Kiewit Infrastructure South Co.: FDOT bid record

Kiewit Infrastructure South Co. submitted 32 bids on Florida DOT contracts in the data, from 28 FEB 2018 to 30 APR 2025, and was the low bidder on 3 of them (9%). When it was not low, its total sat a median +34% above the low bid.

Owner
Florida DOT
Low bid volume
$23,186,660
Latest bid
30 APR 2025
Data through
28 OCT 2026
32Bids
3Low bids
9Win rate, percent
+34%Median gap to the low bid when not low, 29 bids

By year

YearBidsLow bidsWin rate
2018400%
20192150%
2020400%
202112217%
2022500%
2023100%
2024100%
2025300%
Kiewit Infrastructure South Co., FDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
District 210220%
District 3600%
District 1500%
District 4500%
District 63133%
District 7200%
District 5100%
Kiewit Infrastructure South Co., FDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Floating turbidity barrier0104-11LF2313 (57%)$15.00$15.92
Performance turf, sod0570-1-2SY2812 (43%)$3.88$5.00
Sediment barrier0104-10-3LF2910 (34%)$3.00$2.60
Disputes review board, meeting- DO not bid0999-20-1DA99 (100%)$3,900.00$3,900.00
Disputes review board, hearing- DO not bid0999-20-2EACH99 (100%)$4,500.00$4,500.00
Litter removal0107-1ACRE258 (32%)$61.20$52.98
Mowing0107-2ACRE257 (28%)$94.06$80.65
Painted pavement markings, standard, white, solid for stop line or crosswalk, 24"0710-11125LF217 (33%)$2.31$2.00
Bridge deck expansion joint, construction, F&I poured joint with backer rod0458-1-11LF217 (33%)$54.00$65.00
Painted pavement markings, standard, yellow, solid, 6"0710-11201GM236 (26%)$1,500.00$1,350.00
Regular excavation0120-1CY295 (17%)$25.00$25.47
Bedding stone0530-74TN275 (19%)$150.00$155.00
Kiewit Infrastructure South Co., FDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Kiewit Infrastructure South Co., FDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
30 APR 2025T2A28District 2SR 5A (US 1/KING ST) OVER SAN SEBASTIAN RIVER BRIDGE NO...7 of 8$16,903,663+26%
26 FEB 2025T2A16District 2SR 55 (US 221) AT TWO PINES CREEK BRIDGE NO.380011 AND....5 of 5$20,541,236+49%
29 JAN 2025T4705District 4SR 838 (SUNRISE BLVD) FROM SR 9 (I-95) TO SR 5 (US 1)5 of 5$85,212,452+54%
28 FEB 2024T2984District 2SR 8 (I-10) AND SR 10 (US 90) OVER SUWANEE RIVER RELIEF AND2 of 4$10,092,366+6.0%
22 FEB 2023T4640District 4CR 6124 of 4$7,969,224+15%
16 NOV 2022T2878District 2SR 8 (I-10)2 of 3$14,677,379+57%
16 NOV 2022T2902District 2180TH ST3 of 3$5,526,647+54%
23 FEB 2022T5743District 5BARRACUDA BLVD AND BR NO 7957004 of 5$6,491,039+48%
26 JAN 2022T4595District 4SR 817 (UNIVERSITY DR)9 of 9$15,105,750+34%
12 JAN 2022T2863District 2SR 5 (US 17/MAIN ST)2 of 3$14,824,462+6.0%
08 DEC 2021T3720District 3CR 2593 of 3$4,923,410+60%
27 OCT 2021T2819District 2SR 5 (US 1)4 of 4$7,375,363+58%
28 JUL 2021T1780District 1LOST TRAIL2 of 3$1,994,686+24%
09 JUN 2021T3705District 3SR 10 (US 90)4 of 5$28,220,946+30%
09 JUN 2021T3711District 3SR 10 (US 90)5 of 5$11,952,155+46%
09 JUN 2021T3728District 3SR 225 of 5$7,884,802+43%
09 JUN 2021T4564District 4SR 5 (US 1) AND SR 811 (ALT A1A)7 of 8$163,271,188+34%
26 MAY 2021T2810District 2SR 117 (NORWOOD AVE)1 of 2$5,681,190Low, 22% under the second
26 MAY 2021T4582District 4SR 5 (US 1)2 of 3$36,522,665+28%
26 MAY 2021T7472District 7SR 93 (I-275)6 of 6$115,437,912+35%
27 JAN 2021T2790District 2SR 5 (US 1)1 of 3$15,444,874Low, 2.0% under the second
27 JAN 2021T7458District 7SR 55 (US 19)3 of 5$9,128,030+15%
02 DEC 2020T3735District 3SR 30 (US 98)4 of 6$6,742,035+21%
18 NOV 2020T3691District 3SR 289 (9TH AVE)4 of 4$5,886,534+38%
18 NOV 2020T1035District 1SR 400 (I-4)2 of 6$29,252,409+12%
Kiewit Infrastructure South Co.: latest FDOT bids in the data

How this record was read

FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.

  • Every bid counted here matched its published total to within one dollar; FDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy