FDOT contract T3920 bid tabulation

CR 65 (ROPING RD) OVER BEE BRANCH, BRIDGE NO 524178. Let by Florida DOT on July 29, 2026, Holmes, District 3. 6 bids received; low bid $962,893 by C.W. Roberts Contracting, Inc..

Owner
Florida DOT
Letting
29 JUL 2026
Pay items
43
Data through
28 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1C.W. Roberts Contracting, Inc.$962,893Low
2RBM Contracting Services, LLC$963,0960.0%
3RJ Gorman Contracting LLC$968,686+1.0%
4Murphree Bridge Corporation$979,483+2.0%
5North Florida Construction, Inc.$1,139,259+18%
6Superior Construction Company Southeast, LLC$1,345,716+40%
FDOT contract T3920: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. C.W. Roberts Contracting, Inc.2. RBM Contracting Services, LLC3. RJ Gorman Contracting LLC4. Murphree Bridge Corporation5. North Florida Construction, Inc.6. Superior Construction Company Southeast, LLC
0005Removal of existing structures/bridges (0110-3)SF1$15,100$22,500$7,679.35$50,000$30,000$100,000
0010Concrete class IV, culverts (0400-4-1)CY128.90$2,300.00$3,379.47$1,797.81$3,750.00$3,850.00$2,750.00
0015Reinforcing steel- roadway (0415-1-1)LB20,655$3.90$1.20$1.85$2.25$5.00$2.50
0020Metal traffic railing, thrie retrofit (0460-71-1)LF126$260.00$196.00$297.43$225.00$250.00$225.00
0025Riprap, sand-cement bags (0530-1100)CY11.50$2,100.00$1,275.00$972.95$1,530.00$550.00$1,250.00
0030Riprap- rubble, bank and shore (0530-3-3)TN398.50$120.00$211.86$140.26$85.00$140.00$170.00
0035Bedding stone (0530-74)TN148.40$190.00$120.05$157.78$100.00$140.00$200.00
0040Mobilization (0101-1)LS1$150,000$46,500$267,553$86,154$50,000$134,250
0045Maintenance of traffic (0102-1)DA1$2,900.00$24,500$8,075.80$15,650$20,000$50,346
0050Work zone sign (0102-60)ED17,640$0.35$0.16$0.40$0.30$0.13$0.50
0055Channelizing device- types I, II, VP, drum, or LCD (0102-74-1)ED1,552$0.20$0.20$0.20$0.15$0.17$0.25
0060Portable changeable message sign, temporary (0102-99)ED388$23.00$32.50$26.44$20.00$30.00$25.00
0065Type III barricade (0102-115)ED1,800$0.60$0.65$0.66$0.50$0.55$0.75
0070Artificial coverings /rolled erosion control products (0104-1)SY11$45.00$32.00$179.98$57.04$100.00$100.00
0075Sediment barrier (0104-10-3)LF613$17.00$6.03$5.04$3.30$11.00$6.50
0080Floating turbidity barrier (0104-11)LF220$20.00$2.50$15.98$24.20$55.00$22.00
0085Soil tracking prevention device (0104-15)EACH2$790.00$4,237.20$3,943.82$3,520.00$4,000.00$1.00
0090Clearing & grubbing (0110-1-1)ACRE1$36,000$9,767.35$28,420$18,650$50,000$120,496
0095Removal of existing concrete (0110-4-10)SY55$210.00$113.62$174.47$22.15$100.00$1,300.00
0100Regular excavation (0120-1)CY668$54.00$23.65$19.75$16.34$45.00$40.00
0105Borrow excavation, truck measure (0120-2-2)CY571.40$25.00$23.65$24.95$20.08$35.00$55.00
0110Subsoil excavation (0120-4)CY172.90$25.00$23.65$21.48$26.20$70.00$45.00
0115Type B stabilization (0160-4)SY762$10.00$13.24$15.93$10.45$22.00$25.00
0120Optional base, base group 06 (0285-706)SY645$38.00$38.53$42.68$20.74$35.00$72.50
0125Superpave asphaltic conc, traffic B (0334-1-12)TN51.90$240.00$300.00$350.30$291.50$330.00$265.00
0130Miscellaneous asphalt (0339-1)TN12$260.00$315.00$363.52$467.50$600.00$620.00
0135Concrete curb & gutter, type F (0520-1-10)LF32$180.00$61.08$178.47$62.80$80.00$205.00
0140Concrete ditch pavement, 6", reinforced (0524-1-49)SY18$340.00$162.51$787.15$247.50$275.00$950.00
0145Riprap, rubble, F&I, ditch lining (0530-3-4)TN194.70$120.00$185.00$147.77$159.50$140.00$170.00
0150Bedding stone (0530-74)TN139.90$130.00$105.25$159.14$81.40$140.00$200.00
0155Guardrail -roadway, general/low speed TL-2 (0536-1-0)LF238$21.00$40.25$23.80$18.00$20.00$18.00
0160Special guardrail post- frangible leave-out for mounting through concrete surface (0536-7-4)EACH1$120.00$172.50$132.19$100.00$100.00$100.00
0165Guardrail transition to rigid barrier, F&I- index 536- 002, approach TL-3 (0536-8122)EACH2$4,100.00$6,698.75$4,626.68$3,500.00$4,000.00$3,500.00
0170Guardrail transition to rigid barrier, F&I- index 536- 002, trailing (0536-8123)EACH2$3,500.00$6,698.75$3,965.71$3,000.00$3,500.00$3,000.00
0175Guardrail end treatment- trailing anchorage (0536-85-20)EACH2$2,300.00$3,812.25$2,643.81$2,000.00$2,500.00$2,000.00
0180Guardrail end treatment- parallel approach terminal (0536-85-24)EACH2$3,500.00$6,008.75$3,965.71$3,000.00$3,500.00$3,000.00
0185Performance turf, sod (0570-1-2)SY1,126$9.30$3.90$6.15$3.30$8.00$20.00
0190Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111)EACH2$580.00$6,008.75$660.95$500.00$550.00$500.00
0195Single column ground sign assembly, remove (0700-1600)EACH2$58.00$57.50$66.09$50.00$60.00$50.00
0200Raised pavement marker, type B (0706-1-3)EACH14$5.85$23.00$6.61$5.00$6.00$5.00
0205Painted pavement markings, surface (0710-90)LS1$2,200.00$1,725.00$2,498.40$1,890.00$2,100.00$1,890.00
0210Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101)GM0.10$11,000$17,250$13,219$10,000$11,000$10,000
0215Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201)GM0.10$11,000$17,250$13,219$10,000$11,000$10,000
FDOT contract T3920: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.

Every contract let that day: FDOT letting of July 29, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy