 | $0.01 | $40.00 | $1.00 | $470.85 |
| 0135 | Monitor existing structures- inspection and settlement monitoring (0108-1) | LS | 1 | $1.00 | $104.00 | $5,000.00 | $16,600 | $64,500 | $25,000 |
| 0140 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $45,000 | $37,440 | $30,000 | $103,259 | $19,880 | $110,000 |
| 0145 | Removal of existing concrete (0110-4-10) | SY | 3,478 | $30.00 | $40.56 | $21.00 | $39.50 | $38.00 | $45.00 |
| 0150 | Tree protection barrier (0110-21) | LF | 298 | $0.01 | $10.40 | $0.01 | $6.11 | $14.00 | $3.00 |
| 0155 | Tree root and branch pruning (0110-22) | EACH | 7 | $500.00 | $5,200.00 | $0.01 | $1,667.00 | $600.00 | $5,000.00 |
| 0160 | Borrow excavation, truck measure (0120-2-2) | CY | 571.50 | $0.01 | $41.60 | $30.00 | $58.78 | $30.00 | $23.00 |
| 0165 | Regular excavation (3-R projects only) (0120-71) | LS | 1 | $5,000.00 | $15,600 | $4,000.00 | $33,562 | $4,721.20 | $6,000.00 |
| 0170 | Type B stabilization (0160-4) | SY | 162 | $5.00 | $10.40 | $10.00 | $49.00 | $30.00 | $0.01 |
| 0175 | Reworking limerock base, 3" (0210-1-9) | SY | 3,979 | $0.01 | $8.32 | $0.01 | $4.09 | $5.00 | $10.00 |
| 0180 | Optional base, base group 11 (0285-711) | SY | 162 | $65.00 | $69.68 | $100.00 | $116.12 | $125.00 | $37.00 |
| 0185 | Milling existing asphalt pavement, 1 1/4" avg depth (0327-70-12) | SY | 73,049 | $3.25 | $2.31 | $2.90 | $3.00 | $8.20 | $4.00 |
| 0190 | Superpave asphaltic conc, traffic C (0334-1-13) | TN | 82.70 | $500.00 | $239.19 | $320.00 | $300.00 | $300.00 | $185.00 |
| 0195 | Asphalt concrete friction course,traffic C, FC-9.5, PG 76-22 (0337-7-82) | TN | 5,029.40 | $190.00 | $177.32 | $215.00 | $195.00 | $80.00 | $158.00 |
| 0200 | Miscellaneous asphalt (0339-1) | TN | 3.50 | $500.00 | $1,338.99 | $400.00 | $550.00 | $500.00 | $1,100.00 |
| 0205 | Inlets, curb, type 9, modify (0425-1209) | EACH | 1 | $6,000.00 | $4,534.40 | $4,800.00 | $8,200.00 | $5,000.00 | $3,290.00 |
| 0210 | Inlets, curb, type P-3, <10' (0425-1331) | EACH | 1 | $9,125.00 | $9,568.00 | $7,800.00 | $24,980 | $11,000 | $9,868.00 |
| 0215 | Inlets, curb. type P-3, >10' (0425-1332) | EACH | 1 | $11,160 | $11,638 | $8,800.00 | $27,000 | $11,000 | $9,868.00 |
| 0220 | Inlets, curb, type P-5, <10' (0425-1351) | EACH | 2 | $9,500.00 | $8,174.40 | $6,800.00 | $9,300.00 | $11,000 | $9,868.00 |
| 0225 | Inlets, curb, type P-5, >10' (0425-1352) | EACH | 3 | $10,625 | $13,707 | $7,800.00 | $12,000 | $6,042.00 | $10,022 |
| 0230 | Manhole, adjust (0425-5) | EACH | 18 | $550.00 | $1,040.00 | $900.00 | $900.00 | $750.00 | $1,600.00 |
| 0235 | Pipe culvert,optional material,round, 18"S/CD (0430-175118) | LF | 320 | $190.00 | $193.44 | $300.00 | $201.00 | $215.00 | $180.50 |
| 0240 | Pipe culvert,optional material,other-elip/arch, (0430-175215) | LF | 54 | $190.00 | $193.44 | $300.00 | $230.00 | $280.00 | $181.00 |
| 0245 | Pipe filling and plugging- place out of service (0430-830) | CY | 31.30 | $10.00 | $290.16 | $250.00 | $302.00 | $1.00 | $247.00 |
