FDOT contract T4705 bid tabulation
SR 838 (SUNRISE BLVD) FROM SR 9 (I-95) TO SR 5 (US 1). Let by Florida DOT on January 29, 2025, Broward, District 4. 5 bids received; low bid $55,449,488 by GLF Posillico JV.
- Owner
- Florida DOT
- Letting
- 29 JAN 2025
- Pay items
- 425
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | GLF Posillico JV | $55,449,488 | Low |
| 2 | Daniel O'Connell'S Sons | $57,169,909 | +3.0% |
| 3 | Mastec Civil LLC | $59,482,057 | +7.0% |
| 4 | Ohla USA Inc | $62,837,827 | +13% |
| 5 | Kiewit Infrastructure South Co. | $85,212,452 | +54% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. GLF Posillico JV | 2. Daniel O'Connell'S Sons | 3. Mastec Civil LLC | 4. Ohla USA Inc | 5. Kiewit Infrastructure South Co. |
|---|---|---|---|---|---|---|---|---|
| 0005 | Removal of existing structures/bridges 860126 (0110-3) | SF | 1 | $900,000 | $2,000,000 | $450,000 | $600,000 | $2,250,000 |
| 0010 | Removal of existing structures/bridges 860263 (0110-3) | SF | 1 | $205,000 | $40,000 | $75,000 | $400,000 | $1,000,000 |
| 0015 | Removal of existing structures/bridges 860264 (0110-3) | SF | 1 | $600,000 | $280,000 | $200,000 | $150,000 | $750,000 |
| 0020 | Conc class II, bridge superstructure (0400-2-4) | CY | 1,086 | $2,127.00 | $974.00 | $3,000.00 | $2,900.00 | $2,750.00 |
| 0025 | Concrete class II, approach slabs (0400-2-10) | CY | 112 | $1,482.00 | $695.00 | $1,400.00 | $1,100.00 | $1,750.00 |
| 0030 | Concrete class IV, bridge substructure (0400-4-5) | CY | 933 | $2,200.00 | $1,174.00 | $2,400.00 | $3,900.00 | $10,000 |
| 0035 | Concrete class IV, counterweight (0400-4-6) | CY | 129 | $1,143.00 | $841.00 | $1,300.00 | $180.00 | $2,000.00 |
| 0040 | Concrete class IV, mass, substructure (0400-4-25) | CY | 1,016 | $1,300.00 | $1,567.00 | $2,500.00 | $1,700.00 | $3,500.00 |
| 0045 | Bridge deck grooving (0400-7-1) | SY | 2,657 | $13.00 | $10.00 | $20.00 | $12.00 | $32.00 |
| 0050 | Composite neoprene pads (0400-147) | CF | 50 | $1,513.00 | $1,720.00 | $1,100.00 | $900.00 | $1,000.00 |
| 0055 | Reinforcing steel - bridge superstructure (0415-1-4) | LB | 244,777 | $1.45 | $1.20 | $1.40 | $1.50 | $1.25 |
| 0060 | Reinforcing steel- bridge substructure (0415-1-5) | LB | 464,474 | $1.57 | $1.30 | $1.40 | $1.50 | $1.25 |
| 0065 | Reinforcing steel- approach slabs (0415-1-9) | LB | 20,220 | $1.45 | $1.20 | $1.40 | $1.50 | $1.25 |
| 0070 | Prestressed beams, type II (0450-1-1) | LF | 807 | $462.00 | $541.00 | $410.00 | $550.00 | $510.00 |
| 0075 | Prest beams: florida-I beam 36" (0450-2-36) | LF | 2,192 | $498.50 | $490.00 | $350.00 | $400.00 | $525.00 |
| 0080 | Prest beams: florida-I beam 45" (0450-2-45) | LF | 684 | $596.00 | $546.00 | $410.00 | $580.00 | $635.00 |
| 0085 | Preformed pile holes, 15" to 17" drill/punch size (0455-15-11) | LF | 1,559 | $255.00 | $155.00 | $90.00 | $65.00 | $125.00 |
| 0090 | Preformed pile holes, 22" to 26" drill/punch size (0455-15-13) | LF | 7,902 | $42.00 | $215.00 | $82.00 | $65.00 | $125.00 |
| 0095 | Preformed pile holes casing, to 17" drill/punch size (0455-15-21) | LF | 160 | $477.50 | $123.00 | $30.00 | $90.00 | $250.00 |
| 0100 | Preformed pile holes casing, to 26" drill/punch size (0455-15-23) | LF | 1,157 | $124.00 | $155.00 | $30.00 | $90.00 | $400.00 |
| 0105 | Pile inspection, driven pile (0455-20-1) | EACH | 299 | $750.00 | $582.00 | $530.00 | $480.00 | $2,300.00 |
| 0110 | Prestressed concrete piling, SQ (0455-34-3) | LF | 8,093 | $276.50 | $289.00 | $200.00 | $280.00 | $600.00 |
| 0115 | Steel piling, HP 14 X 117 (0455-35-8) | LF | 3,155 | $326.50 | $546.00 | $375.00 | $475.00 | $260.00 |
| 0120 | Anchor bar, steel (0455-87) | EACH | 26 | $3,058.00 | $5,400.00 | $5,500.00 | $4,600.00 | $10,000 |
| 0125 | Pile redrive (0455-115) | EACH | 54 | $1,250.00 | $4,300.00 | $3,900.00 | $2,500.00 | $3,300.00 |
| 0130 | Sheet piling steel, temporary- critical (0455-133-2) | SF | 10,373 | $60.00 | $80.00 | $50.00 | $0.01 | $45.00 |
| 0135 | Sheet piling steel, F&I (0455-133-3) | SF | 11,257 | $76.00 | $90.00 | $78.00 | $70.00 | $110.00 |
| 0140 | Soldier pile wall, temporary- critical, steel H-piles with timber lagging (0455-133-10) | SF | 1,890 | $249.50 | $140.00 | $140.00 | $110.00 | $200.00 |
| 0145 | Load test (dynamic), data collection and analysis (0455-137) | EACH | 333 | $1,200.00 | $1,400.00 | $1,340.00 | $1,100.00 | $2,250.00 |
| 0150 | Load test (dynamic), test (0455-137-2) | EACH | 32 | $5,974.00 | $24,000 | $8,800.00 | $1,100.00 | $1,750.00 |
| 0155 | Test piles-prestressed concrete,18" SQ (0455-143-3) | LF | 2,265 | $316.00 | $120.00 | $400.00 | $300.00 | $300.00 |
| 0160 | Test piles - steel, HP 14 X 117 (0455-144-8) | LF | 405 | $293.00 | $400.00 | $575.00 | $550.00 | $345.00 |
| 0165 | Bridge deck expansion joint, construction, F&I poured joint with backer rod (0458-1-11) | LF | 807 | $127.50 | $165.00 | $140.00 | $55.00 | $70.00 |
| 0170 | Bridge deck expansion joint, rehabilitation, poured joint backer rod (0458-1-21) | LF | 1,796 | $186.00 | $56.00 | $110.00 | $75.00 | $100.00 |
| 0175 | Piles, polyethylene sheeting (0459-71) | SY | 160 | $11.25 | $10.00 | $20.00 | $12.00 | $53.00 |
| 0180 | Concrete traffic railing- 36" single-slope (0521-5-13) | LF | 1,564 | $265.00 | $150.00 | $156.00 | $125.00 | $110.00 |
| 0185 | Concrete parapet, pedestrian/bicycle, 27" height (0521-6-11) | LF | 1,035 | $124.00 | $140.00 | $125.00 | $120.00 | $92.00 |
| 0190 | Concrete slope pavement,non reinforced, 4" (0524-2-2) | SY | 312 | $122.00 | $90.00 | $300.00 | $300.00 | $225.00 |
| 0200 | Conduit, furnish & install, embedded concrete barriers and traffic railings (0630-2-16) | LF | 1,559 | $12.50 | $16.00 | $16.00 | $13.00 | $25.00 |
| 0201 | Junction box, furnish & install, embedded (0635-3-13) | EACH | 6 | $846.00 | $1,100.00 | $975.00 | $1,200.00 | $2,500.00 |
| 0205 | Mobilization (0101-1) | LS | 1 | $3,500,000 | $5,000,000 | $2,900,000 | $3,000,000 | $7,250,000 |
| 0210 | Mobilization (0101-1) | LS | 1 | $2,000,000 | $1.00 | $2,900,000 | $3,000,000 | $1,000,000 |
| 0215 | Maintenance of traffic (0102-1) | DA | 1 | $1,650,000 | $840,000 | $2,850,000 | $2,500,000 | $5,480,000 |
| 0220 | Maintenance of traffic (0102-1) | DA | 1 | $100,000 | $67,000 | $765,000 | $2,340,000 | $500,000 |
| 0225 | Special detour- temporary pavement (0102-2200) | SY | 1 | $103,950 | $140,000 | $300,000 | $0.01 | $100,000 |
| 0230 | Special detour- temporary earthwork/base (0102-2300) | CY | 1 | $25,000 | $4,000.00 | $350,000 | $0.01 | $75,000 |
| 0235 | Pedestrian or bicycle special detour (0102-4-1) | SY | 1 | $5,000.00 | $1,100.00 | $30,000 | $0.01 | $15,000 |
| 0240 | Pedestrian or bicycle special detour (0102-4-1) | SY | 1 | $5,000.00 | $12,000 | $50,000 | $0.01 | $200,000 |
| 0245 | Traffic control officer (0102-14) | HR | 3,032 | $80.00 | $92.00 | $105.00 | $0.01 | $90.00 |
| 0250 | Temporary highway lighting (0102-30) | EACH | 1 | $700,000 | $950,000 | $650,000 | $0.01 | $600,000 |
| 0255 | Work zone sign (0102-60) | ED | 157,904 | $0.30 | $0.20 | $0.30 | $0.20 | $0.24 |
| 0260 | Temporary barrier, F&I, low profile, concrete (0102-71-13) | LF | 330 | $45.00 | $56.00 | $70.00 | $0.01 | $70.00 |
