FDOT contract T2A53 bid tabulation
SR 5A (SR A1A / AVENIDA MENENDEZ) FROM BRIDGE OF LIONS TO... Let by Florida DOT on December 3, 2025, St Johns, District 2. 8 bids received; low bid $19,965,843 by Vecellio & Grogan, Inc..
- Owner
- Florida DOT
- Letting
- 03 DEC 2025
- Pay items
- 87
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Vecellio & Grogan, Inc. | $19,965,843 | Low |
| 2 | RJ Gorman Contracting LLC | $24,305,013 | +22% |
| 3 | Tic - the Industrial Company | $25,443,585 | +27% |
| 4 | Southern Road & Bridge, LLC | $27,478,069 | +38% |
| 5 | Superior Construction Company Southeast, LLC | $28,928,363 | +45% |
| 6 | Coxwell, J.B. Contracting, Inc. | $35,725,945 | +79% |
| 7 | Watson Civil Construction, Inc. | $40,714,249 | +104% |
| 8 | Masci General Contractors, Inc | $43,592,112 | +118% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Vecellio & Grogan, Inc. | 2. RJ Gorman Contracting LLC | 3. Tic - the Industrial Company | 4. Southern Road & Bridge, LLC | 5. Superior Construction Company Southeast, LLC | 6. Coxwell, J.B. Contracting, Inc. |
|---|---|---|---|---|---|---|---|---|---|
| 0005 | Removal of existing structures/bridges (0110-3) | SF | 1 | $246,500 | $75,000 | $100,000 | $526,000 | $1,000,000 | $46,700 |
| 0010 | Excavation for structures excavation for fascia (0125-1) | CY | 267.70 | $649.00 | $32.00 | $150.00 | $400.00 | $835.00 | $575.00 |
| 0015 | Conc class II, bridge superstructure sleeper beam (0400-2-4) | CY | 38.60 | $1,700.00 | $1,300.00 | $4,000.00 | $9,852.00 | $4,850.00 | $3,050.00 |
| 0020 | Concrete class IV, bridge substructure lion pedestal foundation, parapet wall at wall closure (0400-4-5) | CY | 3.70 | $2,565.00 | $4,000.00 | $6,000.00 | $5,200.00 | $5,900.00 | $13,300 |
| 0025 | Concrete class V, bridge substructure seawall cap beam, fascia concrete, cap at outfalls (0400-8-5) | CY | 1,294.10 | $1,810.00 | $1,100.00 | $4,315.00 | $1,823.00 | $1,875.00 | $3,395.00 |
| 0030 | Coquina concrete, promenade slabs (0400-45-6) | SY | 2,080 | $108.00 | $100.00 | $300.00 | $198.00 | $800.00 | $342.00 |
| 0035 | Coquina concrete, precast (0400-45-7) | LF | 3,091 | $717.00 | $710.00 | $405.00 | $500.00 | $800.00 | $1,724.00 |
| 0040 | Non shrink grout, F&I, miscellaneous- structures rehab closure pours (0400-153) | CF | 1,470 | $148.00 | $375.00 | $85.00 | $100.00 | $400.00 | $40.00 |
| 0045 | Reinforcing steel- bridge substructure epoxy dowel at outfall (0415-1-5) | LB | 296 | $6.50 | $120.00 | $140.00 | $40.00 | $40.00 | $92.00 |
| 0050 | Fiber reinforced polymer bars, #4 bar (0415-10-4) | LF | 93,157 | $2.50 | $2.30 | $2.25 | $2.25 | $3.00 | $1.52 |
| 0055 | Fiber reinforced polymer bars, #5 bar (0415-10-5) | LF | 62,525 | $2.40 | $2.30 | $2.35 | $1.94 | $4.00 | $1.42 |
| 0060 | Fiber reinforced polymer bars, #6 bar (0415-10-6) | LF | 122,193 | $2.80 | $2.30 | $3.15 | $2.50 | $3.25 | $2.11 |
| 0065 | Fiber reinforced polymer bars, #9 bar (0415-10-9) | LF | 54,992 | $4.20 | $2.30 | $5.00 | $3.50 | $4.50 | $4.11 |
| 0070 | Prest soil anchors (0451-70) | EACH | 152 | $12,060 | $12,000 | $27,500 | $11,113 | $5,700.00 | $13,015 |
| 0075 | Prestressed soil anchor, performance test (0451-70-1) | EACH | 17 | $1,610.00 | $12,500 | $3,500.00 | $1,620.00 | $425.00 | $2,685.00 |