| 0250 | Concrete curb & gutter, type E (0520-1-7) | LF | 70 | $50.00 | $28.18 | $40.00 | $65.00 | $26.80 | $45.69 |
| 0255 | Concrete curb & gutter, type F (0520-1-10) | LF | 2,614 | $50.00 | $26.31 | $38.00 | $55.87 | $24.90 | $69.55 |
| 0260 | Concrete curb, type D (0520-2-4) | LF | 39 | $50.00 | $20.59 | $40.00 | $69.00 | $19.50 | $83.42 |
| 0265 | Valley gutter- concrete (0520-3) | LF | 52 | $50.00 | $23.09 | $40.00 | $83.00 | $22.00 | $75.26 |
| 0270 | Traffic separator concrete- type IV, 4' wide (0520-5-41) | LF | 21 | $180.00 | $57.41 | $100.00 | $200.00 | $55.00 | $253.81 |
| 0275 | Shoulder concrete barrier, curb and gutter barrier (0521-72-43) | LF | 38 | $420.00 | $385.84 | $600.00 | $737.13 | $635.00 | $287.33 |
| 0280 | Concrete sidewalk and driveways, 4" thick (0522-1) | SY | 257 | $80.00 | $56.16 | $55.00 | $104.02 | $53.10 | $129.20 |
| 0285 | Concrete sidewalk and driveways, 6" thick (0522-2) | SY | 2,277 | $100.00 | $65.52 | $75.00 | $102.10 | $62.10 | $118.45 |
| 0290 | Detectable warnings (0527-2) | SF | 1,213 | $30.00 | $37.44 | $36.00 | $41.00 | $35.00 | $40.61 |
| 0295 | Guardrail -roadway, general/low speed TL-2 (0536-1-0) | LF | 120 | $30.00 | $31.20 | $35.00 | $24.00 | $30.00 | $26.47 |
| 0300 | Guardrail transition to rigid barrier, F&I- index 536- 001, approach TL-2 (0536-8111) | EACH | 2 | $3,000.00 | $2,392.00 | $3,000.00 | $2,990.00 | $2,300.00 | $2,535.62 |
| 0305 | Guardrail removal (0536-73) | LF | 235 | $2.25 | $3.12 | $4.00 | $4.00 | $3.00 | $1.92 |
| 0310 | Guardrail end treatment- trailing anchorage (0536-85-20) | EACH | 1 | $2,400.00 | $1,768.00 | $2,500.00 | $1,900.00 | $1,700.00 | $1,978.21 |
| 0315 | Guardrail end treatment- parallel approach terminal (0536-85-24) | EACH | 1 | $4,225.00 | $3,432.00 | $4,000.00 | $3,700.00 | $3,300.00 | $3,541.19 |
| 0320 | Performance turf, sod (0570-1-2) | SY | 339 | $4.00 | $10.40 | $10.00 | $8.50 | $10.00 | $11.50 |
| 0325 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 201 | $30.00 | $24.91 | $42.00 | $35.41 | $25.00 | $24.31 |
| 0330 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 8 | $1,100.00 | $807.07 | $1,100.00 | $1,327.62 | $1,087.00 | $787.85 |
| 0335 | Electrical power service- contribution in aid of construction (ciac), FPL (DO not bid) (0639-8130) | LS | 1 | $8,000.00 | $8,000.00 | $8,000.00 | $8,000.00 | $8,000.00 | $8,000.00 |
| 0340 | Traffic monitoring site vehicle sensor-non-weight, furnish & install (0695-1-1) | EACH | 8 | $3,500.00 | $2,652.51 | $2,300.00 | $1,816.76 | $3,000.00 | $2,553.80 |
| 0345 | Traffic monitoring site inductive loop assembly, & install, 2 loops (0695-6-12) | EACH | 8 | $3,000.00 | $2,071.87 | $2,300.00 | $1,814.61 | $2,800.00 | $2,022.52 |
| 0350 | Raised pavement marker, type B (0706-1-3) | EACH | 614 | $5.50 | $5.20 | $5.00 | $4.00 | $4.50 | $4.00 |
| 0355 | Painted pavement markings, standard, white, solid, 6" (0710-11101) | GM | 0.62 | $1,000.00 | $1,038.96 | $3,000.00 | $2,000.00 | $2,800.00 | $2,000.00 |
| 0360 | Painted pavement markings, standard, white, solid for crosswalk and roundabout, 12" (0710-11123) | LF | 195 | $1.00 | $1.04 | $2.00 | $1.70 | $1.00 | $1.70 |
| 0365 | Painted pavement markings, standard, white, solid for stop line or crosswalk, 24" (0710-11125) | LF | 160 | $2.25 | $2.08 | $3.00 | $2.00 | $2.00 | $2.00 |
| 0370 | Painted pavement markings, standard, white, skip, 10-30 or skip, 6" wide (0710-11131) | GM | 0.07 | $900.00 | $780.00 | $1,700.00 | $575.00 | $1,500.00 | $500.00 |
| 0375 | Painted pavement markings, standard, white, arrows (0710-11170) | EACH | 8 | $85.00 | $78.00 | $55.00 | $40.00 | $50.00 | $40.00 |
| 0380 | Painted pavement markings, standard, yellow, solid, 6" (0710-11201) | GM | 0.43 | $1,100.00 | $1,038.96 | $3,000.00 | $2,000.00 | $2,800.00 | $1,971.83 |
| 0385 | Painted pavement markings, standard, yellow, solid for diagonal or chevron, 18" (0710-11224) | LF | 104 | $1.50 | $1.56 | $2.00 | $1.95 | $1.00 | $1.85 |
| 0390 | Painted pavement markings, standard, yellow, 2-4 dotted guideline/6-10 dotted extension, 6" (0710-11241) | GM | 0.02 | $950.00 | $780.00 | $1,700.00 | $700.00 | $1,500.00 | $388.89 |
| 0395 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $51,850 | $51,850 | $51,850 | $51,850 | $51,850 | $51,850 |
| 0400 | Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111) | EACH | 40 | $650.00 | $650.00 | $650.00 | $595.00 | $450.00 | $595.00 |
| 0405 | Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112) | EACH | 1 | $1,600.00 | $1,794.00 | $1,850.00 | $1,890.00 | $1,500.00 | $1,890.00 |
| 0410 | Single column ground sign assembly, relocate (0700-1500) | EACH | 7 | $450.00 | $213.20 | $220.00 | $380.00 | $300.00 | $380.00 |
| 0415 | Single column ground sign assembly, remove (0700-1600) | EACH | 17 | $20.00 | $52.00 | $54.00 | $50.00 | $60.00 | $50.00 |
| 0420 | Retroreflective sign strip- furnish and install, 5' (0700-13-15) | EACH | 1 | $125.00 | $119.60 | $120.00 | $120.00 | $200.00 | $120.00 |
| 0425 | Tubular marker, 36" yellow (0704-1-4) | EACH | 6 | $275.00 | $135.20 | $170.00 | $200.00 | $180.00 | $200.00 |
| 0430 | Object marker, type 3 (0705-10-3) | EACH | 1 | $500.00 | $343.20 | $350.00 | $350.00 | $300.00 | $350.00 |
| 0435 | Raised pavement marker, type B (0706-1-3) | EACH | 2,168 | $5.50 | $5.20 | $4.90 | $4.00 | $4.50 | $4.00 |
| 0440 | Painted pavement markings, surface (0710-90) | LS | 1 | $50,000 | $48,755 | $24,000 | $29,020 | $20,000 | $29,020 |
| 0445 | Thermoplastic, standard, solid, 8" for interchange and urban island (0711-11102) | GM | 0.14 | $6,700.00 | $6,780.00 | $6,500.00 | $6,424.00 | $6,000.00 | $6,140.59 |
| 0450 | Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123) | LF | 6,768 | $2.25 | $2.08 | $2.20 | $3.29 | $2.00 | $3.29 |
| 0455 | Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124) | LF | 402 | $3.50 | $3.12 | $3.25 | $4.94 | $3.00 | $4.94 |
| 0460 | Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125) | LF | 1,138 | $4.50 | $4.16 | $4.30 | $6.58 | $4.00 | $6.58 |
