RJ Gorman Contracting LLC: FDOT bid record

RJ Gorman Contracting LLC submitted 19 bids on Florida DOT contracts in the data, from 26 OCT 2022 to 30 SEP 2026, and was the low bidder on 4 of them (21%). When it was not low, its total sat a median +27% above the low bid.

Owner
Florida DOT
Low bid volume
$34,833,112
Latest bid
30 SEP 2026
Data through
28 OCT 2026
19Bids
4Low bids
21Win rate, percent
+27%Median gap to the low bid when not low, 15 bids

By year

YearBidsLow bidsWin rate
2022100%
2023200%
20242150%
2025300%
202611327%
RJ Gorman Contracting LLC, FDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
District 316425%
District 2200%
District 1100%
RJ Gorman Contracting LLC, FDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Sediment barrier0104-10-3LF2011 (55%)$3.15$2.60
Riprap, sand-cement bags0530-1100CY1711 (65%)$909.95$992.50
Concrete class II, approach slabs0400-2-10CY167 (44%)$986.45$700.00
Regular excavation0120-1CY196 (32%)$20.78$25.47
Floating turbidity barrier0104-11LF186 (33%)$21.17$15.92
Plain neoprene bearing pads0400-148CF155 (33%)$2,300.00$1,400.00
Junction box, furnish & install, embedded0635-3-13EACH145 (36%)$883.21$822.50
Conduit, furnish & install, embedded concrete barriers and traffic railings0630-2-16LF145 (36%)$20.50$15.70
Concrete class IV, bridge substructure0400-4-5CY145 (36%)$2,597.70$1,700.00
Bedding stone0530-74TN254 (16%)$155.00$155.00
Type III barricade0102-115ED174 (24%)$0.55$0.34
Staked turbidity barrier- nylon reinforced PVC0104-12LF124 (33%)$15.07$8.10
RJ Gorman Contracting LLC, FDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

FirmContracts in commonThat firm ranked ahead
Murphree Bridge Corporation1511 of 15
Superior Construction Company Southeast, LLC91 of 9
Anderson Columbia Co., Inc.84 of 8
F & W Construction Company, Inc.76 of 7
Southern Road & Bridge, LLC30 of 3
RBM Contracting Services, LLC22 of 2
GDB-US Constructors, Inc.10 of 1
Vecellio & Grogan, Inc.11 of 1
Tic - the Industrial Company10 of 1
Coxwell, J.B. Contracting, Inc.10 of 1
RJ Gorman Contracting LLC, FDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
30 SEP 2026T1944District 1HOMESTEAD AVE OVER MARSH CREEK, BRIDGE NO 0740268 of 8$1,895,597+82%
30 SEP 2026T3908District 3SCOTT RD OVER ECONFINA CREEK, BRIDGE NO 4644233 of 5$2,716,899+3.0%
30 SEP 2026T3937District 3CR 278 (PEACOCK BRIDGE RD) OVER CHIPOLA RIVER, BRIDGE NO 5300263 of 4$9,561,904+27%
29 JUL 2026T3920District 3CR 65 (ROPING RD) OVER BEE BRANCH, BRIDGE NO 5241783 of 6$968,686+1.0%
10 JUN 2026T3952District 3CR 372 (SURF RD) OVER OTTER CREEK RISE, BRIDGE NO 590691 of 2$11,973,993Low, 0.0% under the second
10 JUN 2026T3981District 3CR 268 (HIGH BRIDGE RD) OVER LITTLE RIVER, BRIDGE NO 5041593 of 3$8,953,734+36%
25 MAR 2026T3939District 3CR 173 (BETHEL RD) OVER GUM CREEK NO 2, BRIDGE NO 6100261 of 3$1,234,568Low, 33% under the second
25 MAR 2026T3951District 3SR 20 OVER ECONFINA CREEK, BRIDGE NO 460037 AND 4600341 of 4$14,753,181Low, 0.0% under the second
25 FEB 2026T3928District 3SCOTTS FERRY RD OVER BEAR CREEK, BRIDGE NO 4644193 of 6$6,491,062+16%
28 JAN 2026T3929District 3CR 274 OVER TENMILE CREEK BRIDGE NO. 4700355 of 7$8,479,634+47%
28 JAN 2026T3954District 3KLONDIKE RD OVER UNNAMED BRANCH BRIDGE NO 4840603 of 3$3,505,088+31%
03 DEC 2025T2A53District 2SR 5A (SR A1A / AVENIDA MENENDEZ) FROM BRIDGE OF LIONS TO...2 of 8$24,305,013+22%
30 APR 2025T3879District 3HOWELL WILLIAMS RD OVER TEN MILE CREEK, BRIDGE NO 5241503 of 3$2,650,523+18%
26 FEB 2025T2A16District 2SR 55 (US 221) AT TWO PINES CREEK BRIDGE NO.380011 AND....4 of 5$18,771,238+36%
12 JUN 2024T3809District 3CR 257A OVER AUCILLA RIVER, BRIDGE NO 5440611 of 2$6,871,371Low, 2.0% under the second
28 FEB 2024T3851District 3INTERSTATE CIR OVER EIGHTMILE CREEK, BRIDGE NO 4840712 of 2$3,270,242+3.0%
14 JUN 2023T3791District 3ROBBINS BRIDGE ROAD2 of 2$2,196,993+5.0%
26 APR 2023T3792District 3BUDDY RD2 of 3$1,601,275+28%
26 OCT 2022T3774District 3TRAM RD3 of 5$3,131,770+33%
RJ Gorman Contracting LLC: latest FDOT bids in the data

How this record was read

FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.

  • Every bid counted here matched its published total to within one dollar; FDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way