FDOT contract T2A16 bid tabulation
SR 55 (US 221) AT TWO PINES CREEK BRIDGE NO.380011 AND.... Let by Florida DOT on February 26, 2025, Taylor, District 2. 5 bids received; low bid $13,809,124 by Anderson Columbia Co., Inc..
- Owner
- Florida DOT
- Letting
- 26 FEB 2025
- Pay items
- 123
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Anderson Columbia Co., Inc. | $13,809,124 | Low |
| 2 | Murphree Bridge Corporation | $14,508,274 | +5.0% |
| 3 | Superior Construction Company Southeast, LLC | $16,950,241 | +23% |
| 4 | RJ Gorman Contracting LLC | $18,771,238 | +36% |
| 5 | Kiewit Infrastructure South Co. | $20,541,236 | +49% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Anderson Columbia Co., Inc. | 2. Murphree Bridge Corporation | 3. Superior Construction Company Southeast, LLC | 4. RJ Gorman Contracting LLC | 5. Kiewit Infrastructure South Co. |
|---|---|---|---|---|---|---|---|---|
| 0005 | Removal of existing structures/bridges (0110-3) | SF | 1 | $201,000 | $68,100 | $330,500 | $65,000 | $303,447 |
| 0010 | Removal of existing structures/bridges (0110-3) | SF | 1 | $250,000 | $91,200 | $341,585 | $80,000 | $481,101 |
| 0015 | Grout pipe installation (0173-76) | LF | 6,215 | $40.00 | $23.60 | $70.00 | $175.00 | $27.50 |
| 0020 | Subsurface pressure sand cement (0173-77-1) | CY | 331 | $425.00 | $315.00 | $1,000.00 | $475.00 | $329.00 |
| 0025 | Conc class II, bridge superstructure (0400-2-4) | CY | 443.80 | $1,550.00 | $1,850.00 | $2,000.00 | $2,200.00 | $2,743.12 |
| 0030 | Concrete class II, approach slabs (0400-2-10) | CY | 192 | $925.00 | $1,175.00 | $950.00 | $950.00 | $996.04 |
| 0035 | Concrete class IV, bridge substructure (0400-4-5) | CY | 174.20 | $2,100.00 | $2,250.00 | $3,000.00 | $1,650.00 | $4,428.78 |
| 0040 | Bridge deck grooving (0400-7-1) | SY | 889 | $25.00 | $5.00 | $17.00 | $17.00 | $153.32 |
| 0045 | Bridge deck planing (0400-9-1) | SY | 511 | $25.00 | $10.00 | $25.00 | $28.00 | $23.77 |
| 0050 | Plain neoprene bearing pads (0400-148) | CF | 18.70 | $2,500.00 | $1,300.00 | $2,000.00 | $2,800.00 | $1,687.16 |
| 0055 | Reinforcing steel - bridge superstructure (0415-1-4) | LB | 146,800 | $2.00 | $1.80 | $1.25 | $2.90 | $1.82 |
| 0060 | Reinforcing steel- bridge substructure (0415-1-5) | LB | 16,284 | $2.50 | $1.80 | $1.25 | $2.90 | $1.82 |
| 0065 | Reinforcing steel- approach slabs (0415-1-9) | LB | 37,913 | $2.50 | $1.80 | $1.25 | $2.98 | $1.82 |
| 0070 | Preformed pile holes, 24" to 29" drill/punch size (0455-15-14) | LF | 1,386 | $200.00 | $223.50 | $200.00 | $165.00 | $206.07 |
| 0075 | Pile inspection, driven pile (0455-20-1) | EACH | 59 | $1,500.00 | $2,685.00 | $2,000.00 | $2,900.00 | $1,128.65 |
| 0080 | Steel piling, 24" dia. pipe (0455-35-22) | LF | 2,613 | $388.00 | $355.00 | $289.00 | $397.50 | $515.58 |
| 0085 | Pile redrive (0455-115) | EACH | 8 | $3,500.00 | $4,115.00 | $2,300.00 | $4,865.00 | $3,089.22 |
| 0090 | Pile point protection, 24" round (0455-120-7) | EACH | 59 | $1,500.00 | $2,750.00 | $1,150.00 | $1,150.00 | $1,520.18 |
| 0095 | Load test (dynamic), data collection and analysis (0455-137) | EACH | 59 | $2,850.00 | $1,650.00 | $1,175.00 | $2,500.00 | $1,410.84 |
