Mastec Civil LLC: FDOT bid record
Mastec Civil LLC submitted 10 bids on Florida DOT contracts in the data, from 29 MAR 2023 to 24 SEP 2025, and was the low bidder on 3 of them (30%). When it was not low, its total sat a median +7.0% above the low bid.
- Owner
- Florida DOT
- Low bid volume
- $303,824,003
- Latest bid
- 24 SEP 2025
- Data through
- 28 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2023 | 3 | 0 | 0% |
| 2024 | 3 | 1 | 33% |
| 2025 | 4 | 2 | 50% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| District 4 | 6 | 2 | 33% |
| District 6 | 2 | 0 | 0% |
| District 5 | 1 | 0 | 0% |
| District 2 | 1 | 1 | 100% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Disputes review board, meeting- DO not bid | 0999-20-1 | DA | 9 | 9 (100%) | $3,900.00 | $3,900.00 |
| Disputes review board, hearing- DO not bid | 0999-20-2 | EACH | 9 | 9 (100%) | $4,500.00 | $4,500.00 |
| Conduit, furnish & install, directional bore | 0630-2-12 | LF | 27 | 5 (19%) | $45.00 | $30.82 |
| Pull & splice box, F&I, 13" X 24" cover size | 0635-2-11 | EACH | 25 | 4 (16%) | $1,740.00 | $1,150.00 |
| Junction box, furnish & install, embedded | 0635-3-13 | EACH | 21 | 4 (19%) | $1,300.00 | $822.50 |
| Fiber optic cable, remove, underground | 0633-1620 | LF | 8 | 4 (50%) | $1.20 | $1.15 |
| Floating turbidity barrier | 0104-11 | LF | 7 | 4 (57%) | $16.65 | $15.92 |
| Commercial material for temporary driveway maintenance | 0102-3 | CY | 6 | 4 (67%) | $68.50 | $80.00 |
| Conduit, furnish & install, aboveground | 0630-2-14 | LF | 12 | 3 (25%) | $51.00 | $36.00 |
| Regular excavation | 0120-1 | CY | 10 | 3 (30%) | $13.00 | $25.47 |
| Concrete class IV, bridge substructure | 0400-4-5 | CY | 9 | 3 (33%) | $2,400.00 | $1,700.00 |
| Temporary signalization and maintenance, intersection | 0102-104 | ED | 8 | 3 (38%) | $20.00 | $15.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Ohla USA Inc | 4 | 1 of 4 |
| Prince Contracting, LLC. | 4 | 1 of 4 |
| De Moya Asphalt Joint Venture | 3 | 1 of 3 |
| Webber, LLC | 3 | 0 of 3 |
| Halley Engineering Contractors, Inc. | 2 | 1 of 2 |
| Sema Construction, Inc. | 2 | 0 of 2 |
| GLF Posillico JV | 2 | 1 of 2 |
| Daniel O'Connell'S Sons | 2 | 1 of 2 |
| Ryan Inc. Southern | 1 | 1 of 1 |
| Archer Western Construction, LLC | 1 | 0 of 1 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 24 SEP 2025 | T2A24 | District 2 | SR 23 (FIRST COAST XWAY) FROM SR 9 (I-95) TO E OF CR 2209 | 1 of 8 | $205,250,003 | Low, 2.0% under the second |
| 30 APR 2025 | T5793 | District 5 | SR 9 (I-95) FROM MP 18.355 TO MP 19.552 | 5 of 7 | $76,194,013 | +26% |
| 26 FEB 2025 | T4691 | District 4 | SR 9 (I-95) AT SR 804 (BOYNTON BEACH BLVD) INTERCHANGE | 1 of 5 | $64,295,000 | Low, 3.0% under the second |
| 29 JAN 2025 | T4705 | District 4 | SR 838 (SUNRISE BLVD) FROM SR 9 (I-95) TO SR 5 (US 1) | 3 of 5 | $59,482,057 | +7.0% |
| 25 SEP 2024 | T4681 | District 4 | SR A1A FROM SHERMAN ST TO SR 822 (SHERIDAN ST), FROM ... | 1 of 1 | $34,279,000 | Low |
| 25 SEP 2024 | T4714 | District 4 | SR 5 (US 1) OVER EARMAN RIVER (C-17) BRIDGE NO 930003 | 5 of 5 | $18,498,931 | +35% |
| 15 MAY 2024 | T6539 | District 6 | SR 25 (OKEECHOBEE RD) AND SR 826 (PALMETTO EXPRESSWAY)... | 3 of 3 | $263,484,519 | +4.0% |
| 25 OCT 2023 | T6596 | District 6 | SR 90 (US 41 / SW 8 ST), OVER SR 90 (US 41 / SW 8 ST) AND .. | 2 of 3 | $37,998,394 | +1.0% |
| 26 APR 2023 | T4613 | District 4 | SR 710 (BEELINE HWY) | 3 of 8 | $150,313,742 | +1.0% |
| 29 MAR 2023 | T4639 | District 4 | CR 606 (OSLO RD) | 3 of 7 | $112,305,230 | +17% |
How this record was read
FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
- Every bid counted here matched its published total to within one dollar; FDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.