FDOT letting results, July 29, 2026
18 contracts let by Florida DOT on July 29, 2026, $113,757,433 in low bids, a median of 5 bidders per contract.
- Owner
- Florida DOT
- Contracts
- 18
- Low bids, total
- $113,757,433
- Data through
- 28 OCT 2026
Contracts let that day
| Contract | Project | District | Bids | Low bidder | Low bid | Second bid | Gap | Source |
|---|---|---|---|---|---|---|---|---|
| T5883 | SR 400 (I-4) AND SR 600 (US 17/92) FROM MP 13.83 TO MP 13.856 AND MP 7.544 | District 5 | 9 | Masci General Contractors, Inc | $19,820,019 | $20,256,583 | +2.0% | FDOT |
| T1939 | SR 25 (US 27) FROM S OF WAYMAN RD TO N OF FISH EATING CREEK | District 1 | 4 | Ohla USA Inc | $18,244,000 | $18,356,004 | +1.0% | FDOT |
| T5891 | SR 9 (I-95) FROM CITRUS BLVD TO ADDISON CANAL | District 5 | 4 | Masci General Contractors, Inc | $14,950,330 | $15,337,390 | +3.0% | FDOT |
| T2A29 | SR 228 (NORMANDY BLVD) FROM THE EQUESTRIAN CENTER TO LAMPLIGHTER | District 2 | 4 | Duval Asphalt Products, Inc. | $8,775,067 | $9,236,795 | +5.0% | FDOT |
| T3A04 | SR 61 (US 319) FROM TIMBERWOLF CROSSING TO GEORGIA STATE LINE | District 3 | 5 | C.W. Roberts Contracting, Inc. | $8,418,258 | $9,583,101 | +14% | FDOT |
| T1942 | SR 64 FROM W OF CR 675 TO WINGATE RD | District 1 | 4 | C.W. Roberts Contracting, Inc. | $8,312,077 | $9,933,293 | +20% | FDOT |
| T2A40 | 20836645201 | District 2 | 2 | Anderson Columbia Co., Inc. | $7,938,321 | $10,023,288 | +26% | FDOT |
| T7599 | SR 45 (US 41) FROM S OF COUNTY LINE RD TO S OF POWELL RD | District 7 | 4 | C.W. Roberts Contracting, Inc. | $7,926,652 | $8,119,001 | +2.0% | FDOT |
| T4745 | SR 882 FOREST HILL BLVD) FROM E OF LAKE CLARKE DR TO US1 (DIXIE HWY) | District 4 | 6 | Florida Engineering & Development Corp | $5,317,094 | $5,422,489 | +2.0% | FDOT |
| T6595 | SR 985 (SW 107 AVE) FROM SR 94 (SW 88 ST) TO N OF SW 56 ST | District 6 | 12 | Bacallao Construction & Engineering Development, LLC D/B/A BC&E | $4,378,413 | $4,413,442 | +1.0% | FDOT |
| T5889 | SR 9 (I-95) FROM SR 46 TO SB MIMS REST AREA | District 5 | 5 | Masci General Contractors, Inc | $2,981,009 | $3,372,271 | +13% | FDOT |
| T7619 | MULTIUSE TRAIL AT SR 60 (W COURTNEY CAMPBELL CAUSEWAY) | District 7 | 6 | Turtle Infrastructure Partners, LLC | $1,622,913 | $2,081,188 | +28% | FDOT |
| T3A03 | SR 10 (US 90) FROM DUVAL ST TO W OF QUINCY CREEK | District 3 | 5 | Anderson Columbia Co., Inc. | $1,539,585 | $1,550,435 | +1.0% | FDOT |
| T3A16 | SR 276 (KYNESVILLE RD / PENN AVE) AT CR 167 (SOUTH ST) | District 3 | 1 | Ingram Signalization, Inc. | $998,652 | FDOT | ||
| T3920 | CR 65 (ROPING RD) OVER BEE BRANCH, BRIDGE NO 524178 | District 3 | 6 | C.W. Roberts Contracting, Inc. | $962,893 | $963,096 | 0.0% | FDOT |
| T4747 | SR 5 (S FEDERAL HWY) FROM SR 5 (US1 / N DIXIE HWY) TO 10TH AVE S | District 4 | 6 | R & D Paving LLC | $829,378 | $867,011 | +5.0% | FDOT |
| T6625 | SR 968 (W FLAGLER ST) FROM E OF SW 48 CT TO W OF SW 48 AVE | District 6 | 7 | Florida Signal & Lighting Contractors, Inc. | $594,156 | $596,907 | 0.0% | FDOT |
| T2A72 | SR 200 (US 441 / N MLK MEMORIAL HWY) FROM NW 125TH STREET TO W OF | District 2 | 9 | Concept Construction and Demoli | $148,618 | $163,532 | +10% | FDOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than FDOT received, the others did not match their published totals and are left out. Each contract number opens its full bid tabulation.