| 0100 | Load test (dynamic), test (0455-137-2) | EACH | 8 | $5,000.00 | $1,650.00 | $1,300.00 | $8,500.00 | $6,583.77 |
| 0105 | Test piles - steel, 24" dia pipe (0455-144-22) | LF | 690 | $488.00 | $525.00 | $550.00 | $480.00 | $673.39 |
| 0110 | Bridge deck expansion joint, construction, F&I poured joint with backer rod (0458-1-11) | LF | 175 | $99.00 | $95.00 | $45.00 | $138.00 | $134.16 |
| 0115 | Concrete traffic railing- 36" single-slope (0521-5-13) | LF | 641 | $199.00 | $150.00 | $140.00 | $245.00 | $167.23 |
| 0120 | Riprap, sand-cement bags (0530-1100) | CY | 55.70 | $700.00 | $800.00 | $900.00 | $1,100.00 | $812.74 |
| 0125 | Riprap- rubble, bank and shore (0530-3-3) | TN | 1,610.10 | $175.00 | $132.00 | $150.00 | $145.00 | $275.54 |
| 0130 | Bedding stone (0530-74) | TN | 621 | $200.00 | $139.50 | $170.00 | $140.00 | $176.37 |
| 0135 | Conduit, furnish & install, embedded concrete barriers and traffic railings (0630-2-16) | LF | 1,923 | $20.00 | $16.00 | $43.00 | $25.00 | $27.50 |
| 0140 | Junction box, furnish & install, embedded (0635-3-13) | EACH | 12 | $900.00 | $700.00 | $1,200.00 | $950.00 | $440.00 |
| 0145 | Junction box, furnish & install, embedded structures (0635-3-13) | EACH | 12 | $900.00 | $700.00 | $1,200.00 | $950.00 | $440.00 |
| 0150 | Mobilization (0101-1) | LS | 1 | $655,000 | $842,501 | $848,300 | $750,000 | $1,030,851 |
| 0155 | Mobilization (0101-1) | LS | 1 | $661,000 | $797,006 | $848,300 | $700,400 | $1,030,851 |
| 0160 | Maintenance of traffic (0102-1) | DA | 1 | $94,999 | $161,750 | $108,000 | $41,750 | $81,000 |
| 0165 | Maintenance of traffic (0102-1) | DA | 1 | $99,999 | $161,750 | $89,000 | $41,750 | $130,000 |
| 0170 | Special detour- temporary pavement (0102-2200) | SY | 1 | $225,000 | $199,500 | $221,000 | $376,500 | $480,000 |
| 0175 | Special detour- temporary pavement (0102-2200) | SY | 1 | $175,000 | $185,000 | $144,000 | $282,000 | $300,000 |
| 0180 | Special detour- temporary earthwork/base (0102-2300) | CY | 1 | $920,000 | $925,000 | $512,000 | $1,668,000 | $1,400,000 |
| 0185 | Special detour- temporary earthwork/base (0102-2300) | CY | 1 | $720,000 | $498,000 | $638,000 | $1,690,000 | $1,100,000 |
| 0190 | Special detour- temporary bridge (0102-2400) | EACH | 1 | $425,000 | $955,100 | $1,063,800 | $475,000 | $1,350,000 |
| 0195 | Special detour- temporary bridge (0102-2400) | EACH | 1 | $825,000 | $1,297,835 | $1,475,669 | $789,000 | $2,200,000 |
| 0200 | Commercial material for temporary driveway maintenance (0102-3) | CY | 86.60 | $99.00 | $75.00 | $70.00 | $165.00 | $212.40 |
| 0205 | Traffic control officer (0102-14) | HR | 140 | $75.00 | $110.00 | $83.00 | $140.00 | $103.46 |
| 0210 | Work zone sign (0102-60) | ED | 39,229 | $0.31 | $0.30 | $0.20 | $0.45 | $0.28 |
| 0215 | Business sign (0102-61) | EACH | 2 | $500.00 | $200.00 | $30.00 | $300.00 | $188.11 |
| 0220 | Temporary barrier, F&I, anchored (0102-71-15) | LF | 2,300 | $35.00 | $31.00 | $46.50 | $45.00 | $29.16 |
| 0225 | Temporary barrier, F&I, free standing (0102-71-16) | LF | 359 | $27.00 | $25.00 | $23.00 | $36.00 | $23.51 |
| 0230 | Temporary barrier, relocate, anchored (0102-71-25) | LF | 2,300 | $27.00 | $25.00 | $16.50 | $45.00 | $32.92 |
| 0235 | Temporary barrier, relocate, free standing (0102-71-26) | LF | 347 | $22.00 | $20.00 | $8.50 | $27.60 | $18.81 |
| 0240 | Temporary guardrail (0102-73) | LF | 1,484 | $11.55 | $10.00 | $25.00 | $40.00 | $25.40 |
| 0245 | Channelizing device- types I, II, VP, drum, or LCD (0102-74-1) | ED | 82,447 | $0.11 | $0.10 | $0.10 | $0.20 | $0.09 |
| 0250 | Temporary crash cushion, redirective option (0102-89-1) | LO | 8 | $1,700.00 | $900.00 | $4,500.00 | $1,450.00 | $3,563.21 |
| 0255 | Portable changeable message sign, temporary (0102-99) | ED | 2,782 | $14.00 | $12.50 | $9.00 | $18.00 | $11.76 |
| 0260 | Type III barricade (0102-115) | ED | 7,364 | $0.32 | $0.30 | $0.25 | $0.45 | $0.28 |
| 0265 | Portable regulatory, sign (0102-150-1) | ED | 900 | $6.00 | $5.00 | $4.50 | $8.00 | $4.70 |
| 0270 | Radar speed display unit (0102-150-2) | ED | 900 | $6.00 | $5.00 | $5.00 | $8.00 | $4.70 |
| 0275 | Temporary raised rumble per day, includes all sets and relocations (0102-909) | DA | 1,308 | $25.00 | $30.00 | $1.00 | $41.40 | $28.22 |
| 0280 | Removable tape, white, solid 6" (0102-913-21) | GM | 0.07 | $14,000 | $15,000 | $15,000 | $22,000 | $14,322 |
| 0285 | Removable tape, yellow, solid, (0102-913-31) | GM | 0.07 | $14,000 | $15,000 | $15,000 | $22,000 | $14,108 |
| 0290 | Sediment barrier (0104-10-3) | LF | 10,868 | $5.00 | $3.50 | $10.00 | $3.00 | $6.58 |
| 0295 | Floating turbidity barrier (0104-11) | LF | 630 | $35.00 | $25.00 | $45.00 | $21.00 | $9.41 |
| 0300 | Soil tracking prevention device (0104-15) | EACH | 6 | $2,500.00 | $3,800.00 | $4,500.00 | $8,500.00 | $16,070 |
| 0305 | Litter removal (0107-1) | ACRE | 218.07 | $155.00 | $250.00 | $175.00 | $80.00 | $70.54 |
| 0310 | Mowing (0107-2) | ACRE | 196.61 | $155.00 | $350.00 | $175.00 | $100.00 | $94.06 |
| 0315 | Monitor existing structures- inspection and settlement monitoring (0108-1) | LS | 1 | $15,000 | $14,200 | $3,500.00 | $25,000 | $14,108 |
| 0320 | Monitor existing structures- inspection and settlement monitoring (0108-1) | LS | 1 | $19,000 | $14,200 | $7,000.00 | $25,000 | $14,108 |
| 0325 | Monitor existing structures- vibration monitoring (0108-2) | LS | 1 | $16,000 | $11,700 | $3,800.00 | $25,000 | $22,173 |
| 0330 | Monitor existing structures- vibration monitoring (0108-2) | LS | 1 | $16,000 | $11,700 | $5,400.00 | $25,000 | $26,312 |
| 0335 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $200,000 | $220,000 | $944,000 | $145,000 | $195,780 |
| 0340 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $265,000 | $245,000 | $944,000 | $155,000 | $183,226 |
| 0345 | Regular excavation (0120-1) | CY | 4,985.60 | $16.00 | $15.50 | $20.00 | $56.00 | $51.58 |
| 0350 | Embankment (0120-6) | CY | 7,191.90 | $37.00 | $22.70 | $30.00 | $59.30 | $35.44 |
| 0355 | Type B stabilization (0160-4) | SY | 15,420 | $10.30 | $9.50 | $8.50 | $9.95 | $34.98 |
| 0360 | Optional base, base group 01 (0285-701) | SY | 3,260 | $24.00 | $28.00 | $25.00 | $31.25 | $21.45 |
| 0365 | Optional base, base group 06 (0285-706) | SY | 7,147 | $38.00 | $34.00 | $35.00 | $79.50 | $34.69 |
| 0370 | Turnout base- optional materials (0286-1) | SY | 411 | $49.00 | $95.00 | $155.00 | $204.00 | $55.01 |
