FDOT contract T3920 bid tabulation
CR 65 (ROPING RD) OVER BEE BRANCH, BRIDGE NO 524178. Let by Florida DOT on July 29, 2026, Holmes, District 3. 6 bids received; low bid $962,893 by C.W. Roberts Contracting, Inc..
- Owner
- Florida DOT
- Letting
- 29 JUL 2026
- Pay items
- 43
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | C.W. Roberts Contracting, Inc. | $962,893 | Low |
| 2 | RBM Contracting Services, LLC | $963,096 | 0.0% |
| 3 | RJ Gorman Contracting LLC | $968,686 | +1.0% |
| 4 | Murphree Bridge Corporation | $979,483 | +2.0% |
| 5 | North Florida Construction, Inc. | $1,139,259 | +18% |
| 6 | Superior Construction Company Southeast, LLC | $1,345,716 | +40% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. C.W. Roberts Contracting, Inc. | 2. RBM Contracting Services, LLC | 3. RJ Gorman Contracting LLC | 4. Murphree Bridge Corporation | 5. North Florida Construction, Inc. | 6. Superior Construction Company Southeast, LLC |
|---|---|---|---|---|---|---|---|---|---|
| 0005 | Removal of existing structures/bridges (0110-3) | SF | 1 | $15,100 | $22,500 | $7,679.35 | $50,000 | $30,000 | $100,000 |
| 0010 | Concrete class IV, culverts (0400-4-1) | CY | 128.90 | $2,300.00 | $3,379.47 | $1,797.81 | $3,750.00 | $3,850.00 | $2,750.00 |
| 0015 | Reinforcing steel- roadway (0415-1-1) | LB | 20,655 | $3.90 | $1.20 | $1.85 | $2.25 | $5.00 | $2.50 |
| 0020 | Metal traffic railing, thrie retrofit (0460-71-1) | LF | 126 | $260.00 | $196.00 | $297.43 | $225.00 | $250.00 | $225.00 |
| 0025 | Riprap, sand-cement bags (0530-1100) | CY | 11.50 | $2,100.00 | $1,275.00 | $972.95 | $1,530.00 | $550.00 | $1,250.00 |
| 0030 | Riprap- rubble, bank and shore (0530-3-3) | TN | 398.50 | $120.00 | $211.86 | $140.26 | $85.00 | $140.00 | $170.00 |
| 0035 | Bedding stone (0530-74) | TN | 148.40 | $190.00 | $120.05 | $157.78 | $100.00 | $140.00 | $200.00 |
| 0040 | Mobilization (0101-1) | LS | 1 | $150,000 | $46,500 | $267,553 | $86,154 | $50,000 | $134,250 |
| 0045 | Maintenance of traffic (0102-1) | DA | 1 | $2,900.00 | $24,500 | $8,075.80 | $15,650 | $20,000 | $50,346 |
| 0050 | Work zone sign (0102-60) | ED | 17,640 | $0.35 | $0.16 | $0.40 | $0.30 | $0.13 | $0.50 |
| 0055 | Channelizing device- types I, II, VP, drum, or LCD (0102-74-1) | ED | 1,552 | $0.20 | $0.20 | $0.20 | $0.15 | $0.17 | $0.25 |
| 0060 | Portable changeable message sign, temporary (0102-99) | ED | 388 | $23.00 | $32.50 | $26.44 | $20.00 | $30.00 | $25.00 |
| 0065 | Type III barricade (0102-115) | ED | 1,800 | $0.60 | $0.65 | $0.66 | $0.50 | $0.55 | $0.75 |
| 0070 | Artificial coverings /rolled erosion control products (0104-1) | SY | 11 | $45.00 | $32.00 | $179.98 | $57.04 | $100.00 | $100.00 |
| 0075 | Sediment barrier (0104-10-3) | LF | 613 | $17.00 | $6.03 | $5.04 | $3.30 | $11.00 | $6.50 |
| 0080 | Floating turbidity barrier (0104-11) | LF | 220 | $20.00 | $2.50 | $15.98 | $24.20 | $55.00 | $22.00 |
| 0085 | Soil tracking prevention device (0104-15) | EACH | 2 | $790.00 | $4,237.20 | $3,943.82 | $3,520.00 | $4,000.00 | $1.00 |
| 0090 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $36,000 | $9,767.35 | $28,420 | $18,650 | $50,000 | $120,496 |
| 0095 | Removal of existing concrete (0110-4-10) | SY | 55 | $210.00 | $113.62 | $174.47 | $22.15 | $100.00 | $1,300.00 |
| 0100 | Regular excavation (0120-1) | CY | 668 | $54.00 | $23.65 | $19.75 | $16.34 | $45.00 | $40.00 |
| 0105 | Borrow excavation, truck measure (0120-2-2) | CY | 571.40 | $25.00 | $23.65 | $24.95 | $20.08 | $35.00 | $55.00 |
| 0110 | Subsoil excavation (0120-4) | CY | 172.90 | $25.00 | $23.65 | $21.48 | $26.20 | $70.00 | $45.00 |
| 0115 | Type B stabilization (0160-4) | SY | 762 | $10.00 | $13.24 | $15.93 | $10.45 | $22.00 | $25.00 |
| 0120 | Optional base, base group 06 (0285-706) | SY | 645 | $38.00 | $38.53 | $42.68 | $20.74 | $35.00 | $72.50 |
| 0125 | Superpave asphaltic conc, traffic B (0334-1-12) | TN | 51.90 | $240.00 | $300.00 | $350.30 | $291.50 | $330.00 | $265.00 |
| 0130 | Miscellaneous asphalt (0339-1) | TN | 12 | $260.00 | $315.00 | $363.52 | $467.50 | $600.00 | $620.00 |
| 0135 | Concrete curb & gutter, type F (0520-1-10) | LF | 32 | $180.00 | $61.08 | $178.47 | $62.80 | $80.00 | $205.00 |
| 0140 | Concrete ditch pavement, 6", reinforced (0524-1-49) | SY | 18 | $340.00 | $162.51 | $787.15 | $247.50 | $275.00 | $950.00 |
| 0145 | Riprap, rubble, F&I, ditch lining (0530-3-4) | TN | 194.70 | $120.00 | $185.00 | $147.77 | $159.50 | $140.00 | $170.00 |
| 0150 | Bedding stone (0530-74) | TN | 139.90 | $130.00 | $105.25 | $159.14 | $81.40 | $140.00 | $200.00 |
| 0155 | Guardrail -roadway, general/low speed TL-2 (0536-1-0) | LF | 238 | $21.00 | $40.25 | $23.80 | $18.00 | $20.00 | $18.00 |
| 0160 | Special guardrail post- frangible leave-out for mounting through concrete surface (0536-7-4) | EACH | 1 | $120.00 | $172.50 | $132.19 | $100.00 | $100.00 | $100.00 |
| 0165 | Guardrail transition to rigid barrier, F&I- index 536- 002, approach TL-3 (0536-8122) | EACH | 2 | $4,100.00 | $6,698.75 | $4,626.68 | $3,500.00 | $4,000.00 | $3,500.00 |
| 0170 | Guardrail transition to rigid barrier, F&I- index 536- 002, trailing (0536-8123) | EACH | 2 | $3,500.00 | $6,698.75 | $3,965.71 | $3,000.00 | $3,500.00 | $3,000.00 |
| 0175 | Guardrail end treatment- trailing anchorage (0536-85-20) | EACH | 2 | $2,300.00 | $3,812.25 | $2,643.81 | $2,000.00 | $2,500.00 | $2,000.00 |
| 0180 | Guardrail end treatment- parallel approach terminal (0536-85-24) | EACH | 2 | $3,500.00 | $6,008.75 | $3,965.71 | $3,000.00 | $3,500.00 | $3,000.00 |
| 0185 | Performance turf, sod (0570-1-2) | SY | 1,126 | $9.30 | $3.90 | $6.15 | $3.30 | $8.00 | $20.00 |
| 0190 | Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111) | EACH | 2 | $580.00 | $6,008.75 | $660.95 | $500.00 | $550.00 | $500.00 |
| 0195 | Single column ground sign assembly, remove (0700-1600) | EACH | 2 | $58.00 | $57.50 | $66.09 | $50.00 | $60.00 | $50.00 |
| 0200 | Raised pavement marker, type B (0706-1-3) | EACH | 14 | $5.85 | $23.00 | $6.61 | $5.00 | $6.00 | $5.00 |
| 0205 | Painted pavement markings, surface (0710-90) | LS | 1 | $2,200.00 | $1,725.00 | $2,498.40 | $1,890.00 | $2,100.00 | $1,890.00 |
| 0210 | Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101) | GM | 0.10 | $11,000 | $17,250 | $13,219 | $10,000 | $11,000 | $10,000 |
| 0215 | Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201) | GM | 0.10 | $11,000 | $17,250 | $13,219 | $10,000 | $11,000 | $10,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
Every contract let that day: FDOT letting of July 29, 2026. Compiled by Mirage Metrics.