| 0265 | Temporary barrier, F&I, anchored (0102-71-15) | LF | 4,588 | $45.00 | $40.00 | $75.00 | $0.01 | $100.00 |
| 0270 | Temporary barrier, relocate, low profile concrete (0102-71-23) | LF | 568 | $16.00 | $16.00 | $18.00 | $0.01 | $25.00 |
| 0275 | Temporary barrier, relocate, anchored (0102-71-25) | LF | 7,663 | $16.00 | $17.00 | $21.00 | $0.01 | $25.00 |
| 0280 | Channelizing device- types I, II, VP, drum, or LCD (0102-74-1) | ED | 436,702 | $0.15 | $0.10 | $0.15 | $0.10 | $0.14 |
| 0285 | Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8) | FD | 1,148,176 | $0.10 | $0.03 | $0.05 | $0.03 | $0.05 |
| 0290 | Arrow board / advance warning arrow panel (0102-76) | ED | 10,518 | $6.30 | $4.50 | $6.50 | $5.20 | $6.00 |
| 0295 | Temporary crash cushion, redirective option (0102-89-1) | LO | 20 | $2,086.00 | $1,100.00 | $2,500.00 | $0.01 | $5,000.00 |
| 0300 | Portable changeable message sign, temporary (0102-99) | ED | 6,691 | $9.00 | $10.00 | $12.00 | $9.50 | $12.00 |
| 0305 | Temporary signalization and maintenance, intersection (0102-104) | ED | 13,552 | $12.50 | $13.00 | $16.00 | $0.01 | $16.00 |
| 0310 | Temporary traffic detection and maintenance, intersection (0102-107-1) | ED | 13,552 | $16.75 | $18.00 | $20.00 | $0.01 | $21.00 |
| 0315 | Existing ITS maintenance (0102-112) | DA | 1,076 | $191.50 | $220.00 | $220.00 | $0.01 | $240.00 |
| 0320 | Type III barricade (0102-115) | ED | 10,360 | $0.35 | $0.22 | $0.30 | $0.30 | $0.30 |
| 0325 | Portable regulatory, sign (0102-150-1) | ED | 2,648 | $6.10 | $4.00 | $6.00 | $4.50 | $6.00 |
| 0330 | Radar speed display unit (0102-150-2) | ED | 2,648 | $7.00 | $4.00 | $7.00 | $5.00 | $5.50 |
| 0335 | Removable tape, white, solid 6" (0102-913-21) | GM | 0.18 | $11,030 | $13,400 | $18,000 | $11,000 | $1,450.00 |
| 0340 | Removable tape, yellow, solid, (0102-913-31) | GM | 3.08 | $11,160 | $13,400 | $18,000 | $11,000 | $15,000 |
| 0345 | Sediment barrier (0104-10-3) | LF | 9,495 | $2.60 | $4.50 | $5.00 | $1.50 | $37.50 |
| 0350 | Inlet protection system (0104-18) | EACH | 81 | $260.50 | $230.00 | $400.00 | $300.00 | $581.00 |
| 0355 | Litter removal (0107-1) | ACRE | 517.59 | $48.00 | $55.00 | $35.00 | $30.00 | $83.00 |
| 0360 | Mowing (0107-2) | ACRE | 417.09 | $68.00 | $68.00 | $175.00 | $50.00 | $110.00 |
| 0365 | Monitor existing structures- inspection and settlement monitoring (0108-1) | LS | 1 | $15,000 | $200,000 | $15,000 | $60,000 | $82,500 |
| 0370 | Monitor existing structures- inspection and settlement monitoring (0108-1) | LS | 1 | $15,000 | $11,000 | $7,500.00 | $0.01 | $55,000 |
| 0375 | Monitor existing structures- vibration monitoring (0108-2) | LS | 1 | $15,000 | $100,000 | $60,000 | $21,000 | $165,000 |
| 0380 | Monitor existing structures- vibration monitoring (0108-2) | LS | 1 | $15,000 | $9,000.00 | $15,000 | $0.01 | $137,000 |
| 0385 | Monitor existing structures- groundwater monitoring (0108-3) | LS | 1 | $20,000 | $400,000 | $30,000 | $0.01 | $16,500 |
| 0390 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $335,000 | $600,000 | $750,000 | $4,000,000 | $260,000 |
| 0395 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $150,000 | $8,000.00 | $200,000 | $4,000,000 | $43,000 |
| 0400 | Selective clearing and areas with trees to remain (0110-2-2) | ACRE | 3.14 | $20,000 | $12,450 | $20,000 | $20,000 | $20,500 |
| 0405 | Removal of existing concrete (0110-4-10) | SY | 9,488 | $36.75 | $47.00 | $80.00 | $42.00 | $175.00 |
| 0410 | Tree protection barrier (0110-21) | LF | 3,801 | $7.60 | $2.25 | $12.00 | $2.00 | $10.00 |
| 0415 | Tree root and branch pruning (0110-22) | EACH | 5 | $5,000.00 | $955.00 | $1,200.00 | $1,000.00 | $1,000.00 |
| 0420 | Tree removal (0110-23) | EACH | 11 | $500.00 | $1,300.00 | $1,200.00 | $850.00 | $825.00 |
| 0425 | Regular excavation (0120-1) | CY | 8,626.40 | $54.00 | $27.00 | $30.00 | $55.00 | $25.00 |
| 0430 | Embankment (0120-6) | CY | 5,563.80 | $30.50 | $25.00 | $55.00 | $130.00 | $81.00 |
| 0435 | Regular excavation (3-R projects only) (0120-71) | LS | 1 | $50,000 | $13,000 | $10,000 | $650.00 | $2,400.00 |
| 0440 | Flowable fill (0121-70) | CY | 3.60 | $360.50 | $230.00 | $650.00 | $510.00 | $500.00 |
| 0445 | Type B stabilization (0160-4) | SY | 16,438 | $20.00 | $13.00 | $15.00 | $20.00 | $75.00 |
| 0450 | Optional base, base group 01 (0285-701) | SY | 3,465 | $30.00 | $11.00 | $25.00 | $20.00 | $60.00 |
| 0455 | Optional base, base group 09 (0285-709) | SY | 10,622 | $41.75 | $32.00 | $50.00 | $40.00 | $70.00 |
| 0460 | Optional base, base group 10 (0285-710) | SY | 430 | $50.00 | $35.00 | $85.00 | $65.00 | $150.00 |
| 0465 | Milling existing asphalt pavement, 2" avg depth (0327-70-5) | SY | 5,192 | $3.30 | $9.00 | $7.00 | $0.01 | $6.00 |
| 0470 | Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6) | SY | 111,434 | $1.75 | $5.00 | $4.00 | $3.00 | $4.25 |
| 0475 | Milling existing asphalt pavement, 3/4" avg depth (0327-70-19) | SY | 37,339 | $1.20 | $3.50 | $3.00 | $2.75 | $3.00 |
| 0480 | Superpave asphaltic conc, traffic C (0334-1-13) | TN | 8,387.30 | $135.00 | $180.00 | $200.00 | $140.00 | $237.00 |
| 0485 | Asphalt concrete friction course, inc bit, FC-5, PG 76-22 (0337-7-25) | TN | 1,290.20 | $218.50 | $260.00 | $270.00 | $240.00 | $300.00 |
| 0490 | Asphalt concrete friction course,traffic C, FC-12.5, PG (0337-7-83) | TN | 10,549.10 | $166.00 | $195.00 | $200.00 | $155.00 | $300.00 |
| 0495 | Miscellaneous asphalt (0339-1) | TN | 114.90 | $295.00 | $260.00 | $300.00 | $190.00 | $330.00 |
| 0500 | Concrete class NS, gravity index 400-011 (0400-0-11) | CY | 50 | $1,200.00 | $875.00 | $1,100.00 | $600.00 | $1,200.00 |
| 0505 | Inlets, curb, type P-3, partial (0425-1335) | EACH | 2 | $13,000 | $14,000 | $15,000 | $17,000 | $8,700.00 |
| 0510 | Inlets, curb, type P-5, <10' (0425-1351) | EACH | 7 | $11,000 | $15,000 | $13,000 | $15,000 | $9,800.00 |
| 0515 | Inlets, curb, type P-5, >10' (0425-1352) | EACH | 3 | $18,000 | $18,000 | $16,000 | $16,500 | $14,750 |
| 0520 | Inlets, curb, type P-5, partial (0425-1355) | EACH | 1 | $9,000.00 | $10,000 | $13,000 | $14,500 | $8,500.00 |
| 0525 | Inlets, curb, type P-6, <10' (0425-1361) | EACH | 6 | $11,100 | $12,000 | $14,000 | $14,500 | $9,300.00 |
| 0535 | Inlets, curb, type J-5, <10' (0425-1451) | EACH | 1 | $10,000 | $18,000 | $20,000 | $21,000 | $10,500 |
| 0540 | Inlets, curb, type J-5, >10' (0425-1452) | EACH | 1 | $22,000 | $23,000 | $20,000 | $21,000 | $21,500 |
| 0545 | Inlets, DT bot, type D, <10' (0425-1541) | EACH | 1 | $7,655.00 | $11,000 | $9,000.00 | $10,000 | $10,200 |
| 0550 | Inlets, DT bot, type E, <10' (0425-1551) | EACH | 1 | $8,000.00 | $10,000 | $11,000 | $11,000 | $9,600.00 |
| 0555 | Inlets, gutter, type S, >10' (0425-1702) | EACH | 2 | $8,100.00 | $11,000 | $16,000 | $16,500 | $9,700.00 |
| 0560 | Inlets, adjacent barrier, >10' (0425-1922) | EACH | 2 | $15,300 | $21,000 | $15,000 | $15,500 | $14,250 |
| 0565 | Manholes, P-7, <10' (0425-2-41) | EACH | 2 | $9,100.00 | $10,000 | $9,000.00 | $10,000 | $15,750 |
| 0570 | Manholes, P-7, partial (0425-2-43) | EACH | 1 | $6,000.00 | $8,000.00 | $7,000.00 | $7,500.00 | $4,000.00 |
| 0575 | Manholes, P-8, partial (0425-2-63) | EACH | 1 | $8,000.00 | $10,000 | $10,000 | $10,000 | $5,300.00 |