| 0080 | Prestressed soil anchor, test (0451-70-2) | EACH | 9 | $6,435.00 | $18,500 | $17,500 | $6,480.00 | $3,600.00 | $6,500.00 |
| 0085 | Anchor bar, steel (0455-87) | EACH | 10 | $1,370.00 | $27,750 | $5,000.00 | $1,380.00 | $3,344.00 | $2,938.00 |
| 0090 | Steel sheet piling, press-in method required (0455-133210) | SF | 52,663 | $103.00 | $176.50 | $105.00 | $161.44 | $86.00 | $261.50 |
| 0095 | Struct steel, carbon (0460-2-1) | LB | 1 | $302,000 | $330,000 | $900,000 | $2,100,000 | $422,714 | $264,365 |
| 0100 | Mobilization (0101-1) | LS | 1 | $2,000,000 | $2,395,000 | $1,959,005 | $3,000,000 | $2,850,000 | $4,581,160 |
| 0105 | Maintenance of traffic (0102-1) | DA | 1 | $336,000 | $210,000 | $130,000 | $500,000 | $500,000 | $762,350 |
| 0110 | Work zone sign (0102-60) | ED | 8,760 | $0.25 | $0.30 | $0.25 | $0.26 | $0.25 | $0.24 |
| 0115 | Channelizing device- types I, II, VP, drum, or LCD (0102-74-1) | ED | 3,160 | $0.10 | $0.15 | $1.30 | $0.10 | $0.10 | $0.11 |
| 0120 | Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8) | FD | 33,553 | $0.05 | $0.10 | $0.50 | $0.36 | $0.05 | $0.06 |
| 0125 | Arrow board / advance warning arrow panel (0102-76) | ED | 59 | $6.00 | $7.00 | $150.00 | $7.20 | $6.00 | $7.35 |
| 0130 | Sediment barrier (0104-10-3) | LF | 547 | $3.55 | $10.00 | $4.50 | $9.60 | $8.50 | $46.00 |
| 0135 | Floating turbidity barrier (0104-11) | LF | 3,353 | $17.70 | $38.00 | $20.00 | $29.50 | $34.00 | $42.25 |
| 0140 | Inlet protection system (0104-18) | EACH | 7 | $175.00 | $300.00 | $250.00 | $1,200.00 | $1,000.00 | $105.00 |
| 0145 | Litter removal (0107-1) | ACRE | 41.47 | $118.00 | $55.00 | $30.00 | $2,520.00 | $1,050.00 | $750.00 |
| 0150 | Mowing (0107-2) | ACRE | 16.23 | $943.00 | $300.00 | $125.00 | $1,020.00 | $2,500.00 | $540.00 |
| 0155 | Monitor existing structures- inspection and settlement monitoring (0108-1) | LS | 1 | $8,255.00 | $70,000 | $55,000 | $18,000 | $60,000 | $7,350.00 |
| 0160 | Monitor existing structures- vibration monitoring (0108-2) | LS | 1 | $19,000 | $70,000 | $85,000 | $37,200 | $60,000 | $9,975.00 |
| 0165 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $356,000 | $31,000 | $500,000 | $407,000 | $4,591,479 | $256,500 |
| 0170 | Selective clearing and areas with trees to remain (0110-2-2) | ACRE | 0.94 | $57,400 | $24,000 | $85,000 | $35,000 | $35,000 | $5,800.00 |
| 0175 | Removal of existing concrete (0110-4-10) | SY | 3,307 | $44.00 | $23.00 | $55.00 | $167.00 | $750.00 | $97.75 |
| 0180 | Plugging water wells, artesian (0110-5) | EACH | 1 | $5,895.00 | $12,500 | $15,000 | $54,000 | $16,000 | $6,300.00 |
| 0185 | Underwater debris removal (0110-8-3) | CY | 96.60 | $1,342.00 | $260.00 | $250.00 | $4,500.00 | $750.00 | $665.00 |
| 0190 | Tree protection barrier (0110-21) | LF | 87 | $4.70 | $120.00 | $10.00 | $10.00 | $20.00 | $10.50 |
| 0195 | Remove & dispose of timber (0110-82) | MB | 4.10 | $8,470.01 | $1,250.00 | $10,000 | $30,000 | $5,000.00 | $11,026 |
| 0200 | Regular excavation (0120-1) | CY | 1,527.80 | $56.70 | $28.00 | $40.00 | $42.00 | $43.00 | $23.36 |
| 0205 | Embankment (0120-6) | CY | 1,043.90 | $110.00 | $41.00 | $35.00 | $78.00 | $79.00 | $51.80 |
| 0210 | Manholes, P-7, <10' (0425-2-41) | EACH | 2 | $17,727 | $12,200 | $15,000 | $4,200.00 | $19,750 | $7,015.00 |
| 0215 | Manholes, J-7, <10' (0425-2-71) | EACH | 3 | $17,727 | $17,500 | $20,000 | $7,800.00 | $26,150 | $10,100 |
| 0220 | Valve boxes, adjust (0425-6) | EACH | 2 | $1,181.79 | $1,200.00 | $3,500.00 | $2,520.00 | $1,000.00 | $637.38 |
| 0225 | Special drainage, nutrient separating baffle box, 8' X 16' , with observation cover (0425-100-35) | EACH | 1 | $177,267 | $9,000.00 | $200,000 | $6,600.00 | $180,000 | $137,110 |
| 0230 | Pipe culvert,optional material,round, 24"S/CD (0430-175124) | LF | 42 | $354.54 | $221.00 | $245.00 | $90.00 | $1,025.00 | $480.00 |
| 0235 | Pipe culvert, opt material, round, 42"S/CD (0430-175142) | LF | 45 | $531.80 | $465.00 | $425.00 | $150.00 | $1,475.00 | $545.00 |
| 0240 | Pipe culvert, opt material, round, 48"S/CD (0430-175148) | LF | 16 | $590.89 | $590.00 | $750.00 | $210.00 | $2,025.00 | $790.00 |
| 0245 | Flap gates, 0-24" (0430-880-01) | EACH | 2 | $17,727 | $12,500 | $10,000 | $4,260.00 | $16,400 | $12,650 |
| 0250 | Flap gates, 37-48" (0430-880-03) | EACH | 2 | $64,998 | $107,250 | $10,500 | $7,860.00 | $38,600 | $52,140 |
| 0255 | Manatee grate for 24" pipe, unhinged (0430-886-24) | EACH | 2 | $3,512.81 | $6,000.00 | $5,000.00 | $9,000.00 | $7,150.00 | $6,250.00 |
| 0260 | Manatee grate for 42" pipe, unhinged (0430-886-42) | EACH | 1 | $4,116.91 | $7,200.00 | $5,000.00 | $14,400 | $12,650 | $5,850.00 |
| 0265 | Manatee grate for 48", (0430-886-48) | EACH | 1 | $4,486.09 | $7,500.00 | $5,000.00 | $18,000 | $13,500 | $7,200.00 |
| 0270 | Pedestrian/ bicycle railing, aluminum only,42" type 1 (0515-2311) | LF | 226 | $195.00 | $370.00 | $120.00 | $390.00 | $84.00 | $126.00 |
| 0275 | Pedestrian / bicycle railing, metal stanchions with chain guard (0515-20100) | EACH | 9 | $788.00 | $350.00 | $1,000.00 | $1,740.00 | $1,450.00 | $525.00 |
| 0280 | Concrete curb, historic (0520-2120) | LF | 318 | $120.00 | $100.00 | $180.00 | $54.00 | $80.00 | $134.00 |
| 0285 | Coquina concrete sidewalk and driveways, 4" thick (0522-1108) | SY | 1,354 | $141.00 | $520.00 | $150.00 | $225.00 | $100.00 | $117.00 |
| 0290 | Coquina concrete sidewalk and driveways, 6" thick (0522-2101) | SY | 360 | $108.00 | $520.00 | $205.00 | $310.00 | $125.00 | $250.00 |
| 0295 | Detectable warnings (0527-2) | SF | 16 | $50.00 | $110.00 | $450.00 | $120.00 | $38.50 | $120.00 |
| 0300 | Fencing, type B, 7.1-8.0', standard (0550-10240) | LF | 1,088 | $20.00 | $45.00 | $60.00 | $120.00 | $43.00 | $16.80 |
| 0305 | Fencing, type B, 7.1-8.0, reset existing (0550-10248) | LF | 895 | $10.60 | $45.00 | $25.00 | $90.00 | $14.50 | $12.60 |
| 0310 | Fence gate, tubular metal pipe, double, 18.1-20.0' opening (0550-60524) | EACH | 1 | $1,060.00 | $6,800.00 | $10,000 | $7,800.00 | $6,490.00 | $4,200.00 |
| 0315 | Performance turf, sod (0570-1-2) | SY | 2,083 | $12.00 | $7.00 | $10.00 | $5.40 | $20.00 | $6.30 |
| 0320 | Biosorption activated media, bam- for infiltration (0917-532-10) | CY | 3 | $350.00 | $6,000.00 | $1,250.00 | $1,200.00 | $1,800.00 | $700.00 |
| 0325 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $150,000 | $150,000 | $150,000 | $150,000 | $150,000 | $150,000 |
| 0330 | Single column ground sign assembly, relocate (0700-1500) | EACH | 10 | $870.00 | $340.00 | $250.00 | $888.00 | $740.00 | $777.00 |
| 0335 | Multi-column ground sign assembly, relocate (0700-2500) | EACH | 3 | $12,310 | $12,000 | $1,000.00 | $12,528 | $11,300 | $10,962 |
| 0340 | Sign panel, furnish & install ground mount, UP to 12 SF (0700-3101) | EACH | 5 | $665.00 | $400.00 | $1,500.00 | $679.20 | $566.00 | $595.00 |
| 0345 | Sign panel, remove, UP to 12 SF (0700-3601) | EACH | 5 | $47.00 | $40.00 | $100.00 | $48.00 | $40.00 | $42.00 |
| 0350 | Signs- monument, remove existing and reinstall (0700-25-18) | EACH | 24 | $470.00 | $260.00 | $250.00 | $6,000.00 | $1,275.00 | $210.00 |
| 0355 | Concrete class IV, bridge substructure (0400-4-5) | CY | 27.90 | $3,530.00 | $1,600.00 | $3,000.00 | $3,500.00 | $2,250.00 | $560.00 |
| 0360 | Reinforcing steel- bridge substructure (0415-1-5) | LB | 4,646 | $3.80 | $2.00 | $3.50 | $9.00 | $2.00 | $1.27 |
| 0365 | Conduit, furnish & install, open trench (0630-2-11) | LF | 2,275 | $17.80 | $26.00 | $14.80 | $25.80 | $18.00 | $21.54 |
| 0370 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 185 | $28.45 | $62.00 | $23.65 | $60.00 | $83.00 | $86.33 |
| 0375 | Conduit, furnish & install, aboveground (0630-2-14) | LF | 54 | $27.35 | $45.00 | $22.70 | $43.80 | $120.00 | $121.16 |
| 0380 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 22 | $2,670.00 | $3,700.00 | $2,220.00 | $3,630.00 | $704.00 | $730.00 |
| 0385 | Lighting conductors, F&I, insulated, no. 10 or < (0715-1-11) | LF | 592 | $1.25 | $2.00 | $1.00 | $1.92 | $3.50 | $3.44 |
| 0390 | Lighting conductors, F&I, insulated, no.8 - 6 (0715-1-12) | LF | 3,216 | $2.40 | $4.50 | $2.00 | $4.56 | $4.25 | $5.04 |
| 0395 | Light pole complete, relocate (0715-68000) | EACH | 8 | $10,385 | $40,000 | $15,000 | $41,795 | $10,200 | $10,565 |
| 0400 | Pole cable distribution system, furnish and install, conventional (0715-500-1) | EACH | 26 | $945.00 | $1,450.00 | $785.00 | $1,314.00 | $925.00 | $960.00 |
| 0405 | Light pole complete- special design, F&I ,pole top mount, concrete, 10' (0715-516310) | EACH | 26 | $12,500 | $18,000 | $20,000 | $16,464 | $6,360.00 | $6,628.00 |
| 0410 | Irrigation sleeve, 6" diameter (0591-1600) | LF | 176 | $30.00 | $25.00 | $25.00 | $60.00 | $45.00 | $11.85 |
| 0415 | Utility work- jpa/utility agreement, water (1000-6) | LS | 1 | $229,673 | $601,128 | $69,080 | $266,475 | $323,400 | $65,913 |
| 0420 | Architectural- special, furnish and install timber pergola (0751-11101) | LS | 1 | $176,500 | $75,000 | $150,000 | $215,000 | $170,000 | $88,350 |
| 0425 | Bicycle rack, furnish & install, 2 bicycles (0751-36-11) | EACH | 4 | $2,130.00 | $3,900.00 | $2,000.00 | $14,550 | $1,100.00 | $1,525.00 |
| 0430 | Bench, F&I, concrete (0751-38-13) | EACH | 20 | $9,465.00 | $3,600.00 | $4,000.00 | $5,100.00 | $4,190.00 | $2,355.00 |
| 0435 | Fiber optic cable locator (0633-6) | DA | 400 | $291.00 | $400.00 | $240.00 | $478.00 | $60.00 | $60.46 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
Every contract let that day: FDOT letting of December 3, 2025. Compiled by Mirage Metrics.