| 0465 | Thermoplastic, standard, message or symbol (0711-11160) | EACH | 9 | $225.00 | $208.00 | $220.00 | $89.00 | $200.00 | $89.00 |
| 0470 | Thermoplastic, standard, arrow (0711-11170) | EACH | 83 | $115.00 | $104.00 | $86.00 | $56.00 | $80.00 | $56.00 |
| 0475 | Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron (0711-11224) | LF | 1,387 | $3.50 | $3.12 | $3.25 | $4.94 | $3.00 | $4.94 |
| 0480 | Thermoplastic, standard, yellow, 2-4 dotted guide line dotted extension line, 6" (0711-11241) | GM | 0.21 | $1,500.00 | $1,284.40 | $2,200.00 | $2,275.00 | $2,000.00 | $2,232.48 |
| 0485 | Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125) | LF | 2,621 | $19.00 | $18.72 | $19.00 | $14.53 | $18.00 | $14.53 |
| 0490 | Thermoplastic, preformed, white with black contrast, arrow on concrete surface (0711-14570) | EACH | 1 | $1,050.00 | $936.00 | $1,300.00 | $1,055.00 | $1,200.00 | $1,055.00 |
| 0495 | Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101) | GM | 4.47 | $5,250.00 | $5,214.56 | $5,700.00 | $4,819.00 | $5,280.00 | $4,816.84 |
| 0500 | Thermoplastic, standard-other surfaces, white, skip, 6",10-30 or 3-9 lane drop (0711-16131) | GM | 3.43 | $1,450.00 | $1,284.40 | $2,200.00 | $1,205.00 | $2,000.00 | $1,202.54 |
| 0505 | Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201) | GM | 4.37 | $5,500.00 | $5,214.56 | $5,700.00 | $4,275.00 | $5,280.00 | $4,267.17 |
| 0510 | Thermoplastic, standard-other surfaces, yellow, skip, 6" (0711-16231) | GM | 0.38 | $1,450.00 | $1,284.40 | $2,200.00 | $1,069.00 | $2,000.00 | $1,054.75 |
| 0515 | Permanent tape, white, solid, 6" for concrete bridges (0713-103101) | GM | 0.08 | $2,300.00 | $18,720 | $38,000 | $60,000 | $35,000 | $58,537 |
| 0520 | Permanent tape, white, 10-30 6" wide, for concrete surfaces (0713-103181) | GM | 0.02 | $50,000 | $43,680 | $22,000 | $12,500 | $20,000 | $7,352.94 |
| 0525 | Permanent tape, yellow, solid, for concrete bridges (0713-103201) | GM | 0.05 | $15,000 | $15,600 | $38,000 | $60,000 | $35,000 | $50,000 |
| 0530 | Permanent tape, black, 10-30 6" wide, for concrete surfaces (0713-103381) | GM | 0.02 | $40,000 | $41,080 | $22,000 | $12,500 | $20,000 | $6,944.44 |
| 0535 | Preformed/permanent tape, remove (0713-107) | SF | 234 | $4.50 | $3.95 | $5.00 | $3.00 | $4.00 | $3.00 |
| 0540 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 2,803 | $30.00 | $24.91 | $21.00 | $30.08 | $25.00 | $24.31 |
| 0545 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 31 | $1,200.00 | $807.07 | $1,050.00 | $1,327.62 | $1,086.50 | $787.85 |
| 0550 | Pull & splice box, install (0635-2-30) | EACH | 2 | $725.00 | $893.69 | $1,100.00 | $987.94 | $600.00 | $872.41 |
| 0555 | Electrical power service, F&I, underground, meter by contractor (0639-1122) | AS | 2 | $7,000.00 | $3,944.99 | $7,500.00 | $5,082.54 | $6,691.00 | $3,735.52 |
| 0560 | Electrical power service, remove underground (0639-1620) | AS | 2 | $1,100.00 | $482.35 | $900.00 | $537.14 | $1,056.00 | $470.87 |
| 0565 | Electrical service wire, (0639-2-6) | LF | 20 | $1.50 | $0.86 | $1.00 | $0.36 | $1.40 | $0.84 |