| 0576 | Manholes, J-8, <10' (0425-2-91) | EACH | 1 | $16,200 | $18,000 | $18,000 | $17,000 | $12,000 |
| 0580 | Manholes, J-8, >10' (0425-2-92) | EACH | 1 | $17,000 | $20,000 | $18,000 | $20,000 | $18,000 |
| 0585 | Manhole, adjust (0425-5) | EACH | 40 | $850.00 | $900.00 | $900.00 | $1,050.00 | $2,200.00 |
| 0590 | Manhole, adjust, utilities (0425-5-1) | EACH | 7 | $1,000.00 | $1,000.00 | $900.00 | $950.00 | $2,400.00 |
| 0595 | Valve boxes, adjust (0425-6) | EACH | 48 | $750.00 | $750.00 | $600.00 | $650.00 | $1,700.00 |
| 0600 | Meter boxes, adjust (0425-6-1) | EACH | 3 | $800.00 | $800.00 | $950.00 | $1,000.00 | $3,700.00 |
| 0605 | Modify existing drainage structure (0425-11) | EACH | 4 | $5,134.00 | $9,500.00 | $6,500.00 | $7,500.00 | $4,200.00 |
| 0610 | Pipe culvert,optional material,round, 15"S/CD (0430-175115) | LF | 351 | $335.00 | $350.00 | $190.00 | $350.00 | $150.00 |
| 0615 | Pipe culvert,optional material,round, 18"S/CD (0430-175118) | LF | 555 | $285.00 | $200.00 | $220.00 | $275.00 | $130.00 |
| 0620 | Pipe culvert,optional material,round, 24"S/CD (0430-175124) | LF | 143 | $300.00 | $260.00 | $270.00 | $275.00 | $180.00 |
| 0625 | Pipe culvert, opt material, round, 36"S/CD (0430-175136) | LF | 138 | $500.00 | $460.00 | $290.00 | $350.00 | $300.00 |
| 0635 | U-endwall with baffles, index 261/430-011, 1:4 slope, 18"pipe (0430-611125) | EACH | 2 | $6,000.00 | $7,000.00 | $6,000.00 | $7,500.00 | $10,000 |
| 0640 | U-endwall with baffles, index 261/430-011, 1:3 slope, 18"pipe (0430-611225) | EACH | 1 | $5,500.00 | $6,000.00 | $6,000.00 | $6,250.00 | $1,000.00 |
| 0645 | U-endwall with baffles, index 261/430-011, 1:2 slope, 18"pipe (0430-611325) | EACH | 2 | $5,000.00 | $6,000.00 | $6,000.00 | $6,500.00 | $8,100.00 |
| 0650 | Pipe filling and plugging- place out of service (0430-830) | CY | 24.20 | $900.00 | $950.00 | $485.00 | $550.00 | $650.00 |
| 0655 | Pipe liner, cured in place, 15" (0431-1115) | LF | 70 | $629.50 | $650.00 | $160.00 | $500.00 | $300.00 |
| 0658 | Sheet piling steel, temporary- critical (0455-133-2) | SF | 18,918 | $50.00 | $60.00 | $35.00 | $30.00 | $100.00 |
| 0660 | Bullet rail, single rail (0515-4-1) | LF | 1,127 | $70.00 | $55.00 | $50.00 | $55.00 | $58.00 |
| 0661 | Bullet rail, double rail (0515-4-2) | LF | 218 | $135.00 | $110.00 | $110.00 | $100.00 | $110.00 |
| 0665 | Concrete curb & gutter, type E (0520-1-7) | LF | 2,593 | $42.50 | $47.00 | $65.00 | $30.00 | $70.00 |
| 0670 | Concrete curb & gutter, type F (0520-1-10) | LF | 5,018 | $44.75 | $47.00 | $65.00 | $35.00 | $75.00 |
| 0675 | Concrete curb, type D (0520-2-4) | LF | 70 | $214.00 | $41.00 | $90.00 | $35.00 | $60.00 |
| 0680 | Traffic separator concrete- type I, 6' wide (0520-5-12) | LF | 294 | $158.00 | $70.00 | $130.00 | $70.00 | $125.00 |
| 0685 | Shoulder gutter- concrete (0520-6) | LF | 200 | $54.00 | $33.00 | $75.00 | $43.00 | $90.00 |
| 0690 | Median concrete barrier, tall grade-separated (0521-1-13) | LF | 312 | $525.00 | $700.00 | $590.00 | $520.00 | $450.00 |
| 0695 | Median concrete barrier, variable section width for sign or pier shielding (0521-1-14) | LF | 275 | $650.00 | $800.00 | $850.00 | $640.00 | $650.00 |
| 0700 | Concrete parapet, pedestrian/bicycle, 27" height (0521-6-11) | LF | 83 | $635.00 | $700.00 | $0.01 | $310.00 | $79.00 |
| 0705 | Concrete traffic railing barrier, with junction slab, 32" vertical face (0521-8-3) | LF | 1,130 | $1.00 | $800.00 | $0.01 | $520.00 | $0.00 |
| 0710 | Concrete barrier, with slab, 36" single slope (0521-8-7) | LF | 515 | $461.00 | $600.00 | $575.00 | $530.00 | $550.00 |
| 0715 | Concrete barrier, with special junction slab, 32" vertical face (0521-8-31) | LF | 1,130 | $625.00 | $800.00 | $800.00 | $540.00 | $1,200.00 |
| 0720 | Opaque visual barrier, index 010 concrete (0521-9-1) | LF | 147 | $145.00 | $180.00 | $145.00 | $100.00 | $190.00 |
| 0725 | Shoulder concrete barrier, 38" or 44" height (0521-72-40) | LF | 168 | $465.00 | $650.00 | $510.00 | $400.00 | $600.00 |
| 0730 | Concrete sidewalk and driveways, 4" thick (0522-1) | SY | 363 | $252.00 | $61.00 | $70.00 | $80.00 | $150.00 |
| 0735 | Concrete sidewalk and driveways, 6" thick (0522-2) | SY | 4,296 | $302.50 | $87.00 | $100.00 | $80.00 | $175.00 |
| 0740 | Bus boarding pad- concrete (0522-3) | SY | 55 | $375.50 | $88.00 | $355.00 | $70.00 | $360.00 |
| 0745 | Bus shelter pad- concrete (0522-4) | SY | 37 | $205.50 | $88.00 | $680.00 | $120.00 | $360.00 |
| 0750 | Concrete ditch pavement, non reinforced, 4" (0524-1-2) | SY | 3 | $183.00 | $503.00 | $480.00 | $1,000.00 | $880.00 |
| 0755 | Concrete slope pavement,non reinforced, 4" (0524-2-2) | SY | 839 | $183.00 | $50.00 | $200.00 | $60.00 | $155.00 |
| 0760 | Detectable warnings (0527-2) | SF | 1,484 | $41.75 | $40.00 | $60.00 | $45.00 | $51.00 |
| 0765 | Guardrail -roadway, general (0536-1-1) | LF | 2,723 | $26.25 | $22.00 | $21.00 | $19.00 | $38.00 |
| 0770 | Pipe rail for guardrail (0536-6) | LF | 56 | $24.00 | $24.00 | $24.00 | $20.00 | $23.00 |
| 0775 | Special guardrail post- post for shallow mount (0536-7-3) | EACH | 4 | $185.00 | $120.00 | $125.00 | $120.00 | $120.00 |
| 0780 | Guardrail transition to rigid barrier, F&I- index 536- 001, approach TL-3 (0536-8112) | EACH | 11 | $3,250.00 | $3,500.00 | $3,500.00 | $3,300.00 | $3,500.00 |
| 0785 | Guardrail transition to rigid barrier, F&I- index 536- 002, approach TL-3 (0536-8122) | EACH | 1 | $4,300.00 | $1,500.00 | $1,600.00 | $1,400.00 | $1,500.00 |
| 0790 | Guardrail removal (0536-73) | LF | 4,008 | $1.50 | $2.50 | $3.00 | $2.00 | $2.50 |
| 0795 | Guardrail end treatment- trailing anchorage (0536-85-20) | EACH | 4 | $1,700.00 | $1,600.00 | $1,700.00 | $1,500.00 | $1,600.00 |
| 0800 | Guardrail end treatment- parallel approach terminal (0536-85-24) | EACH | 7 | $3,450.00 | $4,000.00 | $3,800.00 | $3,500.00 | $3,700.00 |
| 0805 | Crash cushion, TL-2, narrow (0544-2-1) | EACH | 1 | $21,010 | $20,000 | $25,000 | $17,500 | $24,600 |
| 0810 | Crash cushion, TL-3, narrow (0544-3-1) | EACH | 1 | $30,790 | $31,000 | $38,000 | $29,000 | $37,250 |
| 0815 | Retaining wall system, permanent, excluding barrier (0548-12) | SF | 18,054 | $239.50 | $195.00 | $120.00 | $70.00 | $107.00 |
| 0820 | Fencing, type B, 7.1-8.0', standard (0550-10240) | LF | 899 | $39.00 | $42.00 | $40.00 | $35.00 | $31.00 |
| 0821 | Fencing, type R, 7.1-8.0, W / enclosure (0550-10344) | LF | 868 | $250.00 | $360.00 | $170.00 | $320.00 | $132.00 |
| 0825 | Performance turf, sod (0570-1-2) | SY | 14,465 | $5.40 | $4.50 | $4.00 | $6.00 | $12.00 |
| 0830 | Irrigation system- modify existing system (0590-70-5) | LS | 1 | $35,950 | $42,000 | $60,000 | $43,000 | $31,500 |
| 0835 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 257 | $29.25 | $40.00 | $35.00 | $31.00 | $32.00 |
| 0840 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 6 | $1,692.00 | $2,300.00 | $1,800.00 | $1,800.00 | $1,860.00 |
| 0845 | Traffic monitoring site vehicle sensor-non-weight, furnish & install (0695-1-1) | EACH | 18 | $2,056.00 | $2,700.00 | $2,500.00 | $2,200.00 | $2,250.00 |
| 0850 | Traffic monitoring site inductive loop assembly, & install, 2 loops (0695-6-12) | EACH | 18 | $2,582.00 | $3,300.00 | $3,000.00 | $2,700.00 | $2,800.00 |
