FDOT contract T1942 bid tabulation
SR 64 FROM W OF CR 675 TO WINGATE RD. Let by Florida DOT on July 29, 2026, Manatee, District 1. 4 bids received; low bid $8,312,077 by C.W. Roberts Contracting, Inc..
- Owner
- Florida DOT
- Letting
- 29 JUL 2026
- Pay items
- 86
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | C.W. Roberts Contracting, Inc. | $8,312,077 | Low |
| 2 | Ajax Paving Industries of Florida LLC | $9,933,293 | +20% |
| 3 | Superior Asphalt, Inc. | $10,214,148 | +23% |
| 4 | Preferred Materials Inc. | $11,070,010 | +33% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. C.W. Roberts Contracting, Inc. | 2. Ajax Paving Industries of Florida LLC | 3. Superior Asphalt, Inc. | 4. Preferred Materials Inc. |
|---|---|---|---|---|---|---|---|
| 0005 | Mobilization (0101-1) | LS | 1 | $347,226 | $320,008 | $585,700 | $477,912 |
| 0010 | Maintenance of traffic (0102-1) | DA | 1 | $290,564 | $510,540 | $365,000 | $440,315 |
| 0015 | Work zone sign (0102-60) | ED | 15,480 | $0.22 | $0.23 | $0.30 | $0.22 |
| 0020 | Temporary barrier, F&I, anchored (0102-71-15) | LF | 875 | $43.76 | $40.07 | $44.00 | $37.92 |
| 0025 | Channelizing device- types I, II, VP, drum, or LCD (0102-74-1) | ED | 22,500 | $0.11 | $0.11 | $0.15 | $0.10 |
| 0030 | Arrow board / advance warning arrow panel (0102-76) | ED | 360 | $6.32 | $6.50 | $5.80 | $6.15 |
| 0035 | Temporary raised/retroreflective pavement marker, type B (0102-78-2) | EACH | 2,555 | $4.57 | $4.33 | $4.60 | $4.10 |
| 0040 | Temporary crash cushion, redirective option (0102-89-1) | LO | 6 | $2,892.28 | $947.66 | $1,260.00 | $896.65 |
| 0045 | Portable changeable message sign, temporary (0102-99) | ED | 388 | $11.58 | $11.91 | $12.70 | $11.27 |
| 0050 | Type III barricade (0102-115) | ED | 360 | $0.37 | $0.38 | $0.55 | $0.36 |
| 0055 | Temporary raised rumble per day, includes all sets and relocations (0102-909) | DA | 540 | $40.00 | $41.16 | $23.00 | $38.94 |
| 0060 | Sediment barrier (0104-10-3) | LF | 130,109 | $0.01 | $1.35 | $2.30 | $1.95 |
| 0065 | Floating turbidity barrier (0104-11) | LF | 134 | $14.69 | $14.62 | $32.50 | $12.30 |
| 0070 | Inlet protection system (0104-18) | EACH | 5 | $147.02 | $189.53 | $187.00 | $184.45 |
| 0075 | Litter removal (0107-1) | ACRE | 556.85 | $39.82 | $64.98 | $39.00 | $34.30 |
| 0080 | Mowing (0107-2) | ACRE | 469.78 | $85.76 | $64.98 | $78.00 | $69.28 |
| 0085 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $27,458 | $74,645 | $70,250 | $98,826 |
| 0090 | Removal of existing concrete (0110-4-10) | SY | 247 | $43.37 | $75.81 | $40.00 | $35.61 |
| 0095 | Regular excavation (0120-1) | CY | 183.90 | $51.73 | $90.81 | $430.00 | $25.96 |
| 0100 | Embankment (0120-6) | CY | 599.60 | $49.19 | $75.00 | $96.00 | $57.79 |
| 0105 | Type B stabilization (0160-4) | SY | 498 | $24.92 | $57.29 | $109.00 | $35.55 |
| 0110 | Optional base, base group 01 (0285-701) | SY | 223 | $87.22 | $240.71 | $115.00 | $49.74 |
| 0115 | Optional base, base group 04 (0285-704) | SY | 41 | $161.73 | $539.79 | $167.50 | $110.45 |
| 0120 | Turnout base- optional materials (0286-1) | SY | 616 | $25.07 | $82.37 | $131.00 | $63.83 |
| 0125 | Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6) | SY | 68,205 | $1.66 | $2.81 | $2.05 | $1.92 |
| 0130 | Milling existing asphalt pavement, 4" avg depth (0327-70-7) | SY | 153,892 | $3.06 | $5.44 | $2.35 | $4.89 |
| 0135 | Milling existing asphalt pavement, 5" avg depth (0327-70-10) | SY | 1,317 | $8.41 | $14.37 | $10.20 | $18.92 |
| 0140 | Milling existing asphalt pavement, 4 3/4" avg depth (0327-70-26) | SY | 2,575 | $5.78 | $9.12 | $7.80 | $12.32 |
| 0145 | Superpave asphaltic concrete, traffic C, PG76-22 (0334-1-53) | TN | 21,930.40 | $126.41 | $140.75 | $168.70 | $182.18 |
| 0150 | Asphalt concrete friction course,traffic C, FC-12.5, PG (0337-7-83) | TN | 18,665.90 | $149.10 | $158.91 | $162.65 | $180.10 |
| 0155 | Inlets, DT bot, type D, <10' (0425-1541) | EACH | 1 | $9,120.77 | $40,181 | $10,950 | $9,724.61 |
| 0160 | Manholes, J-7, <10' (0425-2-71) | EACH | 1 | $41,490 | $6,281.62 | $33,100 | $29,403 |
| 0165 | Pipe culvert, optional material, round, 18"SD (0430-174118) | LF | 69 | $319.70 | $491.70 | $223.00 | $198.25 |
| 0170 | Pipe culvert,optional material,round, 18"S/CD (0430-175118) | LF | 31 | $188.03 | $387.73 | $223.00 | $197.73 |
| 0175 | Pipe culvert,optional material,round, 24"S/CD (0430-175124) | LF | 63 | $167.92 | $309.75 | $310.00 | $272.78 |
| 0180 | Pipe culvert, opt material, round, 30"S/CD (0430-175130) | LF | 114 | $404.98 | $506.86 | $355.00 | $315.77 |
| 0185 | Pipe culvert, opt material, shape - elip/arch, 60"S/CD (0430-175260) | LF | 41 | $881.51 | $1,624.56 | $1,245.00 | $1,105.86 |
| 0190 | Straight concrete endwalls, triple, 0 degrees, round (0430-530300) | EACH | 1 | $17,006 | $21,011 | $11,265 | $10,006 |
| 0195 | Mitered end section, optional round, 18" SD (0430-984125) | EACH | 6 | $3,902.19 | $4,440.46 | $3,520.00 | $3,124.43 |
| 0200 | Mitered end section , optional round, 30" SD (0430-984133) | EACH | 2 | $11,720 | $9,584.89 | $19,100 | $16,960 |
| 0205 | Mitered end section, optional shape /ellip/arch, 60" side drain (0430-984643) | EACH | 1 | $24,434 | $29,459 | $30,700 | $27,242 |
| 0210 | Concrete curb & gutter, type F (0520-1-10) | LF | 24 | $267.10 | $27.08 | $56.00 | $49.76 |
| 0215 | Concrete ditch pavement, non reinforced, 4" (0524-1-2) | SY | 120 | $137.36 | $135.38 | $139.00 | $123.13 |
| 0220 | Performance turf, sod (0570-1-2) | SY | 32,797 | $4.46 | $3.12 | $5.20 | $5.98 |
| 0225 | Shoulder drop off soil (0570-13-1) | CY | 4,979.90 | $32.50 | $64.22 | $19.90 | $43.85 |
| 0230 | Painted pavement markings, standard, white, solid, 6" (0710-11101) | GM | 21.76 | $1,715.60 | $1,624.56 | $1,730.00 | $1,537.05 |
| 0235 | Painted pavement markings, standard, white, solid for interchange and urban island, (0710-11102) | GM | 0.04 | $2,031.39 | $1,732.86 | $1,845.00 | $1,622.50 |
| 0240 | Painted pavement markings, standard, white, solid for crosswalk and roundabout, 12" (0710-11123) | LF | 819 | $1.14 | $1.08 | $1.15 | $1.02 |
| 0245 | Painted pavement markings, standard, white, solid for diagonal or chevron, 18" (0710-11124) | LF | 884 | $1.71 | $1.62 | $1.75 | $1.54 |
| 0250 | Painted pavement markings, standard, white, solid for stop line or crosswalk, 24" (0710-11125) | LF | 109 | $2.29 | $2.17 | $2.30 | $2.05 |
| 0255 | Painted pavement markings, standard, white, 2-4 dotted guideline/ 6-10 dotted 6" (0710-11141) | GM | 0.20 | $1,172.05 | $1,083.04 | $1,155.00 | $1,028.46 |
| 0260 | Painted pavement markings, standard, white, message or symbol (0710-11160) | EACH | 5 | $97.13 | $92.06 | $100.00 | $87.10 |
| 0265 | Painted pavement markings, standard, white, arrows (0710-11170) | EACH | 13 | $51.42 | $48.74 | $52.00 | $46.11 |
| 0270 | Painted pavement markings, standard, white, yield line (0710-11180) | LF | 16 | $17.15 | $16.25 | $17.30 | $15.37 |
| 0275 | Painted pavement markings, standard, yellow, solid, 6" (0710-11201) | GM | 9.82 | $1,713.59 | $1,624.56 | $1,730.00 | $1,536.65 |
| 0280 | Painted pavement markings, standard, yellow, solid for diagonal or chevron, 18" (0710-11224) | LF | 775 | $1.71 | $1.62 | $1.75 | $1.54 |
| 0285 | Painted pavement markings, standard, yellow, skip, 6" (0710-11231) | GM | 7.25 | $913.94 | $866.43 | $925.00 | $819.57 |
| 0290 | Painted pavement markings, standard, yellow, 2-4 dotted guideline/6-10 dotted extension, 6" (0710-11241) | GM | 0.15 | $1,182.14 | $1,083.04 | $1,155.00 | $1,019.10 |
| 0295 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $117,457 | $117,457 | $117,457 | $117,457 |
| 0300 | Ground-in rumble strips, 8" sinusoidal (0546-72-3) | GM | 32.44 | $2,766.42 | $1,299.65 | $1,715.00 | $2,041.78 |
| 0305 | Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111) | EACH | 27 | $557.86 | $519.86 | $610.00 | $491.88 |
| 0310 | Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112) | EACH | 1 | $2,631.42 | $2,382.68 | $2,885.00 | $2,254.44 |
| 0315 | Single column ground sign assembly, remove (0700-1600) | EACH | 21 | $52.63 | $21.66 | $58.00 | $20.49 |
| 0320 | Multi-column ground sign assembly, F&I ground mount, 20.0 SF (0700-2112) | EACH | 4 | $4,999.70 | $6,389.92 | $5,480.00 | $6,046.00 |
| 0325 | Multi-column ground sign assembly, F&I ground mount, 50.0 SF (0700-2114) | EACH | 1 | $7,894.27 | $10,289 | $8,655.00 | $9,735.08 |
| 0330 | Multi-column ground sign assembly, remove (0700-2600) | EACH | 5 | $1,368.34 | $2,166.08 | $1,500.00 | $2,049.49 |
| 0335 | Retroreflective sign strip- furnish and install, 5' (0700-13-15) | EACH | 19 | $111.57 | $108.30 | $123.00 | $102.47 |
| 0340 | Enhanced highway sign solar powered, relocate - ground mount (0700-142802) | EACH | 2 | $3,157.71 | $3,790.63 | $3,460.00 | $3,586.61 |
| 0345 | Object marker, type 1 (0705-10-1) | EACH | 6 | $210.51 | $297.84 | $230.00 | $281.81 |
| 0350 | Raised pavement marker, type B (0706-1-3) | EACH | 2,555 | $4.57 | $4.33 | $4.60 | $4.10 |
| 0355 | Painted pavement markings, surface (0710-90) | LS | 1 | $51,423 | $48,737 | $51,900 | $46,114 |
| 0360 | Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124) | LF | 884 | $5.71 | $5.42 | $5.80 | $5.12 |
| 0365 | Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125) | LF | 109 | $6.86 | $6.50 | $7.00 | $6.15 |
| 0370 | Thermoplastic, standard, solid, 12" for speed reduction markings (0711-11129) | LF | 819 | $8.00 | $7.58 | $8.00 | $7.17 |
| 0375 | Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141) | GM | 0.20 | $5,274.15 | $4,873.67 | $5,200.00 | $4,602.97 |
| 0380 | Thermoplastic, standard, message or symbol (0711-11160) | EACH | 5 | $285.68 | $270.76 | $290.00 | $256.19 |
| 0385 | Thermoplastic, standard, arrow (0711-11170) | EACH | 13 | $102.85 | $97.47 | $104.00 | $92.23 |
| 0390 | Thermoplastic, standard, yield line (0711-11180) | LF | 16 | $22.86 | $21.66 | $23.00 | $20.50 |
| 0395 | Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron (0711-11224) | LF | 775 | $6.86 | $6.50 | $7.00 | $6.15 |
| 0400 | Thermoplastic, standard, yellow, 2-4 dotted guide line dotted extension line, 6" (0711-11241) | GM | 0.15 | $5,319.66 | $4,873.67 | $5,200.00 | $4,605.72 |
| 0405 | Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101) | GM | 21.76 | $5,723.94 | $5,415.19 | $5,770.00 | $5,124.52 |
| 0410 | Thermoplastic, standard-other surfaces, white, solid, 8" (0711-16102) | GM | 0.04 | $8,253.06 | $7,039.75 | $7,500.00 | $6,618.06 |
| 0415 | Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201) | GM | 9.82 | $5,711.95 | $5,415.19 | $5,770.00 | $5,124.21 |
| 0420 | Thermoplastic, standard-other surfaces, yellow, skip, 6" (0711-16231) | GM | 7.25 | $285.61 | $270.76 | $290.00 | $256.12 |
| 0425 | Permanent tape, white, solid, 6" for concrete bridges (0713-103101) | GM | 0.19 | $34,647 | $32,491 | $34,610 | $30,808 |
| 0430 | Permanent tape, yellow, solid, for concrete bridges (0713-103201) | GM | 0.19 | $34,647 | $32,491 | $34,610 | $30,808 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
Every contract let that day: FDOT letting of July 29, 2026. Compiled by Mirage Metrics.