| 0570 | Prestressed concrete pole, type P-II service pole (0641-2-12) | EACH | 2 | $3,000.00 | $2,231.49 | $3,200.00 | $2,457.78 | $2,800.00 | $2,178.34 |
| 0575 | Lighting conductors, F&I, insulated, no.8 - 6 (0715-1-12) | LF | 9,838 | $3.50 | $2.62 | $4.00 | $2.76 | $3.00 | $2.56 |
| 0580 | Lighting conductors, remove & dispose, contractor owns (0715-1-60) | LF | 4,917 | $0.50 | $0.89 | $0.25 | $0.36 | $0.50 | $0.87 |
| 0585 | Load center, F&I, secondary voltage (0715-7-11) | EACH | 2 | $16,000 | $23,963 | $23,000 | $13,938 | $16,695 | $23,392 |
| 0590 | Luminaire, F&I- replace existing luminaire on existing pole/arm, roadway, cobra head (0715-11211) | EACH | 19 | $1,750.00 | $3,340.48 | $1,450.00 | $1,343.17 | $1,613.00 | $3,260.93 |
| 0595 | Light pole complete, F&I, standard pole standard foundation, 40' mounting height, 8' arm length (0715-61311) | EACH | 1 | $8,500.00 | $8,603.03 | $8,500.00 | $9,772.25 | $7,429.00 | $8,398.11 |
| 0600 | Light pole complete, F&I, standard pole standard foundation, 40' mounting height, 10' arm length (0715-61321) | EACH | 12 | $8,000.00 | $8,221.28 | $8,500.00 | $9,935.30 | $7,850.00 | $8,025.46 |
| 0605 | Pole cable distribution system, furnish and install, conventional (0715-500-1) | EACH | 37 | $2,700.00 | $919.81 | $900.00 | $2,081.27 | $2,520.00 | $897.90 |
| 0610 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 3,798 | $30.00 | $26.18 | $42.00 | $32.55 | $28.00 | $25.55 |
| 0615 | Signal cable- new or reconstructed intersection, furnish & install (0632-7-1) | PI | 6 | $10,500 | $10,973 | $12,500 | $8,336.51 | $10,010 | $10,712 |
| 0620 | Signal cable, remove- intersection (0632-7-6) | PI | 6 | $1,750.00 | $1,337.79 | $900.00 | $1,074.29 | $1,728.00 | $1,305.93 |
| 0625 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 157 | $1,100.00 | $807.07 | $1,100.00 | $1,294.30 | $1,086.50 | $787.85 |
| 0630 | Pull & splice box, F&I, 24" X 36" cover size (0635-2-12) | EACH | 1 | $2,700.00 | $2,205.51 | $2,600.00 | $2,315.11 | $2,410.00 | $2,152.97 |
| 0635 | Pull & splice box, install (0635-2-30) | EACH | 6 | $725.00 | $893.69 | $1,000.00 | $987.94 | $600.00 | $837.51 |
| 0640 | Electrical power service, F&I, underground, meter by contractor (0639-1122) | AS | 6 | $6,500.00 | $3,944.99 | $11,000 | $5,193.65 | $6,290.00 | $3,851.03 |
| 0645 | Electrical power service, F&I, underground, meter not required (0639-1123) | AS | 1 | $4,000.00 | $4,536.66 | $11,000 | $4,378.41 | $3,645.00 | $4,428.60 |
| 0650 | Electrical service wire, & install (0639-2-1) | LF | 786 | $11.00 | $13.97 | $11.00 | $8.29 | $10.00 | $13.63 |
| 0655 | Electrical service wire, (0639-2-6) | LF | 786 | $1.00 | $0.89 | $0.25 | $0.36 | $1.00 | $0.87 |
| 0660 | Electrical service disconnect, remove- pole or cabinet to remain (0639-3-60) | EACH | 5 | $800.00 | $602.93 | $660.00 | $358.10 | $742.50 | $588.57 |
| 0665 | Prestressed concrete pole, type P-II service pole (0641-2-12) | EACH | 6 | $3,250.00 | $2,232.52 | $3,100.00 | $2,389.84 | $2,878.50 | $2,178.33 |
| 0670 | Aluminum signals pole, (0646-1-11) | EACH | 25 | $3,100.00 | $2,796.59 | $2,500.00 | $2,317.83 | $2,998.50 | $2,729.98 |
| 0675 | Aluminum signals pole, remove (0646-1-60) | EACH | 4 | $300.00 | $482.60 | $660.00 | $358.10 | $267.00 | $471.11 |
| 0680 | Vehicular traffic signal, relocate- includes removal reinstallation (0650-1-70) | AS | 2 | $750.00 | $361.76 | $900.00 | $1,021.90 | $660.00 | $353.15 |
| 0685 | Pedestrian signal, furnish & install LED countdown, 1 way (0653-1-11) | AS | 18 | $1,000.00 | $1,063.03 | $800.00 | $893.39 | $921.50 | $1,037.71 |
| 0690 | Pedestrian signal, furnish & install LED countdown, 2 ways (0653-1-12) | AS | 12 | $1,750.00 | $2,021.58 | $1,700.00 | $1,708.84 | $1,534.00 | $1,973.47 |
| 0695 | Pedestrian signal, remove ped signal- pole/pedestal to remain (0653-1-60) | AS | 37 | $220.00 | $232.36 | $110.00 | $179.05 | $179.00 | $226.82 |
| 0700 | Loop detector inductive, F&I, type 1 (0660-1101) | EACH | 12 | $650.00 | $2,196.13 | $520.00 | $565.08 | $541.00 | $2,143.82 |
| 0705 | Loop assembly, F&I, type F (0660-2106) | AS | 54 | $1,900.00 | $1,816.17 | $2,000.00 | $1,379.97 | $1,800.00 | $1,772.91 |
| 0710 | Vehicle detection system- microwave, furnish & install cabinet equipment (0660-3-11) | EACH | 4 | $5,300.00 | $18,390 | $14,500 | $13,762 | $4,434.50 | $17,952 |
| 0715 | Vehicle detection system- microwave, furnish & install, above ground equipment (0660-3-12) | EACH | 4 | $13,250 | $12,525 | $10,000 | $11,337 | $10,835 | $12,227 |
| 0720 | Pedestrian detector, furnish & install, standard (0665-1-11) | EACH | 44 | $650.00 | $699.90 | $360.00 | $382.86 | $556.00 | $683.23 |
| 0725 | Pedestrian detector, remove- pole/pedestal to remain (0665-1-60) | EACH | 20 | $75.00 | $130.12 | $110.00 | $89.52 | $66.00 | $127.03 |
| 0730 | Traffic controller assembly, F&I, caltrans W/standard lock (0670-5180) | AS | 1 | $55,000 | $55,207 | $50,000 | $42,055 | $47,286 | $53,892 |
| 0735 | Traffic controller assembly, remove controller with (0670-5600) | AS | 1 | $1,600.00 | $1,828.90 | $1,000.00 | $1,253.33 | $1,518.00 | $1,785.34 |
| 0740 | Traffic controller assembly, modify only - no components added (0670-5710) | AS | 5 | $5,000.00 | $2,424.61 | $4,000.00 | $1,234.92 | $5,735.80 | $2,366.86 |
| 0745 | Cellular modem, furnish and install (0684-8-1) | EACH | 1 | $4,700.00 | $3,079.90 | $2,500.00 | $2,280.39 | $3,918.00 | $3,006.54 |
| 0750 | Sign panel, furnish & install overhead mount, UP to 12 SF (0700-3201) | EACH | 2 | $1,000.00 | $1,114.93 | $1,000.00 | $1,059.05 | $902.50 | $1,088.38 |
| 0755 | Sign panel, remove, UP to 12 SF (0700-3601) | EACH | 7 | $150.00 | $120.59 | $220.00 | $179.05 | $139.50 | $117.72 |
| 0760 | Lighting conductors, F&I, insulated, no.8 - 6 (0715-1-12) | LF | 219 | $3.50 | $2.62 | $5.00 | $2.76 | $3.00 | $2.56 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
Every contract let that day: FDOT letting of July 29, 2026. Compiled by Mirage Metrics.