| 0855 | Traffic monitoring site cabinet, furnish & install, type 4, 2 plane back, base mount (0695-7171) | EACH | 1 | $6,512.00 | $9,000.00 | $7,500.00 | $6,800.00 | $7,200.00 |
| 0860 | Traffic monitoring site cabinet, remove existing cabinet (0695-7600) | EACH | 1 | $689.50 | $900.00 | $800.00 | $720.00 | $755.00 |
| 0865 | Tubular marker, 36" white post (0704-1-3) | EACH | 1,474 | $225.00 | $250.00 | $300.00 | $0.01 | $245.00 |
| 0870 | Raised pavement marker, type B (0706-1-3) | EACH | 7,813 | $4.30 | $5.00 | $6.00 | $4.00 | $5.50 |
| 0875 | Painted pavement markings, standard, white, solid, 6" (0710-11101) | GM | 17.42 | $2,656.00 | $1,500.00 | $1,800.00 | $2,600.00 | $1,650.00 |
| 0880 | Painted pavement markings, standard, white, solid for interchange and urban island, (0710-11102) | GM | 4.17 | $2,973.00 | $1,600.00 | $1,800.00 | $2,900.00 | $1,750.00 |
| 0885 | Painted pavement markings, standard, white, solid for interchange markings, 12" (0710-11103) | GM | 0.43 | $4,410.00 | $2,000.00 | $2,300.00 | $4,300.00 | $2,200.00 |
| 0890 | Painted pavement markings, standard, white, solid for crosswalk and roundabout, 12" (0710-11123) | LF | 3,119 | $1.90 | $2.00 | $2.50 | $1.80 | $2.25 |
| 0895 | Painted pavement markings, standard, white, solid for diagonal or chevron, 18" (0710-11124) | LF | 559 | $2.00 | $3.00 | $3.50 | $1.90 | $3.50 |
| 0900 | Painted pavement markings, standard, white, solid for stop line or crosswalk, 24" (0710-11125) | LF | 1,746 | $2.10 | $4.00 | $4.50 | $2.00 | $4.50 |
| 0905 | Painted pavement markings, standard, white, skip, 10-30 or skip, 6" wide (0710-11131) | GM | 14.66 | $611.00 | $800.00 | $900.00 | $600.00 | $880.00 |
| 0910 | Painted pavement marking, standard,white, 3'-9' skip drop line and approach to toll 12" wide, (0710-11133) | GM | 1.44 | $1,224.00 | $1,600.00 | $1,800.00 | $1,200.00 | $1,760.00 |
| 0915 | Painted pavement markings, standard, white, 2-4 dotted guideline/ 6-10 dotted 6" (0710-11141) | GM | 2.95 | $796.00 | $800.00 | $900.00 | $775.00 | $880.00 |
| 0920 | Painted pavement markings, standard, white, message or symbol (0710-11160) | EACH | 201 | $47.75 | $85.00 | $100.00 | $50.00 | $94.00 |
| 0925 | Painted pavement markings, standard, white, arrows (0710-11170) | EACH | 327 | $47.75 | $45.00 | $55.00 | $50.00 | $50.00 |
| 0930 | Painted pavement markings, standard, yellow, solid, 6" (0710-11201) | GM | 12.47 | $2,655.00 | $1,510.00 | $1,800.00 | $2,600.00 | $1,650.00 |
| 0935 | Painted pavement markings, standard, yellow, solid for diagonal or chevron, 18" (0710-11224) | LF | 401 | $1.80 | $3.00 | $3.50 | $1.75 | $3.25 |
| 0940 | Disputes review board, meeting- DO not bid (0999-20-1) | DA | 38 | $3,900.00 | $3,900.00 | $3,900.00 | $3,900.00 | $3,900.00 |
| 0945 | Disputes review board, hearing- DO not bid (0999-20-2) | EACH | 6 | $4,500.00 | $4,500.00 | $4,500.00 | $4,500.00 | $4,500.00 |
| 0950 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $136,770 | $136,770 | $136,770 | $136,770 | $136,770 |
| 0955 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $13,230 | $13,230 | $13,230 | $13,230 | $13,230 |
| 0960 | Local agency initial amount (DO not bid) (0999-26) | LS | 1 | $1,958.00 | $1,958.00 | $1,958.00 | $1,958.00 | $1,958.00 |
| 0965 | Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111) | EACH | 67 | $600.00 | $600.00 | $700.00 | $475.00 | $615.00 |
| 0970 | Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112) | EACH | 18 | $1,850.00 | $1,800.00 | $2,000.00 | $1,500.00 | $1,900.00 |
| 0975 | Single column ground sign assembly, F&I ground mount, 30.0 SF (0700-1113) | EACH | 3 | $2,750.00 | $2,600.00 | $2,800.00 | $2,100.00 | $2,800.00 |
| 0980 | Single column ground sign assembly, F&I barrier less than 12 SF (0700-1211) | EACH | 1 | $2,850.00 | $2,600.00 | $3,000.00 | $2,100.00 | $2,800.00 |
| 0985 | Single column ground sign assembly, F&I barrier 12.0-20.0 SF (0700-1212) | EACH | 1 | $2,900.00 | $3,100.00 | $3,500.00 | $2,500.00 | $3,325.00 |
| 0990 | Single column ground sign assembly, F&I barrier less than 12 SF (0700-1311) | EACH | 3 | $3,950.00 | $3,300.00 | $3,500.00 | $2,600.00 | $3,500.00 |
| 0995 | Single column ground sign assembly, F&I barrier 12.0-20.0 SF (0700-1312) | EACH | 2 | $4,150.00 | $3,800.00 | $4,200.00 | $3,000.00 | $4,000.00 |
| 1000 | Single column ground sign assembly, relocate (0700-1500) | EACH | 6 | $300.00 | $430.00 | $500.00 | $350.00 | $465.00 |
| 1005 | Single column ground sign assembly, remove (0700-1600) | EACH | 73 | $50.00 | $62.00 | $70.00 | $50.00 | $67.00 |
| 1010 | Multi-column ground sign assembly, F&I ground mount, 30.0 SF (0700-2113) | EACH | 2 | $6,500.00 | $7,000.00 | $7,700.00 | $5,500.00 | $7,450.00 |
| 1015 | Multi-column ground sign assembly, F&I ground mount, 1-200.0 SF (0700-2116) | EACH | 1 | $25,000 | $20,000 | $20,000 | $15,000 | $19,950 |
| 1020 | Multi-column ground sign assembly, F&I ground mount, 1-300.0 SF (0700-2117) | EACH | 1 | $32,500 | $25,000 | $28,000 | $19,000 | $25,950 |
| 1025 | Multi-column ground sign assembly, remove (0700-2600) | EACH | 3 | $1,400.00 | $1,300.00 | $1,500.00 | $1,000.00 | $1,400.00 |
| 1030 | Sign panel, furnish & install ground mount, UP to 12 SF (0700-3101) | EACH | 21 | $300.00 | $300.00 | $530.00 | $290.00 | $510.00 |
| 1035 | Sign panel, furnish & install ground mount, 21-30 SF (0700-3103) | EACH | 7 | $1,250.00 | $1,000.00 | $1,100.00 | $1,200.00 | $1,053.00 |
| 1040 | Sign panel, furnish & install ground mount, 31-50 SF (0700-3104) | EACH | 1 | $2,400.00 | $1,600.00 | $1,800.00 | $1,400.00 | $1,655.00 |
| 1045 | Sign panel, furnish & install overhead mount, 12-20 SF (0700-3202) | EACH | 6 | $865.00 | $900.00 | $1,000.00 | $1,400.00 | $951.00 |
| 1050 | Sign panel, furnish & install overhead mount, 31-50 SF (0700-3204) | EACH | 1 | $1,616.00 | $1,700.00 | $1,800.00 | $2,600.00 | $1,750.00 |
| 1055 | Sign panel, furnish & install overhead mount, 101-200 SF (0700-3206) | EACH | 5 | $6,721.00 | $7,000.00 | $8,000.00 | $7,200.00 | $7,400.00 |
| 1060 | Sign panel, furnish & install overhead mount, 201-300 SF (0700-3207) | EACH | 4 | $6,917.00 | $7,100.00 | $8,000.00 | $11,000 | $7,600.00 |
| 1065 | Sign panel, furnish & install overhead mount, 301-400 SF (0700-3208) | EACH | 1 | $10,280 | $11,000 | $12,000 | $13,000 | $11,310 |
| 1070 | Sign panel, relocate, UP to 12 SF (0700-3501) | EACH | 1 | $153.50 | $7,530.00 | $750.00 | $140.00 | $665.00 |
| 1075 | Sign panel, relocate, 201-300 SF (0700-3507) | EACH | 2 | $2,737.00 | $6,100.00 | $6,800.00 | $2,000.00 | $6,500.00 |
| 1080 | Sign panel, remove, UP to 12 SF (0700-3601) | EACH | 22 | $50.00 | $50.00 | $300.00 | $100.00 | $250.00 |
| 1085 | Sign panel, remove, 21-30 SF (0700-3603) | EACH | 6 | $100.00 | $100.00 | $400.00 | $300.00 | $380.00 |
| 1090 | Sign panel, remove, 31-50 SF (0700-3604) | EACH | 2 | $150.00 | $150.00 | $600.00 | $550.00 | $521.00 |
| 1095 | Sign panel, remove, 101-200 SF (0700-3606) | EACH | 5 | $1,628.00 | $2,725.00 | $1,100.00 | $1,650.00 | $1,050.00 |
| 1100 | Sign panel, remove, 201-300 SF (0700-3607) | EACH | 4 | $1,918.00 | $5,460.00 | $1,800.00 | $2,500.00 | $1,700.00 |
| 1105 | Sign panel, remove, 301-400 SF (0700-3608) | EACH | 1 | $2,043.00 | $7,270.00 | $2,300.00 | $2,000.00 | $2,070.00 |
