FDOT contract T2A53 bid tabulation

SR 5A (SR A1A / AVENIDA MENENDEZ) FROM BRIDGE OF LIONS TO... Let by Florida DOT on December 3, 2025, St Johns, District 2. 8 bids received; low bid $19,965,843 by Vecellio & Grogan, Inc..

Owner
Florida DOT
Letting
03 DEC 2025
Pay items
87
Data through
28 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Vecellio & Grogan, Inc.$19,965,843Low
2RJ Gorman Contracting LLC$24,305,013+22%
3Tic - the Industrial Company$25,443,585+27%
4Southern Road & Bridge, LLC$27,478,069+38%
5Superior Construction Company Southeast, LLC$28,928,363+45%
6Coxwell, J.B. Contracting, Inc.$35,725,945+79%
7Watson Civil Construction, Inc.$40,714,249+104%
8Masci General Contractors, Inc$43,592,112+118%
FDOT contract T2A53: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Vecellio & Grogan, Inc.2. RJ Gorman Contracting LLC3. Tic - the Industrial Company4. Southern Road & Bridge, LLC5. Superior Construction Company Southeast, LLC6. Coxwell, J.B. Contracting, Inc.
0005Removal of existing structures/bridges (0110-3)SF1$246,500$75,000$100,000$526,000$1,000,000$46,700
0010Excavation for structures excavation for fascia (0125-1)CY267.70$649.00$32.00$150.00$400.00$835.00$575.00
0015Conc class II, bridge superstructure sleeper beam (0400-2-4)CY38.60$1,700.00$1,300.00$4,000.00$9,852.00$4,850.00$3,050.00
0020Concrete class IV, bridge substructure lion pedestal foundation, parapet wall at wall closure (0400-4-5)CY3.70$2,565.00$4,000.00$6,000.00$5,200.00$5,900.00$13,300
0025Concrete class V, bridge substructure seawall cap beam, fascia concrete, cap at outfalls (0400-8-5)CY1,294.10$1,810.00$1,100.00$4,315.00$1,823.00$1,875.00$3,395.00
0030Coquina concrete, promenade slabs (0400-45-6)SY2,080$108.00$100.00$300.00$198.00$800.00$342.00
0035Coquina concrete, precast (0400-45-7)LF3,091$717.00$710.00$405.00$500.00$800.00$1,724.00
0040Non shrink grout, F&I, miscellaneous- structures rehab closure pours (0400-153)CF1,470$148.00$375.00$85.00$100.00$400.00$40.00
0045Reinforcing steel- bridge substructure epoxy dowel at outfall (0415-1-5)LB296$6.50$120.00$140.00$40.00$40.00$92.00
0050Fiber reinforced polymer bars, #4 bar (0415-10-4)LF93,157$2.50$2.30$2.25$2.25$3.00$1.52
0055Fiber reinforced polymer bars, #5 bar (0415-10-5)LF62,525$2.40$2.30$2.35$1.94$4.00$1.42
0060Fiber reinforced polymer bars, #6 bar (0415-10-6)LF122,193$2.80$2.30$3.15$2.50$3.25$2.11
0065Fiber reinforced polymer bars, #9 bar (0415-10-9)LF54,992$4.20$2.30$5.00$3.50$4.50$4.11
0070Prest soil anchors (0451-70)EACH152$12,060$12,000$27,500$11,113$5,700.00$13,015
0075Prestressed soil anchor, performance test (0451-70-1)EACH17$1,610.00$12,500$3,500.00$1,620.00$425.00$2,685.00
0080Prestressed soil anchor, test (0451-70-2)EACH9$6,435.00$18,500$17,500$6,480.00$3,600.00$6,500.00
0085Anchor bar, steel (0455-87)EACH10$1,370.00$27,750$5,000.00$1,380.00$3,344.00$2,938.00
0090Steel sheet piling, press-in method required (0455-133210)SF52,663$103.00$176.50$105.00$161.44$86.00$261.50
0095Struct steel, carbon (0460-2-1)LB1$302,000$330,000$900,000$2,100,000$422,714$264,365
0100Mobilization (0101-1)LS1$2,000,000$2,395,000$1,959,005$3,000,000$2,850,000$4,581,160
0105Maintenance of traffic (0102-1)DA1$336,000$210,000$130,000$500,000$500,000$762,350
0110Work zone sign (0102-60)ED8,760$0.25$0.30$0.25$0.26$0.25$0.24
0115Channelizing device- types I, II, VP, drum, or LCD (0102-74-1)ED3,160$0.10$0.15$1.30$0.10$0.10$0.11
