Sema Construction, Inc.: FDOT bid record

Sema Construction, Inc. submitted 40 bids on Florida DOT contracts in the data, from 31 JAN 2018 to 25 MAR 2026, and was the low bidder on 3 of them (8%). When it was not low, its total sat a median +24% above the low bid.

Owner
Florida DOT
Low bid volume
$128,233,000
Latest bid
25 MAR 2026
Data through
28 OCT 2026
40Bids
3Low bids
8Win rate, percent
+24%Median gap to the low bid when not low, 37 bids

By year

YearBidsLow bidsWin rate
201811218%
2019500%
2020200%
2021400%
2022200%
2023600%
2024400%
2025400%
20262150%
Sema Construction, Inc., FDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
District 52000%
District 26117%
District 7600%
District 15240%
District 4300%
Sema Construction, Inc., FDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Mowing0107-2ACRE3116 (52%)$45.00$80.65
Sediment barrier0104-10-3LF3914 (36%)$1.30$2.60
Litter removal0107-1ACRE2514 (56%)$30.00$52.98
Conduit, furnish & install, open trench0630-2-11LF5513 (24%)$12.00$16.54
Channelizing device- types I, II, VP, drum, or LCD0102-74-1ED3813 (34%)$0.10$0.13
Portable changeable message sign, temporary0102-99ED3813 (34%)$10.14$12.00
Disputes review board, meeting- DO not bid0999-20-1DA1313 (100%)$3,900.00$3,900.00
Disputes review board, hearing- DO not bid0999-20-2EACH1313 (100%)$4,500.00$4,500.00
Work zone sign0102-60ED3912 (31%)$0.25$0.25
Conduit, furnish & install, directional bore0630-2-12LF5111 (22%)$28.00$30.82
Floating turbidity barrier0104-11LF2911 (38%)$11.00$15.92
Single post sign, remove0700-1-60AS3010 (33%)$36.00$31.94
Sema Construction, Inc., FDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Sema Construction, Inc., FDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
25 MAR 2026T1920District 1SR 684 FROM SR 789 (GULF DR) TO W OF 123 ST W1 of 6$123,000,000Low, 2.0% under the second
28 JAN 2026T5875District 5SR 5 (US 1) OVER PELLICER CREEK, BRIDE NOS 730076 AND 7300773 of 6$14,295,000+14%
03 DEC 2025T4729District 4SR A1A (JIMMY BUFFETT MEMORIAL HWY) OVER SEBASTIAN INLET4 of 8$137,600,000+35%
30 JUL 2025T5819District 5SR 33 (CR 33) FROM S OF EDGEWOOD BOYS RANCH RD TO S OF WRIGH5 of 8$7,310,000+47%
30 APR 2025T5793District 5SR 9 (I-95) FROM MP 18.355 TO MP 19.5527 of 7$81,220,000+35%
26 MAR 2025T5836District 5SR 60 FROM BLANKET BAY SLOUGH TO PEAVINE TR6 of 7$24,790,000+35%
28 AUG 2024T1874District 1CR 664, BRIDGE NO 060034 OVER LITTLE PAYNE CREEK8 of 8$4,980,000+79%
28 AUG 2024T5830District 5SR 5 NB (US 1) OVER TURNBULL CREEK, BRIDGE NO 7902556 of 8$8,145,000+46%
12 JUN 2024T7532District 7SR 60 (CCAMPBELL) FROM CCAMPBELL TR TO BAYSHORE TR4 of 5$19,545,000+28%
24 APR 2024T1850District 1CR 664 (COUNTYLINE RD) OVER PEACE RIVER, BRIDGE NO 1601018 of 8$8,470,000+60%
14 JUN 2023T1861District 1LEGACY TRAIL4 of 6$14,990,000+17%
14 JUN 2023T5792District 5SR 15 (US 17)2 of 4$18,760,000+24%
24 MAY 2023T5789District 5SR 4716 of 6$9,875,000+17%
29 MAR 2023T4639District 4CR 606 (OSLO RD)6 of 7$122,447,566+28%
22 FEB 2023T4640District 4CR 6123 of 4$7,385,000+6.0%
25 JAN 2023T5777District 5GALAXY WAY2 of 9$23,570,000+3.0%
15 JUN 2022T5724District 5SR 400 (I-4)2 of 5$83,721,000+1.0%
23 FEB 2022T5743District 5BARRACUDA BLVD AND BR NO 7957002 of 5$5,100,000+16%
25 AUG 2021T5735District 5NASA CAUSEWAY9 of 9$200,981,274+61%
26 MAY 2021T5736District 5SR 426/CR 4196 of 6$28,250,000+41%
27 JAN 2021T5711District 5SR 519 (FISKE BLVD)4 of 4$9,955,000+13%
27 JAN 2021T5715District 5CR 5326 of 6$10,438,691+16%
18 NOV 2020T2792District 2CR 3614 of 4$5,975,000+117%
18 NOV 2020T7449District 7MORRIS BRIDGE - BIKE PATH/TRAIL12 of 12$6,942,476+56%
04 DEC 2019T2752District 2CR 2315 of 5$9,230,000+44%
Sema Construction, Inc.: latest FDOT bids in the data

How this record was read

FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.

  • Every bid counted here matched its published total to within one dollar; FDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy