RJ Gorman Contracting LLC: FDOT bid record
RJ Gorman Contracting LLC submitted 19 bids on Florida DOT contracts in the data, from 26 OCT 2022 to 30 SEP 2026, and was the low bidder on 4 of them (21%). When it was not low, its total sat a median +27% above the low bid.
- Owner
- Florida DOT
- Low bid volume
- $34,833,112
- Latest bid
- 30 SEP 2026
- Data through
- 28 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2022 | 1 | 0 | 0% |
| 2023 | 2 | 0 | 0% |
| 2024 | 2 | 1 | 50% |
| 2025 | 3 | 0 | 0% |
| 2026 | 11 | 3 | 27% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| District 3 | 16 | 4 | 25% |
| District 2 | 2 | 0 | 0% |
| District 1 | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Sediment barrier | 0104-10-3 | LF | 20 | 11 (55%) | $3.15 | $2.60 |
| Riprap, sand-cement bags | 0530-1100 | CY | 17 | 11 (65%) | $909.95 | $992.50 |
| Concrete class II, approach slabs | 0400-2-10 | CY | 16 | 7 (44%) | $986.45 | $700.00 |
| Regular excavation | 0120-1 | CY | 19 | 6 (32%) | $20.78 | $25.47 |
| Floating turbidity barrier | 0104-11 | LF | 18 | 6 (33%) | $21.17 | $15.92 |
| Plain neoprene bearing pads | 0400-148 | CF | 15 | 5 (33%) | $2,300.00 | $1,400.00 |
| Junction box, furnish & install, embedded | 0635-3-13 | EACH | 14 | 5 (36%) | $883.21 | $822.50 |
| Conduit, furnish & install, embedded concrete barriers and traffic railings | 0630-2-16 | LF | 14 | 5 (36%) | $20.50 | $15.70 |
| Concrete class IV, bridge substructure | 0400-4-5 | CY | 14 | 5 (36%) | $2,597.70 | $1,700.00 |
| Bedding stone | 0530-74 | TN | 25 | 4 (16%) | $155.00 | $155.00 |
| Type III barricade | 0102-115 | ED | 17 | 4 (24%) | $0.55 | $0.34 |
| Staked turbidity barrier- nylon reinforced PVC | 0104-12 | LF | 12 | 4 (33%) | $15.07 | $8.10 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Murphree Bridge Corporation | 15 | 11 of 15 |
| Superior Construction Company Southeast, LLC | 9 | 1 of 9 |
| Anderson Columbia Co., Inc. | 8 | 4 of 8 |
| F & W Construction Company, Inc. | 7 | 6 of 7 |
| Southern Road & Bridge, LLC | 3 | 0 of 3 |
| RBM Contracting Services, LLC | 2 | 2 of 2 |
| GDB-US Constructors, Inc. | 1 | 0 of 1 |
| Vecellio & Grogan, Inc. | 1 | 1 of 1 |
| Tic - the Industrial Company | 1 | 0 of 1 |
| Coxwell, J.B. Contracting, Inc. | 1 | 0 of 1 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 30 SEP 2026 | T1944 | District 1 | HOMESTEAD AVE OVER MARSH CREEK, BRIDGE NO 074026 | 8 of 8 | $1,895,597 | +82% |
| 30 SEP 2026 | T3908 | District 3 | SCOTT RD OVER ECONFINA CREEK, BRIDGE NO 464423 | 3 of 5 | $2,716,899 | +3.0% |
| 30 SEP 2026 | T3937 | District 3 | CR 278 (PEACOCK BRIDGE RD) OVER CHIPOLA RIVER, BRIDGE NO 530026 | 3 of 4 | $9,561,904 | +27% |
| 29 JUL 2026 | T3920 | District 3 | CR 65 (ROPING RD) OVER BEE BRANCH, BRIDGE NO 524178 | 3 of 6 | $968,686 | +1.0% |
| 10 JUN 2026 | T3952 | District 3 | CR 372 (SURF RD) OVER OTTER CREEK RISE, BRIDGE NO 59069 | 1 of 2 | $11,973,993 | Low, 0.0% under the second |
| 10 JUN 2026 | T3981 | District 3 | CR 268 (HIGH BRIDGE RD) OVER LITTLE RIVER, BRIDGE NO 504159 | 3 of 3 | $8,953,734 | +36% |
| 25 MAR 2026 | T3939 | District 3 | CR 173 (BETHEL RD) OVER GUM CREEK NO 2, BRIDGE NO 610026 | 1 of 3 | $1,234,568 | Low, 33% under the second |
| 25 MAR 2026 | T3951 | District 3 | SR 20 OVER ECONFINA CREEK, BRIDGE NO 460037 AND 460034 | 1 of 4 | $14,753,181 | Low, 0.0% under the second |
| 25 FEB 2026 | T3928 | District 3 | SCOTTS FERRY RD OVER BEAR CREEK, BRIDGE NO 464419 | 3 of 6 | $6,491,062 | +16% |
| 28 JAN 2026 | T3929 | District 3 | CR 274 OVER TENMILE CREEK BRIDGE NO. 470035 | 5 of 7 | $8,479,634 | +47% |
| 28 JAN 2026 | T3954 | District 3 | KLONDIKE RD OVER UNNAMED BRANCH BRIDGE NO 484060 | 3 of 3 | $3,505,088 | +31% |
| 03 DEC 2025 | T2A53 | District 2 | SR 5A (SR A1A / AVENIDA MENENDEZ) FROM BRIDGE OF LIONS TO... | 2 of 8 | $24,305,013 | +22% |
| 30 APR 2025 | T3879 | District 3 | HOWELL WILLIAMS RD OVER TEN MILE CREEK, BRIDGE NO 524150 | 3 of 3 | $2,650,523 | +18% |
| 26 FEB 2025 | T2A16 | District 2 | SR 55 (US 221) AT TWO PINES CREEK BRIDGE NO.380011 AND.... | 4 of 5 | $18,771,238 | +36% |
| 12 JUN 2024 | T3809 | District 3 | CR 257A OVER AUCILLA RIVER, BRIDGE NO 544061 | 1 of 2 | $6,871,371 | Low, 2.0% under the second |
| 28 FEB 2024 | T3851 | District 3 | INTERSTATE CIR OVER EIGHTMILE CREEK, BRIDGE NO 484071 | 2 of 2 | $3,270,242 | +3.0% |
| 14 JUN 2023 | T3791 | District 3 | ROBBINS BRIDGE ROAD | 2 of 2 | $2,196,993 | +5.0% |
| 26 APR 2023 | T3792 | District 3 | BUDDY RD | 2 of 3 | $1,601,275 | +28% |
| 26 OCT 2022 | T3774 | District 3 | TRAM RD | 3 of 5 | $3,131,770 | +33% |
How this record was read
FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
- Every bid counted here matched its published total to within one dollar; FDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.