0120Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8)FD33,553$0.05$0.10$0.50$0.36$0.05$0.06
0125Arrow board / advance warning arrow panel (0102-76)ED59$6.00$7.00$150.00$7.20$6.00$7.35
0130Sediment barrier (0104-10-3)LF547$3.55$10.00$4.50$9.60$8.50$46.00
0135Floating turbidity barrier (0104-11)LF3,353$17.70$38.00$20.00$29.50$34.00$42.25
0140Inlet protection system (0104-18)EACH7$175.00$300.00$250.00$1,200.00$1,000.00$105.00
0145Litter removal (0107-1)ACRE41.47$118.00$55.00$30.00$2,520.00$1,050.00$750.00
0150Mowing (0107-2)ACRE16.23$943.00$300.00$125.00$1,020.00$2,500.00$540.00
0155Monitor existing structures- inspection and settlement monitoring (0108-1)LS1$8,255.00$70,000$55,000$18,000$60,000$7,350.00
0160Monitor existing structures- vibration monitoring (0108-2)LS1$19,000$70,000$85,000$37,200$60,000$9,975.00
0165Clearing & grubbing (0110-1-1)ACRE1$356,000$31,000$500,000$407,000$4,591,479$256,500
0170Selective clearing and areas with trees to remain (0110-2-2)ACRE0.94$57,400$24,000$85,000$35,000$35,000$5,800.00
0175Removal of existing concrete (0110-4-10)SY3,307$44.00$23.00$55.00$167.00$750.00$97.75
0180Plugging water wells, artesian (0110-5)EACH1$5,895.00$12,500$15,000$54,000$16,000$6,300.00
0185Underwater debris removal (0110-8-3)CY96.60$1,342.00$260.00$250.00$4,500.00$750.00$665.00
0190Tree protection barrier (0110-21)LF87$4.70$120.00$10.00$10.00$20.00$10.50
0195Remove & dispose of timber (0110-82)MB4.10$8,470.01$1,250.00$10,000$30,000$5,000.00$11,026
0200Regular excavation (0120-1)CY1,527.80$56.70$28.00$40.00$42.00$43.00$23.36
0205Embankment (0120-6)CY1,043.90$110.00$41.00$35.00$78.00$79.00$51.80
0210Manholes, P-7, <10' (0425-2-41)EACH2$17,727$12,200$15,000$4,200.00$19,750$7,015.00
0215Manholes, J-7, <10' (0425-2-71)EACH3$17,727$17,500$20,000$7,800.00$26,150$10,100
0220Valve boxes, adjust (0425-6)EACH2$1,181.79$1,200.00$3,500.00$2,520.00$1,000.00$637.38
0225Special drainage, nutrient separating baffle box, 8' X 16' , with observation cover (0425-100-35)EACH1$177,267$9,000.00$200,000$6,600.00$180,000$137,110
0230Pipe culvert,optional material,round, 24"S/CD (0430-175124)LF42$354.54$221.00$245.00$90.00$1,025.00$480.00
0235Pipe culvert, opt material, round, 42"S/CD (0430-175142)LF45$531.80$465.00$425.00$150.00$1,475.00$545.00
0240Pipe culvert, opt material, round, 48"S/CD (0430-175148)LF16$590.89$590.00$750.00$210.00$2,025.00$790.00
0245Flap gates, 0-24" (0430-880-01)EACH2$17,727$12,500$10,000$4,260.00$16,400$12,650
0250Flap gates, 37-48" (0430-880-03)EACH2$64,998$107,250$10,500$7,860.00$38,600$52,140
0255Manatee grate for 24" pipe, unhinged (0430-886-24)EACH2$3,512.81$6,000.00$5,000.00$9,000.00$7,150.00$6,250.00
0260Manatee grate for 42" pipe, unhinged (0430-886-42)EACH1$4,116.91$7,200.00$5,000.00$14,400$12,650$5,850.00
0265Manatee grate for 48", (0430-886-48)EACH1$4,486.09$7,500.00$5,000.00$18,000$13,500$7,200.00
0270Pedestrian/ bicycle railing, aluminum only,42" type 1 (0515-2311)LF226$195.00$370.00$120.00$390.00$84.00$126.00
0275Pedestrian / bicycle railing, metal stanchions with chain guard (0515-20100)EACH9$788.00$350.00$1,000.00$1,740.00$1,450.00$525.00
0280Concrete curb, historic (0520-2120)LF318$120.00$100.00$180.00$54.00$80.00$134.00
0285Coquina concrete sidewalk and driveways, 4" thick (0522-1108)SY1,354$141.00$520.00$150.00$225.00$100.00$117.00
