Vecellio & Grogan, Inc.: FDOT bid record
Vecellio & Grogan, Inc. submitted 42 bids on Florida DOT contracts in the data, from 13 JUN 2018 to 20 MAY 2026, and was the low bidder on 4 of them (10%). When it was not low, its total sat a median +18% above the low bid.
- Owner
- Florida DOT
- Low bid volume
- $158,920,405
- Latest bid
- 20 MAY 2026
- Data through
- 28 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2018 | 2 | 0 | 0% |
| 2019 | 10 | 0 | 0% |
| 2020 | 5 | 1 | 20% |
| 2021 | 7 | 1 | 14% |
| 2022 | 3 | 1 | 33% |
| 2023 | 2 | 0 | 0% |
| 2024 | 5 | 0 | 0% |
| 2025 | 5 | 1 | 20% |
| 2026 | 3 | 0 | 0% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| District 2 | 15 | 1 | 7% |
| District 3 | 9 | 2 | 22% |
| District 1 | 5 | 0 | 0% |
| District 4 | 5 | 1 | 20% |
| District 7 | 4 | 0 | 0% |
| District 5 | 4 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Guardrail removal | 0536-73 | LF | 30 | 11 (37%) | $2.94 | $3.00 |
| Disputes review board, meeting- DO not bid | 0999-20-1 | DA | 11 | 11 (100%) | $3,900.00 | $3,900.00 |
| Disputes review board, hearing- DO not bid | 0999-20-2 | EACH | 11 | 11 (100%) | $4,500.00 | $4,500.00 |
| Channelizing device- types I, II, VP, drum, or LCD | 0102-74-1 | ED | 40 | 10 (25%) | $0.15 | $0.13 |
| Floating turbidity barrier | 0104-11 | LF | 36 | 10 (28%) | $15.00 | $15.92 |
| Work zone sign | 0102-60 | ED | 42 | 9 (21%) | $0.25 | $0.25 |
| Bridge deck expansion joint, construction, F&I poured joint with backer rod | 0458-1-11 | LF | 34 | 9 (26%) | $59.95 | $65.00 |
| Optional base, base group 01 | 0285-701 | SY | 26 | 9 (35%) | $19.50 | $24.00 |
| Concrete class IV, bridge substructure | 0400-4-5 | CY | 35 | 8 (23%) | $2,000.00 | $1,700.00 |
| Sediment barrier | 0104-10-3 | LF | 42 | 7 (17%) | $3.28 | $2.60 |
| Regular excavation | 0120-1 | CY | 42 | 7 (17%) | $23.00 | $25.47 |
| Portable changeable message sign, temporary | 0102-99 | ED | 40 | 7 (18%) | $12.00 | $12.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Superior Construction Company Southeast, LLC | 30 | 15 of 30 |
| Anderson Columbia Co., Inc. | 15 | 13 of 15 |
| GDB-US Constructors, Inc. | 11 | 6 of 11 |
| Sema Construction, Inc. | 10 | 3 of 10 |
| Kiewit Infrastructure South Co. | 10 | 2 of 10 |
| Granite Construction Company of California | 8 | 5 of 8 |
| Commercial Industrial Corp. | 7 | 4 of 7 |
| Prince Contracting, LLC. | 6 | 2 of 6 |
| Johnson Bros. Corporation, A Southland Company | 6 | 1 of 6 |
| Coxwell, J.B. Contracting, Inc. | 5 | 3 of 5 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 20 MAY 2026 | T2A68 | District 2 | CR 357 OVER SHIRED CREEK, BRIDGE NO 300043 | 2 of 4 | $12,123,571 | +39% |
| 25 MAR 2026 | T1920 | District 1 | SR 684 FROM SR 789 (GULF DR) TO W OF 123 ST W | 4 of 6 | $129,936,044 | +6.0% |
| 28 JAN 2026 | T5875 | District 5 | SR 5 (US 1) OVER PELLICER CREEK, BRIDE NOS 730076 AND 730077 | 5 of 6 | $15,797,898 | +26% |
| 03 DEC 2025 | T2A53 | District 2 | SR 5A (SR A1A / AVENIDA MENENDEZ) FROM BRIDGE OF LIONS TO... | 1 of 8 | $19,965,843 | Low, 22% under the second |
| 03 DEC 2025 | T4729 | District 4 | SR A1A (JIMMY BUFFETT MEMORIAL HWY) OVER SEBASTIAN INLET | 3 of 8 | $117,763,123 | +15% |
| 11 JUN 2025 | T2A25 | District 2 | SR A1A FROM GATE 5 NAVAL STATION MAYPORT TO S OF US COAST... | 2 of 5 | $1,529,811 | +3.0% |
| 11 JUN 2025 | T2A26 | District 2 | SR A1A FROM S OF OCEAN SANDS TO S OF CARCABA RD | 3 of 6 | $4,280,470 | +14% |
| 30 APR 2025 | T2A28 | District 2 | SR 5A (US 1/KING ST) OVER SAN SEBASTIAN RIVER BRIDGE NO... | 5 of 8 | $15,137,321 | +13% |
| 25 SEP 2024 | T4714 | District 4 | SR 5 (US 1) OVER EARMAN RIVER (C-17) BRIDGE NO 930003 | 4 of 5 | $15,943,730 | +16% |
| 28 AUG 2024 | T1874 | District 1 | CR 664, BRIDGE NO 060034 OVER LITTLE PAYNE CREEK | 7 of 8 | $4,609,740 | +66% |
| 28 AUG 2024 | T5830 | District 5 | SR 5 NB (US 1) OVER TURNBULL CREEK, BRIDGE NO 790255 | 7 of 8 | $8,559,487 | +53% |
| 12 JUN 2024 | T7532 | District 7 | SR 60 (CCAMPBELL) FROM CCAMPBELL TR TO BAYSHORE TR | 3 of 5 | $17,645,163 | +15% |
| 24 APR 2024 | T1850 | District 1 | CR 664 (COUNTYLINE RD) OVER PEACE RIVER, BRIDGE NO 160101 | 4 of 8 | $6,373,008 | +21% |
| 27 SEP 2023 | T4615 | District 4 | SR-5 (US 1) FROM SR 580 (NORTHLAKE BLVD) OVER EARMAN RIVER.. | 2 of 2 | $19,096,985 | +50% |
| 22 FEB 2023 | T2891 | District 2 | SR 9 (I-95) | 4 of 5 | $101,929,917 | +28% |
| 16 NOV 2022 | T2902 | District 2 | 180TH ST | 2 of 3 | $3,675,320 | +2.0% |
| 12 JAN 2022 | T2863 | District 2 | SR 5 (US 17/MAIN ST) | 3 of 3 | $15,142,087 | +8.0% |
| 12 JAN 2022 | T4583 | District 4 | SR A1A (NORTH CAUSEWAY) | 1 of 7 | $111,595,618 | Low, 2.0% under the second |
| 25 AUG 2021 | T5735 | District 5 | NASA CAUSEWAY | 2 of 9 | $139,308,387 | +12% |
| 09 JUN 2021 | T3705 | District 3 | SR 10 (US 90) | 1 of 5 | $21,786,584 | Low, 2.0% under the second |
| 09 JUN 2021 | T3728 | District 3 | SR 22 | 3 of 5 | $6,393,232 | +16% |
| 09 JUN 2021 | T4564 | District 4 | SR 5 (US 1) AND SR 811 (ALT A1A) | 2 of 8 | $124,956,059 | +2.0% |
| 26 MAY 2021 | T7472 | District 7 | SR 93 (I-275) | 3 of 6 | $89,915,543 | +5.0% |
| 27 JAN 2021 | T2816 | District 2 | CR 200A | 3 of 3 | $5,291,005 | +25% |
| 27 JAN 2021 | T7458 | District 7 | SR 55 (US 19) | 2 of 5 | $8,479,800 | +7.0% |
How this record was read
FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
- Every bid counted here matched its published total to within one dollar; FDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.