| 0375 | Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6) | SY | 9,466 | $5.48 | $4.00 | $2.50 | $5.00 | $1.54 |
| 0380 | Milling existing asphalt pavement, 2 1/2" avg depth (0327-70-8) | SY | 799 | $6.75 | $4.00 | $5.00 | $5.50 | $1.00 |
| 0385 | Superpave asphaltic conc, traffic C (0334-1-13) | TN | 791 | $210.00 | $183.00 | $185.00 | $290.00 | $189.11 |
| 0390 | Superpave asphaltic concrete, traffic C, high polymer (0334-1-57) | TN | 594 | $260.00 | $285.00 | $200.00 | $295.00 | $218.32 |
| 0395 | Asphalt concrete friction course,traffic C, FC-12.5, high polymer (0337-7-93) | TN | 1,728.80 | $210.00 | $265.00 | $225.00 | $305.00 | $211.14 |
| 0400 | Miscellaneous asphalt (0339-1) | TN | 111.80 | $499.00 | $325.00 | $400.00 | $650.00 | $185.20 |
| 0405 | Inlets, gutter, type S, <10' (0425-1701) | EACH | 16 | $8,500.00 | $8,280.00 | $9,250.00 | $23,000 | $17,367 |
| 0410 | Pipe culvert, optional material, round, 18"SD (0430-174118) | LF | 76 | $135.00 | $244.00 | $200.00 | $330.00 | $296.65 |
| 0415 | Pipe culvert, optional material, round, 30"SD (0430-174130) | LF | 54 | $220.00 | $300.00 | $360.00 | $558.00 | $397.12 |
| 0420 | Pipe culvert,optional material,round, 18"S/CD (0430-175118) | LF | 486 | $120.00 | $257.00 | $225.00 | $350.00 | $293.75 |
| 0425 | Pipe culvert,optional material,round, 24"S/CD (0430-175124) | LF | 66 | $175.00 | $300.00 | $265.00 | $612.00 | $353.66 |
| 0430 | Straight concrete endwalls, single, 0 degrees, round (0430-524100) | EACH | 2 | $8,000.00 | $4,000.00 | $7,500.00 | $25,150 | $13,746 |
| 0435 | Mitered end section, optional round, 18" CD (0430-982125) | EACH | 5 | $2,200.00 | $3,874.00 | $4,700.00 | $4,400.00 | $6,180.72 |
| 0440 | Mitered end section, optional round, 18" SD (0430-984125) | EACH | 4 | $2,200.00 | $4,765.00 | $4,700.00 | $4,400.00 | $6,175.85 |
| 0445 | Mitered end section , optional round, 30" SD (0430-984133) | EACH | 2 | $4,200.00 | $6,000.00 | $7,500.00 | $5,370.00 | $7,860.25 |
| 0450 | Shoulder gutter- concrete (0520-6) | LF | 1,874 | $81.00 | $36.00 | $75.00 | $235.00 | $69.19 |
| 0455 | Riprap, rubble, F&I, ditch lining (0530-3-4) | TN | 21.70 | $700.00 | $265.00 | $155.00 | $650.00 | $480.44 |
| 0460 | Bedding stone (0530-74) | TN | 15.40 | $900.00 | $195.00 | $265.00 | $650.00 | $176.37 |
| 0465 | Guardrail -roadway, general (0536-1-1) | LF | 3,269 | $28.00 | $25.00 | $22.50 | $39.50 | $38.86 |
| 0470 | Special guardrail post- post for shallow mount (0536-7-3) | EACH | 12 | $145.00 | $125.00 | $49.00 | $197.00 | $117.57 |
| 0475 | Guardrail transition to rigid barrier, F&I- index 536- 001, approach TL-3 (0536-8112) | EACH | 8 | $3,450.00 | $3,000.00 | $2,750.00 | $4,720.00 | $2,821.62 |
| 0480 | Guardrail removal (0536-73) | LF | 1,494 | $16.00 | $2.00 | $1.00 | $3.20 | $1.88 |
| 0485 | Guardrail end treatment- parallel approach terminal (0536-85-24) | EACH | 8 | $3,400.00 | $3,000.00 | $2,650.00 | $4,740.00 | $2,821.62 |
| 0490 | Guardrail end treatment- type CRT (0536-85-26) | EACH | 4 | $4,500.00 | $4,000.00 | $3,850.00 | $6,290.00 | $3,762.16 |
| 0495 | Performance turf, sod (0570-1-2) | SY | 67,223 | $2.55 | $2.85 | $6.25 | $4.50 | $1.93 |