| 1110 | Overhead static sign furnish & install, cantilever, 40 FT (0700-4113) | EACH | 2 | $107,460 | $110,000 | $140,000 | $250,000 | $118,000 |
| 1115 | Overhead static sign furnish & install, cantilever, 50 FT (0700-4114) | EACH | 3 | $117,800 | $130,000 | $160,000 | $250,000 | $130,000 |
| 1120 | Overhead static sign furnish & install, span, 51-100 FT (0700-4125) | EACH | 1 | $284,640 | $300,000 | $300,000 | $525,000 | $313,000 |
| 1125 | Overhead static sign furnish & install, span, 101-150 (0700-4126) | EACH | 1 | $326,890 | $350,000 | $400,000 | $650,000 | $360,000 |
| 1130 | Overhead static sign furnish & install, span, 151-200 (0700-4127) | EACH | 1 | $375,970 | $400,000 | $475,000 | $800,000 | $414,000 |
| 1135 | Overhead static sign relocate, span, 51-100 FT (0700-4525) | EACH | 1 | $129,840 | $140,000 | $150,000 | $0.01 | $143,000 |
| 1140 | Overhead static sign deep foundation removal, cantilever (0700-4612) | EACH | 5 | $17,580 | $9,000.00 | $20,000 | $35,000 | $19,350 |
| 1145 | Overhead static sign deep foundation removal, span (0700-4622) | EACH | 1 | $30,980 | $17,000 | $40,000 | $50,000 | $34,100 |
| 1150 | Embedded dynamic message remove (0700-7600) | EACH | 1 | $2,875.00 | $2,800.00 | $6,000.00 | $900.00 | $14,000 |
| 1155 | Retroreflective sign strip- furnish and install, 2' (0700-13-12) | EACH | 16 | $90.00 | $131.00 | $150.00 | $90.00 | $140.00 |
| 1160 | Enhanced highway sign AC powered, F&I ground mount, highlighted sign <12 SF (0700-141140) | EACH | 6 | $8,093.00 | $9,000.00 | $9,500.00 | $8,500.00 | $8,900.00 |
| 1165 | Enhanced highway sign AC powered, relocate - ground mount (0700-141802) | EACH | 2 | $3,451.00 | $3,600.00 | $4,000.00 | $3,600.00 | $3,800.00 |
| 1170 | Tubular marker, 36" white post (0704-1-3) | EACH | 680 | $225.00 | $225.00 | $260.00 | $150.00 | $250.00 |
| 1175 | Tubular marker, 36" yellow (0704-1-4) | EACH | 21 | $225.00 | $225.00 | $260.00 | $150.00 | $250.00 |
| 1180 | Raised pavement marker, type B (0706-1-3) | EACH | 5,512 | $4.30 | $5.00 | $5.75 | $4.00 | $5.50 |
| 1185 | Painted pavement markings, standard, white, island nose (0710-11190) | SF | 36 | $4.30 | $10.00 | $15.00 | $4.00 | $11.00 |
| 1190 | Painted pavement markings, standard, yellow, island nose (0710-11290) | SF | 216 | $4.30 | $10.00 | $15.00 | $4.00 | $11.00 |
| 1195 | Painted pavement markings, durable paint, yellow, island nose (0710-12290) | SF | 145 | $4.80 | $10.00 | $15.00 | $4.50 | $11.00 |
| 1200 | Painted pavement markings, surface (0710-90) | LS | 1 | $43,020 | $20,000 | $25,000 | $42,000 | $22,000 |
| 1205 | Painted pavement markings, surface (0710-90) | LS | 1 | $57,020 | $30,000 | $35,000 | $55,000 | $33,000 |
| 1210 | Thermoplastic, standard, solid, 8" for interchange and urban island (0711-11102) | GM | 0.01 | $8,719.00 | $6,000.00 | $6,000.00 | $8,500.00 | $66,500 |
| 1215 | Thermoplastic, standard, solid, 12" for interchange markings (0711-11103) | GM | 0.45 | $15,620 | $10,000 | $13,000 | $15,000 | $11,000 |
| 1220 | Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123) | LF | 6,791 | $3.50 | $4.00 | $5.00 | $3.50 | $4.40 |
| 1225 | Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124) | LF | 375 | $5.20 | $5.00 | $7.00 | $5.00 | $5.50 |
| 1230 | Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125) | LF | 2,278 | $7.00 | $6.00 | $7.00 | $7.00 | $6.60 |
| 1235 | Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141) | GM | 1.16 | $2,656.00 | $3,000.00 | $3,500.00 | $2,600.00 | $3,300.00 |
| 1240 | Thermoplastic, standard, message or symbol (0711-11160) | EACH | 33 | $159.50 | $225.00 | $250.00 | $155.00 | $248.00 |
| 1245 | Thermoplastic, standard, arrow (0711-11170) | EACH | 235 | $67.00 | $85.00 | $95.00 | $65.00 | $93.00 |
| 1250 | Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron (0711-11224) | LF | 235 | $4.90 | $5.00 | $6.00 | $5.00 | $5.50 |
| 1255 | Thermoplastic, standard, yellow, 2-4 dotted guide line dotted extension line, 6" (0711-11241) | GM | 0.20 | $2,724.00 | $3,100.00 | $3,500.00 | $2,500.00 | $3,300.00 |
| 1260 | Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125) | LF | 4,043 | $17.50 | $16.00 | $18.00 | $18.00 | $17.60 |
| 1265 | Thermoplastic, preformed, white, 2-4 dotted guideline on concrete surfaces (0711-14141) | GM | 0.48 | $9,803.00 | $20,000 | $23,000 | $10,000 | $22,000 |
| 1270 | Thermoplastic, preformed, white, message (0711-14160) | EACH | 40 | $228.50 | $350.00 | $400.00 | $220.00 | $385.00 |
| 1275 | Thermoplastic, preformed, white, arrow (0711-14170) | EACH | 38 | $95.50 | $125.00 | $150.00 | $90.00 | $138.00 |
| 1280 | Thermoplastic, preformed, 6" white, railroad dynamic envelope (0711-14191) | LF | 107 | $4.50 | $10.00 | $12.00 | $4.50 | $11.00 |
| 1285 | Thermoplastic, preformed, 12" white on asphalt pavement, railroad dynamic envelope (0711-14193) | LF | 1,146 | $9.00 | $12.00 | $15.00 | $8.75 | $13.20 |
| 1290 | Thermoplastic, preformed, 24" white with 4" black contrast crosswalk on concrete pavement, 32" (0711-14526) | LF | 263 | $24.00 | $30.00 | $35.00 | $23.00 | $33.00 |
| 1295 | Thermoplastic, preformed, 24" white with 4" black contrast stop line on concrete 32" (0711-14527) | LF | 224 | $24.00 | $30.00 | $35.00 | $23.00 | $33.00 |
| 1300 | Thermoplastic, preformed, 12" white with 4" black contrast crosswalk on concrete pavement, 20" (0711-14528) | LF | 318 | $16.00 | $16.00 | $18.00 | $15.50 | $17.60 |
| 1305 | Thermoplastic, preformed, white with black contrast on concrete pavement, message symbol (0711-14560) | EACH | 12 | $1,169.00 | $1,500.00 | $1,800.00 | $1,150.00 | $1,650.00 |
| 1310 | Thermoplastic, preformed, white with black contrast, arrow on concrete surface (0711-14570) | EACH | 25 | $1,060.00 | $1,000.00 | $1,200.00 | $1,050.00 | $1,100.00 |
| 1315 | Thermoplastic, preformed, color route shield (0711-14660) | EACH | 18 | $2,444.00 | $3,500.00 | $4,000.00 | $2,400.00 | $3,850.00 |
| 1320 | Thermoplastic, standard-open graded asphalt surfaces solid, 6" (0711-15101) | GM | 0.71 | $7,835.00 | $6,500.00 | $7,300.00 | $7,500.00 | $7,150.00 |
| 1325 | Thermoplastic, standard-open graded asphalt surfaces, solid, 8" (0711-15102) | GM | 1.38 | $10,500 | $7,600.00 | $8,500.00 | $10,000 | $8,250.00 |
| 1330 | Thermoplastic, standard-open graded asphalt surfaces, skip, 6",10-30 skip or 3-9 lane (0711-15131) | GM | 2.34 | $1,961.00 | $4,500.00 | $5,000.00 | $1,900.00 | $4,950.00 |
| 1335 | Thermoplastic, standard-open graded asphalt surfaces, skip, 12"- approach to toll plaza or 3-9 lane drop (0711-15133) | GM | 0.21 | $3,870.00 | $7,900.00 | $8,800.00 | $3,750.00 | $8,800.00 |
| 1340 | Thermoplastic, standard-open graded asphalt surfaces, yellow, solid, 6" (0711-15201) | GM | 0.74 | $7,320.00 | $6,500.00 | $7,500.00 | $7,150.00 | $7,150.00 |
| 1345 | Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101) | GM | 7.93 | $5,561.00 | $6,000.00 | $6,800.00 | $5,500.00 | $6,600.00 |
| 1350 | Thermoplastic, standard-other surfaces, white, solid, 8" (0711-16102) | GM | 0.36 | $7,561.00 | $6,500.00 | $7,500.00 | $7,200.00 | $7,150.00 |
| 1355 | Thermoplastic, standard-other surfaces, white, skip, 6",10-30 or 3-9 lane drop (0711-16131) | GM | 7.26 | $1,390.00 | $4,500.00 | $5,100.00 | $1,350.00 | $4,950.00 |
| 1356 | Thermoplastic, standard-other surfaces white, skip, 12"- approach to toll plaza or 3-9 lane drop (0711-16133) | GM | 0.04 | $3,179.00 | $9,200.00 | $7,800.00 | $3,100.00 | $10,050 |
| 1360 | Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201) | GM | 4.68 | $5,378.00 | $6,000.00 | $7,000.00 | $5,250.00 | $6,600.00 |
| 1365 | Green-colored pavement markings, bike lane (0714-10) | SF | 4,427 | $9.00 | $12.00 | $15.00 | $9.00 | $13.20 |
| 1370 | Conduit, furnish & install, open trench (0630-2-11) | LF | 4,708 | $17.75 | $23.00 | $20.00 | $18.50 | $19.50 |
| 1375 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 635 | $29.00 | $36.00 | $35.00 | $30.00 | $32.00 |
| 1380 | Conduit, furnish & install, mount (0630-2-15) | LF | 1,577 | $31.50 | $40.00 | $35.00 | $33.00 | $35.00 |
| 1385 | Conduit, furnish & install, embedded concrete barriers and traffic railings (0630-2-16) | LF | 2,743 | $12.25 | $16.00 | $15.00 | $13.00 | $13.50 |
| 1390 | Conduit, remove, bridge mount (0630-2-65) | LF | 1,722 | $16.25 | $21.00 | $20.00 | $17.00 | $18.00 |
| 1395 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 94 | $1,577.00 | $2,000.00 | $1,800.00 | $1,650.00 | $1,700.00 |
| 1400 | Junction box, furnish & install, aerial (0635-3-11) | EACH | 49 | $740.00 | $925.00 | $850.00 | $775.00 | $810.00 |
| 1405 | Junction box, furnish & install, embedded (0635-3-13) | EACH | 43 | $1,168.00 | $1,500.00 | $1,400.00 | $1,200.00 | $1,285.00 |
| 1410 | Electrical power service, F&I, underground, meter by contractor (0639-1122) | AS | 1 | $8,254.00 | $11,000 | $9,500.00 | $8,600.00 | $9,100.00 |
| 1415 | Electrical service disconnect, F&I, pole mount (0639-3-11) | EACH | 1 | $1,863.00 | $2,400.00 | $2,200.00 | $2,000.00 | $2,050.00 |
| 1420 | Prestressed concrete pole, type P-II service pole (0641-2-12) | EACH | 1 | $1,939.00 | $2,420.00 | $2,200.00 | $2,000.00 | $2,133.00 |
| 1425 | Lighting conductors, F&I, insulated, no.8 - 6 (0715-1-12) | LF | 44,441 | $2.05 | $2.60 | $2.50 | $2.20 | $2.25 |
| 1430 | Lighting conductors, F&I, insulated, no 4 to no 2 (0715-1-13) | LF | 2,748 | $4.20 | $5.25 | $4.68 | $4.40 | $4.60 |
| 1435 | Lighting conductors, remove & dispose, contractor owns (0715-1-60) | LF | 29,757 | $0.92 | $1.20 | $1.00 | $1.00 | $1.00 |
| 1440 | Load center, F&I, secondary voltage (0715-7-11) | EACH | 1 | $13,910 | $17,400 | $17,000 | $14,500 | $15,300 |
| 1445 | Load center, remove, voltage (0715-7-41) | EACH | 1 | $1,271.00 | $1,600.00 | $1,500.00 | $1,350.00 | $1,400.00 |
| 1450 | Luminaire, F&I, under deck, wall mount (0715-11125) | EACH | 11 | $1,473.00 | $1,900.00 | $1,700.00 | $1,550.00 | $1,620.00 |
| 1455 | Luminaire, F&I- replace existing luminaire on existing pole/arm, roadway, cobra head (0715-11211) | EACH | 3 | $1,431.00 | $1,800.00 | $1,700.00 | $1,500.00 | $1,575.00 |
| 1460 | Luminaire, remove (0715-11500) | EACH | 13 | $211.50 | $263.00 | $250.00 | $220.00 | $230.00 |
| 1465 | Light pole complete, F&I, standard pole standard foundation, 40' mounting height, 12' arm length (0715-61342) | EACH | 44 | $8,461.00 | $11,000 | $9,500.00 | $8,900.00 | $9,300.00 |
| 1470 | Light pole complete, F&I, standard pole standard foundation, 50' mounting height, 15' arm length (0715-61552) | EACH | 4 | $9,529.00 | $12,000 | $10,000 | $10,000 | $10,500 |
| 1475 | Light pole complete, F&I, double arm pole, median barrier or traffic railing mount, 40' mounting height, 8' arm lengths (0715-63311) | EACH | 1 | $11,820 | $15,000 | $15,000 | $12,400 | $13,000 |
| 1480 | Light pole complete, remove pole and foundation (0715-69000) | EACH | 48 | $1,025.00 | $1,300.00 | $1,200.00 | $1,100.00 | $1,125.00 |
| 1485 | Pole cable distribution system, furnish and install, conventional (0715-500-1) | EACH | 34 | $341.00 | $430.00 | $400.00 | $360.00 | $375.00 |
| 1490 | Pole cable distribution system, wall mount (0715-500-3) | EACH | 41 | $556.50 | $700.00 | $650.00 | $580.00 | $610.00 |
| 1495 | Itsfm subsurface documentation- project length (0611-1-1) | MI | 1.83 | $3,239.00 | $2,500.00 | $3,800.00 | $3,400.00 | $3,500.00 |
| 1500 | Itsfm location documentation- intersection (0611-2-1) | EACH | 7 | $3,143.00 | $1,000.00 | $3,500.00 | $3,300.00 | $3,500.00 |
| 1505 | Conduit, furnish & install, open trench (0630-2-11) | LF | 814 | $28.00 | $24.00 | $35.00 | $30.00 | $31.00 |
| 1510 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 4,805 | $31.75 | $48.00 | $36.00 | $34.00 | $35.00 |
| 1515 | Conduit, furnish & install, aboveground (0630-2-14) | LF | 2,807 | $98.75 | $30.00 | $115.00 | $105.00 | $110.00 |
| 1520 | Signal cable- new or reconstructed intersection, furnish & install (0632-7-1) | PI | 9 | $15,780 | $18,000 | $18,000 | $16,500 | $17,400 |
| 1525 | Signal cable, remove- intersection (0632-7-6) | PI | 2 | $940.50 | $1,000.00 | $1,100.00 | $990.00 | $1,035.00 |
| 1530 | Fiber optic cable, F&I, underground,2-12 fibers (0633-1121) | LF | 100 | $4.50 | $5.00 | $5.50 | $5.00 | $5.00 |
| 1535 | Fiber optic cable, F&I, underground,13-48 fibers (0633-1122) | LF | 3,142 | $4.80 | $5.00 | $5.50 | $5.00 | $5.25 |
| 1540 | Fiber optic connection, install, splice (0633-2-31) | EACH | 22 | $54.50 | $58.00 | $65.00 | $60.00 | $60.00 |
| 1545 | Fiber optic connection hardware, F&I, splice (0633-3-11) | EACH | 2 | $1,523.00 | $1,600.00 | $1,800.00 | $1,600.00 | $1,675.00 |
| 1550 | Fiber optic connection hardware, F&I, splice tray (0633-3-12) | EACH | 3 | $60.50 | $65.00 | $70.00 | $65.00 | $67.00 |
| 1555 | Fiber optic connection hardware, F&I, preterminated connector assembly (0633-3-13) | EACH | 12 | $54.50 | $60.00 | $65.00 | $55.00 | $60.00 |
| 1560 | Fiber optic connection hardware, F&I, preterminated patch panel (0633-3-15) | EACH | 1 | $2,358.00 | $2,500.00 | $2,800.00 | $2,500.00 | $2,600.00 |
| 1565 | Fiber optic connection hardware, F&I, connector panel (0633-3-17) | EACH | 1 | $133.00 | $140.00 | $155.00 | $140.00 | $146.00 |
| 1570 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 119 | $1,795.00 | $2,000.00 | $2,100.00 | $1,900.00 | $1,975.00 |
| 1575 | Pull & splice box, F&I, 24" X 36" cover size (0635-2-12) | EACH | 9 | $3,023.00 | $3,200.00 | $3,500.00 | $3,200.00 | $3,325.00 |
| 1580 | Pull & splice box, F&I, 30" X 60" rectangular or 36" round size (0635-2-13) | EACH | 2 | $7,102.00 | $7,500.00 | $8,100.00 | $7,400.00 | $7,800.00 |
| 1585 | Junction box, furnish & install, aerial (0635-3-11) | EACH | 61 | $740.50 | $800.00 | $850.00 | $780.00 | $815.00 |
| 1590 | Junction box, furnish & install, embedded (0635-3-13) | EACH | 27 | $846.50 | $900.00 | $950.00 | $900.00 | $930.00 |
| 1595 | Electrical power service, F&I, overhead, meter furnished by power company (0639-1111) | AS | 2 | $6,712.00 | $7,000.00 | $7,700.00 | $7,000.00 | $7,400.00 |
| 1600 | Electrical power service, F&I, underground, meter furnished by power company (0639-1121) | AS | 3 | $7,052.00 | $7,500.00 | $8,100.00 | $7,400.00 | $7,750.00 |
| 1605 | Electrical power service, F&I, underground, meter by contractor (0639-1122) | AS | 1 | $7,200.00 | $7,500.00 | $8,100.00 | $7,500.00 | $7,900.00 |
| 1610 | Electrical power service, remove underground (0639-1620) | AS | 1 | $912.50 | $1,000.00 | $1,100.00 | $950.00 | $1,000.00 |
| 1615 | Electrical service wire, & install (0639-2-1) | LF | 1,180 | $9.20 | $10.00 | $15.00 | $10.00 | $10.15 |
| 1620 | Electrical service wire, (0639-2-6) | LF | 520 | $1.20 | $1.25 | $1.50 | $1.25 | $1.30 |
| 1625 | Electrical service disconnect, F&I, pole mount (0639-3-11) | EACH | 1 | $1,971.00 | $2,200.00 | $2,250.00 | $2,100.00 | $2,170.00 |
| 1630 | Electrical service disconnect, remove- pole or cabinet to remain (0639-3-60) | EACH | 4 | $627.00 | $700.00 | $715.00 | $650.00 | $690.00 |
| 1635 | Prestressed concrete pole, type P-II service pole (0641-2-12) | EACH | 6 | $1,940.00 | $2,000.00 | $2,200.00 | $2,000.00 | $2,130.00 |
| 1640 | Aluminum signals pole, (0646-1-11) | EACH | 20 | $2,514.00 | $2,800.00 | $3,000.00 | $2,600.00 | $2,800.00 |
| 1645 | Aluminum signals pole, furnish install pedestrian detector post (0646-1-12) | EACH | 3 | $2,119.00 | $2,500.00 | $2,500.00 | $2,200.00 | $2,300.00 |
| 1650 | Aluminum signals pole, remove (0646-1-60) | EACH | 17 | $249.50 | $275.00 | $285.00 | $260.00 | $275.00 |
| 1655 | Steel mast arm assembly, and install, single arm 78' (0649-21-21) | EACH | 2 | $98,550 | $110,000 | $115,000 | $100,000 | $150,000 |
| 1660 | Steel mast arm assembly, remove, pole only- entire foundation remains (0649-26-1) | EACH | 2 | $3,978.00 | $4,500.00 | $5,000.00 | $4,200.00 | $4,400.00 |
| 1665 | Steel mast arm assembly, remove, shallow foundation- bolt on attachment (0649-26-3) | EACH | 2 | $4,824.00 | $5,000.00 | $5,500.00 | $5,000.00 | $5,300.00 |
| 1670 | Vehicular traffic signal, furnish & install aluminum, 1 section, 1 way (0650-1-11) | AS | 4 | $933.00 | $1,000.00 | $1,100.00 | $975.00 | $1,025.00 |
| 1675 | Vehicular traffic signal, furnish & install aluminum, 3 section, 1 way (0650-1-14) | AS | 29 | $1,497.00 | $1,600.00 | $1,800.00 | $1,600.00 | $1,650.00 |
| 1680 | Vehicular traffic signal, furnish & install 3 section, 1 way (0650-1-44) | AS | 3 | $6,997.00 | $7,500.00 | $8,000.00 | $7,500.00 | $7,700.00 |
| 1685 | Vehicular traffic signal, relocate- includes removal reinstallation (0650-1-70) | AS | 2 | $804.00 | $900.00 | $925.00 | $850.00 | $885.00 |
| 1690 | Vehicular signal auxiliaries, repair/replace/retrofit- & install, backplate- flexible required (0650-2109) | EACH | 48 | $536.00 | $600.00 | $615.00 | $560.00 | $590.00 |
| 1695 | Pedestrian signal, furnish & install LED countdown, 1 way (0653-1-11) | AS | 14 | $885.50 | $1,000.00 | $1,100.00 | $925.00 | $975.00 |
| 1700 | Pedestrian signal, furnish & install LED countdown, 2 ways (0653-1-12) | AS | 5 | $1,478.00 | $1,600.00 | $1,700.00 | $1,500.00 | $1,625.00 |
| 1705 | Pedestrian signal, remove ped signal- pole/pedestal to remain (0653-1-60) | AS | 6 | $120.50 | $130.00 | $150.00 | $125.00 | $133.00 |
| 1710 | Vehicle detection system- furnish & install cabinet equipment (0660-4-11) | EACH | 3 | $16,600 | $17,000 | $20,000 | $17,000 | $18,250 |
| 1715 | Vehicle detection system- furnish & install above ground equipment (0660-4-12) | EACH | 10 | $6,987.00 | $8,000.00 | $8,000.00 | $7,300.00 | $7,700.00 |
| 1720 | Vehicle detection system- relocate above ground equipment (0660-4-42) | EACH | 1 | $1,604.00 | $1,750.00 | $1,800.00 | $1,700.00 | $1,750.00 |
| 1725 | Pedestrian detector, furnish & install, standard (0665-1-11) | EACH | 35 | $444.00 | $240.00 | $600.00 | $370.00 | $332.00 |
| 1730 | Pedestrian detector, relocate (0665-1-40) | EACH | 5 | $260.50 | $165.00 | $350.00 | $750.00 | $74.00 |
| 1735 | Pedestrian detector, remove- pole/pedestal to remain (0665-1-60) | EACH | 17 | $118.50 | $110.00 | $165.00 | $7,700.00 | $331.00 |
| 1740 | Traffic controller assembly, furnish & install model 2070 (0670-5140) | AS | 1 | $41,210 | $30,000 | $48,000 | $45,000 | $45,325 |
| 1745 | Traffic controller assembly, remove controller with (0670-5600) | AS | 2 | $711.50 | $600.00 | $900.00 | $3,700.00 | $783.00 |
| 1750 | Managed field ethernet switch, furnish & install (0684-1-1) | EACH | 1 | $7,401.00 | $8,000.00 | $8,500.00 | $7,750.00 | $8,141.00 |
| 1755 | Sign panel, furnish & install ground mount, UP to 12 SF (0700-3101) | EACH | 5 | $467.00 | $500.00 | $550.00 | $500.00 | $514.00 |
| 1760 | Sign panel, furnish & install overhead mount, UP to 12 SF (0700-3201) | EACH | 18 | $1,020.00 | $950.00 | $1,100.00 | $950.00 | $990.00 |
| 1765 | Sign panel, relocate, UP to 12 SF (0700-3501) | EACH | 1 | $155.00 | $950.00 | $1,000.00 | $900.00 | $945.00 |
| 1770 | Sign panel, remove, UP to 12 SF (0700-3601) | EACH | 3 | $81.00 | $250.00 | $275.00 | $250.00 | $250.00 |
| 1775 | Overhead static sign furnish & install, span, 151-200 (0700-4127) | EACH | 1 | $278,900 | $300,000 | $310,000 | $300,000 | $306,800 |
| 1780 | Overhead static sign furnish & install, span, 201 FT greater (0700-4128) | EACH | 1 | $374,700 | $400,000 | $350,000 | $400,000 | $412,000 |
| 1785 | Internally illuminated sign, furnish & install overhead mount, UP to 12 SF (0700-5-21) | EACH | 2 | $4,735.00 | $5,000.00 | $5,500.00 | $5,000.00 | $5,200.00 |
| 1790 | Internally illuminated sign, furnish & install, overhead mount, 12-18 SF (0700-5-22) | EACH | 5 | $5,620.00 | $6,000.00 | $6,500.00 | $6,000.00 | $6,200.00 |
| 1795 | Internally illuminated sign, remove (0700-5-60) | EACH | 5 | $841.50 | $900.00 | $1,000.00 | $900.00 | $925.00 |
| 1800 | Relocate trees and <14' of clear trunk, sabal palm only (0581-1-7) | EACH | 3 | $700.00 | $1,200.00 | $1,500.00 | $1,200.00 | $1,320.00 |
| 1805 | Relocate trees and palms, >=14' of clear trunk, sabal palm only (0581-1-8) | EACH | 51 | $1,250.00 | $1,200.00 | $1,500.00 | $1,200.00 | $1,320.00 |
| 1810 | Relocate trees and palms, palms, <10.0" DBH, 14.0' or of clear trunk (0581-1272) | EACH | 1 | $1,500.00 | $1,200.00 | $1,500.00 | $1,200.00 | $1,320.00 |
| 1815 | Relocate trees and palms, palms, 10.0"-18.0" DBH, 14.0' or greater of clear trunk (0581-1282) | EACH | 1 | $3,000.00 | $2,500.00 | $2,800.00 | $2,500.00 | $2,750.00 |
| 1820 | Itsfm subsurface documentation- project length (0611-1-1) | MI | 1.54 | $3,228.00 | $4,500.00 | $3,700.00 | $3,400.00 | $3,600.00 |
| 1825 | Conduit, furnish & install, open trench (0630-2-11) | LF | 3,228 | $26.00 | $36.00 | $30.00 | $28.00 | $28.50 |
| 1830 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 1,462 | $36.25 | $50.00 | $45.00 | $38.00 | $40.00 |
| 1835 | Conduit, furnish & install, aboveground (0630-2-14) | LF | 452 | $33.25 | $48.00 | $40.00 | $35.00 | $37.00 |
| 1840 | Conduit, furnish & install, mount (0630-2-15) | LF | 323 | $32.75 | $46.00 | $40.00 | $34.00 | $36.00 |
| 1845 | Signal cable- repair/replace/other, furnish & install (0632-7-2) | LF | 4,013 | $5.70 | $8.00 | $6.50 | $6.00 | $6.25 |
| 1850 | Signal cable, remove- outside intersection (0632-7-7) | LF | 2,139 | $1.70 | $2.50 | $2.00 | $2.00 | $1.80 |
| 1855 | Fiber optic cable, F&I, underground,2-12 fibers (0633-1121) | LF | 235 | $4.50 | $6.00 | $5.50 | $4.50 | $5.00 |
| 1860 | Fiber optic cable, F&I, underground,13-48 fibers (0633-1122) | LF | 12,148 | $4.80 | $6.50 | $5.50 | $5.00 | $5.25 |
| 1865 | Fiber optic cable, F&I, underground,49-96 fibers (0633-1123) | LF | 8,799 | $5.00 | $7.00 | $5.75 | $5.00 | $5.50 |
| 1870 | Fiber optic cable, F&I, underground, 97 - 144 fibers (0633-1124) | LF | 30,024 | $5.40 | $7.50 | $6.25 | $5.70 | $6.00 |
| 1875 | Fiber optic cable, remove, underground (0633-1620) | LF | 1,159 | $1.20 | $1.75 | $1.50 | $1.25 | $1.33 |
| 1880 | Fiber optic connection, install, splice (0633-2-31) | EACH | 1,632 | $54.50 | $75.00 | $65.00 | $57.00 | $60.00 |
| 1885 | Fiber optic connection hardware, F&I, splice (0633-3-11) | EACH | 3 | $1,523.00 | $2,200.00 | $1,800.00 | $1,600.00 | $1,675.00 |
| 1890 | Fiber optic connection hardware, F&I, splice tray (0633-3-12) | EACH | 126 | $60.50 | $80.00 | $70.00 | $65.00 | $67.00 |
| 1895 | Fiber optic connection hardware, F&I, preterminated connector assembly (0633-3-13) | EACH | 168 | $54.50 | $75.00 | $65.00 | $55.00 | $60.00 |
| 1900 | Fiber optic connection hardware, F&I, patch panel- terminated (0633-3-16) | EACH | 6 | $1,844.00 | $2,500.00 | $2,100.00 | $2,000.00 | $2,025.00 |
| 1905 | Fiber optic connection hardware, F&I, connector panel (0633-3-17) | EACH | 8 | $133.00 | $200.00 | $160.00 | $140.00 | $146.00 |
| 1910 | Fiber optic connection hardware, adjust/modify splice enclosure (0633-3-51) | EACH | 18 | $876.50 | $1,200.00 | $1,000.00 | $900.00 | $965.00 |
| 1915 | Fiber optic connection hardware, adjust/modify patch panel (0633-3-56) | EACH | 21 | $1,118.00 | $1,500.00 | $1,300.00 | $1,200.00 | $1,230.00 |
| 1920 | Fiber optic cable locator (0633-6) | DA | 1,076 | $260.00 | $370.00 | $300.00 | $0.01 | $286.00 |
| 1925 | Multi-conductor cable, remove (0633-8-6) | LF | 25 | $1.11 | $1.50 | $1.50 | $1.20 | $1.22 |
| 1930 | Multi-conductor cable, furnish & install, cat 6 (0633-8-11) | LF | 295 | $5.50 | $7.50 | $6.00 | $6.00 | $6.00 |
| 1935 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 41 | $1,538.00 | $2,000.00 | $1,750.00 | $1,600.00 | $1,700.00 |
| 1940 | Pull & splice box, F&I, 24" X 36" cover size (0635-2-12) | EACH | 9 | $3,270.00 | $4,500.00 | $3,800.00 | $3,400.00 | $3,600.00 |
| 1945 | Pull & splice box, F&I, 30" X 60" rectangular or 36" round size (0635-2-13) | EACH | 5 | $7,362.00 | $10,000 | $8,500.00 | $7,700.00 | $8,100.00 |
| 1950 | Junction box, furnish & install, mounted (0635-3-12) | EACH | 4 | $629.00 | $900.00 | $725.00 | $650.00 | $692.00 |
| 1955 | Electrical power service, F&I, underground, meter by contractor (0639-1122) | AS | 2 | $7,201.00 | $10,000 | $8,200.00 | $7,500.00 | $7,900.00 |
| 1960 | Electrical service wire, & install (0639-2-1) | LF | 5,162 | $9.80 | $13.00 | $13.00 | $10.00 | $11.00 |
| 1965 | Electrical service wire, (0639-2-6) | LF | 560 | $1.20 | $1.65 | $1.30 | $1.30 | $1.30 |
| 1970 | Electrical service disconnect, F&I, pole mount (0639-3-11) | EACH | 7 | $1,864.00 | $2,500.00 | $2,300.00 | $2,000.00 | $2,050.00 |
| 1975 | Electrical service disconnect, remove- pole or cabinet to remain (0639-3-60) | EACH | 3 | $627.00 | $900.00 | $720.00 | $650.00 | $690.00 |
| 1980 | Electrical power service- transformer, F&I, <5 kva, single phase, copper windings (0639-6111) | EACH | 4 | $3,010.00 | $4,000.00 | $3,500.00 | $3,200.00 | $13,300 |
| 1985 | Prestressed concrete pole, type P-II service pole (0641-2-12) | EACH | 6 | $1,940.00 | $2,500.00 | $2,250.00 | $2,000.00 | $2,135.00 |
| 1990 | Prestressed concrete pole, type P-IV (0641-2-14) | EACH | 2 | $16,410 | $22,000 | $20,000 | $17,000 | $18,050 |
| 1995 | Prestressed concrete pole, complete pole removal- pedestal/service pole (0641-2-60) | EACH | 1 | $1,838.00 | $2,500.00 | $2,100.00 | $1,900.00 | $2,022.00 |
| 2000 | Concrete CCTV pole, furnish & install with lowering device, (0641-3163) | EACH | 1 | $38,620 | $52,000 | $45,000 | $40,000 | $42,480 |
| 2005 | Concrete CCTV pole, complete pole removal (0641-3800) | EACH | 1 | $6,845.00 | $9,000.00 | $7,800.00 | $7,200.00 | $7,530.00 |
| 2010 | Steel CCTV pole, remove pole- complete/deep foundation removal, bolt on attachment (0649-2605) | EACH | 1 | $12,770 | $17,000 | $15,000 | $13,300 | $14,050 |
| 2015 | Vehicle detection system - microwave, remove, complete system (0660-3-60) | EACH | 1 | $316.50 | $450.00 | $350.00 | $330.00 | $348.00 |
| 2020 | Vehicle detection system- avi, bluetooth, furnish & install, cabinet equipment (0660-6121) | EACH | 1 | $878.50 | $1,200.00 | $1,000.00 | $900.00 | $967.00 |
| 2025 | Vehicle detection system- avi, bluetooth, furnish & install, above ground equipment (0660-6122) | EACH | 1 | $9,227.00 | $12,000 | $11,000 | $9,600.00 | $10,200 |
| 2030 | Vehicle detection system- avi, remove complete system (0660-6600) | EACH | 1 | $316.50 | $470.00 | $360.00 | $330.00 | $348.00 |
| 2035 | Vehicle detection system- wrong way for exit ramp, 1 or 2 lanes, AC powered (0660-7-21) | EACH | 3 | $67,520 | $95,000 | $78,000 | $70,500 | $74,300 |
| 2040 | Vehicle detection system- wrong way for exit ramp, 3 or more lanes, AC powered (0660-7-22) | EACH | 1 | $67,520 | $95,000 | $78,000 | $70,500 | $74,300 |
| 2045 | Traffic data detection system- microwave, furnish and install, cabinet equipment (0660-8-11) | EACH | 2 | $5,714.00 | $8,000.00 | $6,500.00 | $6,000.00 | $6,300.00 |
| 2050 | Traffic data detection system- microwave, furnish and install, above ground equipment (0660-8-12) | EACH | 3 | $9,504.00 | $13,000 | $11,000 | $10,000 | $10,500 |
| 2055 | ITS cabinet, furnish & install, pole mount with sunshield, 24" W X 46" H X 22" D (0676-2122) | EACH | 1 | $9,465.00 | $13,000 | $11,000 | $10,000 | $10,400 |
| 2060 | ITS cabinet, furnish & install, base mount, 334, 24" W X 66" H X 30" D (0676-2143) | EACH | 4 | $11,880 | $16,000 | $15,000 | $13,000 | $13,100 |
| 2065 | ITS cabinet- remove (0676-2600) | EACH | 3 | $1,298.00 | $1,800.00 | $1,500.00 | $1,400.00 | $1,430.00 |
| 2070 | Small equipment enclosure, furnish and install, less than 10"W X 13"H X 11" D (0676-3-10) | EACH | 1 | $1,270.00 | $1,700.00 | $1,400.00 | $1,400.00 | $1,400.00 |
| 2075 | ITS CCTV camera, F&I, dome enclosure - non-pressurized, high definition (0682-1133) | EACH | 1 | $4,837.00 | $6,500.00 | $5,500.00 | $5,000.00 | $5,400.00 |
| 2080 | Managed field ethernet switch, furnish & install (0684-1-1) | EACH | 5 | $7,573.00 | $10,000 | $8,600.00 | $8,000.00 | $8,300.00 |
| 2085 | Device server, furnish & install (0684-2-1) | EACH | 2 | $1,600.00 | $2,200.00 | $1,900.00 | $1,700.00 | $1,800.00 |
| 2090 | Uninterruptible power supply, furnish and install, line interactive (0685-1-11) | EACH | 7 | $5,187.00 | $7,000.00 | $6,000.00 | $5,500.00 | $5,700.00 |
| 2095 | Remote power management rpmu, furnish and install (0685-2-1) | EACH | 7 | $1,229.00 | $1,600.00 | $1,400.00 | $1,300.00 | $1,350.00 |
| 2100 | Walk-in dynamic message sign, furnish & install- with UPS full color, 201-300 SF (0700-9137) | EACH | 1 | $140,250 | $200,000 | $155,000 | $150,000 | $154,275 |
| 2105 | Walk-in dynamic message sign, remove (0700-9600) | EACH | 1 | $12,630 | $18,000 | $15,000 | $14,000 | $14,000 |
| 2110 | Load center, F&I, primary voltage (0715-7-12) | EACH | 1 | $16,890 | $23,000 | $20,000 | $17,500 | $18,600 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
Every contract let that day: FDOT letting of January 29, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.