0290Coquina concrete sidewalk and driveways, 6" thick (0522-2101)SY360$108.00$520.00$205.00$310.00$125.00$250.00
0295Detectable warnings (0527-2)SF16$50.00$110.00$450.00$120.00$38.50$120.00
0300Fencing, type B, 7.1-8.0', standard (0550-10240)LF1,088$20.00$45.00$60.00$120.00$43.00$16.80
0305Fencing, type B, 7.1-8.0, reset existing (0550-10248)LF895$10.60$45.00$25.00$90.00$14.50$12.60
0310Fence gate, tubular metal pipe, double, 18.1-20.0' opening (0550-60524)EACH1$1,060.00$6,800.00$10,000$7,800.00$6,490.00$4,200.00
0315Performance turf, sod (0570-1-2)SY2,083$12.00$7.00$10.00$5.40$20.00$6.30
0320Biosorption activated media, bam- for infiltration (0917-532-10)CY3$350.00$6,000.00$1,250.00$1,200.00$1,800.00$700.00
0325Initial contingency amount, DO not bid (0999-25)LS1$150,000$150,000$150,000$150,000$150,000$150,000
0330Single column ground sign assembly, relocate (0700-1500)EACH10$870.00$340.00$250.00$888.00$740.00$777.00
0335Multi-column ground sign assembly, relocate (0700-2500)EACH3$12,310$12,000$1,000.00$12,528$11,300$10,962
0340Sign panel, furnish & install ground mount, UP to 12 SF (0700-3101)EACH5$665.00$400.00$1,500.00$679.20$566.00$595.00
0345Sign panel, remove, UP to 12 SF (0700-3601)EACH5$47.00$40.00$100.00$48.00$40.00$42.00
0350Signs- monument, remove existing and reinstall (0700-25-18)EACH24$470.00$260.00$250.00$6,000.00$1,275.00$210.00
0355Concrete class IV, bridge substructure (0400-4-5)CY27.90$3,530.00$1,600.00$3,000.00$3,500.00$2,250.00$560.00
0360Reinforcing steel- bridge substructure (0415-1-5)LB4,646$3.80$2.00$3.50$9.00$2.00$1.27
0365Conduit, furnish & install, open trench (0630-2-11)LF2,275$17.80$26.00$14.80$25.80$18.00$21.54
0370Conduit, furnish & install, directional bore (0630-2-12)LF185$28.45$62.00$23.65$60.00$83.00$86.33
0375Conduit, furnish & install, aboveground (0630-2-14)LF54$27.35$45.00$22.70$43.80$120.00$121.16
0380Pull & splice box, F&I, 13" X 24" cover size (0635-2-11)EACH22$2,670.00$3,700.00$2,220.00$3,630.00$704.00$730.00
0385Lighting conductors, F&I, insulated, no. 10 or < (0715-1-11)LF592$1.25$2.00$1.00$1.92$3.50$3.44
0390Lighting conductors, F&I, insulated, no.8 - 6 (0715-1-12)LF3,216$2.40$4.50$2.00$4.56$4.25$5.04
0395Light pole complete, relocate (0715-68000)EACH8$10,385$40,000$15,000$41,795$10,200$10,565
0400Pole cable distribution system, furnish and install, conventional (0715-500-1)EACH26$945.00$1,450.00$785.00$1,314.00$925.00$960.00
0405Light pole complete- special design, F&I ,pole top mount, concrete, 10' (0715-516310)EACH26$12,500$18,000$20,000$16,464$6,360.00$6,628.00
0410Irrigation sleeve, 6" diameter (0591-1600)LF176$30.00$25.00$25.00$60.00$45.00$11.85
0415Utility work- jpa/utility agreement, water (1000-6)LS1$229,673$601,128$69,080$266,475$323,400$65,913
0420Architectural- special, furnish and install timber pergola (0751-11101)LS1$176,500$75,000$150,000$215,000$170,000$88,350
0425Bicycle rack, furnish & install, 2 bicycles (0751-36-11)EACH4$2,130.00$3,900.00$2,000.00$14,550$1,100.00$1,525.00
0430Bench, F&I, concrete (0751-38-13)EACH20$9,465.00$3,600.00$4,000.00$5,100.00$4,190.00$2,355.00
0435Fiber optic cable locator (0633-6)DA400$291.00$400.00$240.00$478.00$60.00$60.46
FDOT contract T2A53: unit prices by line, the 6 lowest bidders (all in the CSV)

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.

Every contract let that day: FDOT letting of December 3, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy