H & R Paving, Inc.: FDOT bid record
H & R Paving, Inc. submitted 27 bids on Florida DOT contracts in the data, from 31 JAN 2018 to 29 JUL 2026, and was the low bidder on 6 of them (22%). When it was not low, its total sat a median +5.0% above the low bid.
- Owner
- Florida DOT
- Low bid volume
- $19,448,653
- Latest bid
- 29 JUL 2026
- Data through
- 28 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2018 | 6 | 0 | 0% |
| 2019 | 5 | 1 | 20% |
| 2020 | 5 | 0 | 0% |
| 2021 | 2 | 0 | 0% |
| 2022 | 3 | 2 | 67% |
| 2023 | 3 | 1 | 33% |
| 2024 | 2 | 2 | 100% |
| 2026 | 1 | 0 | 0% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| District 6 | 23 | 5 | 22% |
| District 4 | 4 | 1 | 25% |
Pay items where it is most often lowest
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| General Asphalt Company, LLC | 23 | 14 of 23 |
| Weekley Asphalt Paving, Inc. | 19 | 5 of 19 |
| Halley Engineering Contractors, Inc. | 15 | 4 of 15 |
| Jva Engineering Contractor, Inc | 14 | 3 of 14 |
| Horizon Contractors, Inc. | 13 | 5 of 13 |
| Roadway Construction, LLC | 13 | 5 of 13 |
| The Stout Group LLC | 12 | 3 of 12 |
| Ranger Construction Industries, Inc. | 10 | 0 of 10 |
| Asphalt Group, Inc. | 8 | 3 of 8 |
| Florida Engineering & Development Corp | 8 | 2 of 8 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 29 JUL 2026 | T6595 | District 6 | SR 985 (SW 107 AVE) FROM SR 94 (SW 88 ST) TO N OF SW 56 ST | 5 of 12 | $4,577,100 | +5.0% |
| 24 APR 2024 | T6577 | District 6 | SR 934 (NW 74 ST / W-E 21 ST) FROM E OF W 4 AVE TO E 4 AVE | 1 of 4 | $4,280,927 | Low, 18% under the second |
| 24 APR 2024 | T6580 | District 6 | SR 90 (SW 8 ST) AND SW 4 AVE FROM SW 4 AVE TO SW 2 AVE AND.. | 1 of 6 | $5,947,099 | Low, 5.0% under the second |
| 24 MAY 2023 | T6569 | District 6 | SR 953 (LE JEUNE RD) | 1 of 6 | $3,310,000 | Low, 15% under the second |
| 26 APR 2023 | T6555 | District 6 | SR 9336 | 2 of 5 | $15,365,974 | +1.0% |
| 25 JAN 2023 | T6571 | District 6 | SR 932 (NW-NE 103 ST) | 5 of 5 | $2,995,209 | +61% |
| 05 OCT 2022 | T6545 | District 6 | SR 985 (SW 107 AVE) | 1 of 7 | $915,762 | Low, 7.0% under the second |
| 30 MAR 2022 | T4603 | District 4 | SW 64TH AVE | 1 of 8 | $2,249,738 | Low, 2.0% under the second |
| 30 MAR 2022 | T4604 | District 4 | CITY OF OAKLAND PARK LAKESIDE SIDEWALKS | 3 of 8 | $1,272,626 | +9.0% |
| 31 MAR 2021 | T6496 | District 6 | SR 5 (S DIXIE HWY) | 8 of 10 | $5,675,302 | +8.0% |
| 31 MAR 2021 | T6506 | District 6 | SR 994 (QUAIL ROOST DR) | 3 of 12 | $4,199,699 | +4.0% |
| 30 SEP 2020 | T6486 | District 6 | SR 860/MIAMI GARDENS/NW 183 ST | 2 of 11 | $3,773,757 | +3.0% |
| 26 AUG 2020 | T6505 | District 6 | SR 94 (KENDALL DR/SW 88 ST) | 5 of 14 | $4,830,000 | +5.0% |
| 29 JUL 2020 | T6507 | District 6 | SR 90/SW 8TH ST | 2 of 12 | $1,550,000 | +1.0% |
| 25 MAR 2020 | T6475 | District 6 | SR 976 (SW 40 ST) (BIRD RD) | 7 of 11 | $4,549,362 | +21% |
| 29 JAN 2020 | T6473 | District 6 | SR 94 (KENDALL DR) (SW 88 ST) | 3 of 7 | $1,623,962 | +3.0% |
| 12 JUN 2019 | T6450 | District 6 | SR 998 (CAMPBELL DR), SW 336 ST (DAVIS PKWY) AND SR 9336 (PA | 4 of 5 | $17,338,000 | +6.0% |
| 22 MAY 2019 | T4519 | District 4 | 56TH AVE, 62ND AVE AND 64TH AVE | 3 of 9 | $5,848,939 | +17% |
| 24 APR 2019 | T6424 | District 6 | SR 997 (KROME AVE) | 4 of 5 | $34,424,145 | +9.0% |
| 27 FEB 2019 | T6449 | District 6 | SR 5 (US 1) | 1 of 9 | $2,745,127 | Low, 3.0% under the second |
| 30 JAN 2019 | T4503 | District 4 | SR 858 (HALLANDALE BCH BLVD) | 4 of 6 | $2,731,183 | +21% |
| 05 DEC 2018 | T6441 | District 6 | SR 94 (SW 88 ST) (N KENDALL DR) | 4 of 11 | $3,388,572 | +7.0% |
| 29 AUG 2018 | T6455 | District 6 | SR 25 (US 27) (OKEECHOBEE RD) | 3 of 9 | $583,217 | +3.0% |
| 25 JUL 2018 | T6448 | District 6 | SR 973 (NW 87 AVE) | 2 of 6 | $858,012 | +8.0% |
| 23 MAY 2018 | T6422 | District 6 | SR 997 (KROME AVE) (SW 177TH AVE) | 4 of 9 | $38,975,839 | +4.0% |
How this record was read
FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
- Every bid counted here matched its published total to within one dollar; FDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.