| 0500 | Plastic erosion mat, turf reinforced mat, type 1 (0571-1-11) | SY | 2,216 | $3.00 | $8.00 | $8.00 | $3.55 | $17.84 |
| 0505 | Raised pavement marker, type B (0706-1-3) | EACH | 2,336 | $5.75 | $6.00 | $6.00 | $9.50 | $5.64 |
| 0510 | Painted pavement markings, standard, white, solid, 6" (0710-11101) | GM | 2.96 | $2,000.00 | $2,500.00 | $2,500.00 | $3,930.00 | $2,351.34 |
| 0515 | Painted pavement markings, standard, white, solid for stop line or crosswalk, 24" (0710-11125) | LF | 45 | $5.75 | $6.00 | $6.00 | $9.50 | $5.64 |
| 0520 | Painted pavement markings, standard, white, 2-4 dotted guideline/ 6-10 dotted 6" (0710-11141) | GM | 0.00 | $2,800.00 | $1,200.00 | $1,200.00 | $1,890.00 | $1,128.65 |
| 0525 | Painted pavement markings, standard, yellow, solid, 6" (0710-11201) | GM | 2.61 | $2,000.00 | $2,500.00 | $2,500.00 | $3,930.00 | $2,351.34 |
| 0530 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $74,700 | $74,700 | $74,700 | $74,700 | $74,700 |
| 0535 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $75,300 | $75,300 | $75,300 | $75,300 | $75,300 |
| 0540 | Ground-in rumble strips, 8" sinusoidal (0546-72-3) | GM | 2.83 | $1,999.00 | $5,000.00 | $2,500.00 | $3,165.00 | $11,533 |
| 0545 | Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111) | EACH | 3 | $600.00 | $525.00 | $525.00 | $825.00 | $493.78 |
| 0550 | Single column ground sign assembly, relocate (0700-1500) | EACH | 5 | $150.00 | $100.00 | $100.00 | $158.00 | $94.06 |
| 0555 | Single column ground sign assembly, remove (0700-1600) | EACH | 8 | $100.00 | $50.00 | $50.00 | $79.00 | $47.03 |
| 0560 | Sign panel, remove, UP to 12 SF (0700-3601) | EACH | 1 | $100.00 | $50.00 | $50.00 | $79.00 | $47.03 |
| 0565 | Object marker, type 1 (0705-10-1) | EACH | 6 | $325.00 | $285.00 | $285.00 | $450.00 | $268.05 |
| 0570 | Object marker, type 3 (0705-10-3) | EACH | 4 | $325.00 | $285.00 | $285.00 | $450.00 | $268.05 |
| 0575 | Raised pavement marker, type B (0706-1-3) | EACH | 256 | $5.75 | $6.00 | $6.00 | $9.50 | $5.64 |
| 0580 | Painted pavement markings, surface (0710-90) | LS | 1 | $7,500.00 | $5,000.00 | $5,000.00 | $7,860.00 | $4,702.69 |
| 0585 | Painted pavement markings, surface (0710-90) | LS | 1 | $7,500.00 | $5,000.00 | $5,000.00 | $7,860.00 | $4,702.69 |
| 0590 | Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125) | LF | 14 | $17.00 | $15.00 | $15.00 | $23.60 | $14.11 |
| 0595 | Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101) | GM | 2.11 | $7,150.00 | $7,500.00 | $7,500.00 | $11,785 | $7,054.03 |
| 0600 | Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201) | GM | 1.26 | $7,000.00 | $7,500.00 | $7,500.00 | $11,785 | $7,054.03 |
| 0605 | Thermoplastic, standard-other surfaces, yellow, skip, 6" (0711-16231) | GM | 0.60 | $3,000.00 | $4,500.00 | $4,500.00 | $7,100.00 | $4,837.06 |
| 0610 | Permanent tape, white, solid, 6" for concrete bridges (0713-103101) | GM | 0.08 | $50,000 | $40,000 | $40,000 | $62,860 | $37,622 |
| 0615 | Permanent tape, yellow, solid, for concrete bridges (0713-103201) | GM | 0.08 | $50,000 | $40,000 | $40,000 | $62,860 | $37,622 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
Every contract let that day: FDOT letting of February 26, 2025. Compiled by Mirage Metrics.