Southern Road & Bridge, LLC: FDOT bid record

Southern Road & Bridge, LLC submitted 13 bids on Florida DOT contracts in the data, from 27 MAR 2019 to 29 JUL 2026, and was the low bidder on 0 of them (0%). When it was not low, its total sat a median +53% above the low bid.

Owner
Florida DOT
Low bid volume
$0
Latest bid
29 JUL 2026
Data through
28 OCT 2026
13Bids
0Low bids
0Win rate, percent
+53%Median gap to the low bid when not low, 13 bids

By year

YearBidsLow bidsWin rate
2019300%
2021100%
2022200%
2025400%
2026300%
Southern Road & Bridge, LLC, FDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
District 3400%
District 6300%
District 2200%
District 1100%
District 4100%
District 5100%
District 7100%
Southern Road & Bridge, LLC, FDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Floating turbidity barrier0104-11LF135 (38%)$12.50$15.92
Work zone sign0102-60ED82 (25%)$0.30$0.25
Performance turf, sod0570-1-2SY82 (25%)$6.88$5.00
Embankment0120-6CY82 (25%)$66.50$30.04
Channelizing device- types I, II, VP, drum, or LCD0102-74-1ED81 (13%)$0.18$0.13
Portable changeable message sign, temporary0102-99ED71 (14%)$13.00$12.00
Removal of existing concrete0110-4-10SY71 (14%)$50.00$33.96
Sediment barrier0104-10-3LF71 (14%)$3.00$2.60
Southern Road & Bridge, LLC, FDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

FirmContracts in commonThat firm ranked ahead
M & J Construction Company of Pinellas County, Inc.55 of 5
Superior Construction Company Southeast, LLC53 of 5
Seacoast Incorporated33 of 3
RJ Gorman Contracting LLC33 of 3
Oceanik.US, Inc.22 of 2
Scott Bridge Company, Inc.21 of 2
Murphree Bridge Corporation22 of 2
F & W Construction Company, Inc.22 of 2
Anderson Columbia Co., Inc.22 of 2
Ferreira Construction Co., Inc.11 of 1
Southern Road & Bridge, LLC, FDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
29 JUL 2026T7619District 7MULTIUSE TRAIL AT SR 60 (W COURTNEY CAMPBELL CAUSEWAY)5 of 6$2,464,246+52%
25 FEB 2026T3928District 3SCOTTS FERRY RD OVER BEAR CREEK, BRIDGE NO 4644196 of 6$10,427,904+86%
28 JAN 2026T3929District 3CR 274 OVER TENMILE CREEK BRIDGE NO. 4700357 of 7$15,296,246+165%
03 DEC 2025T2A53District 2SR 5A (SR A1A / AVENIDA MENENDEZ) FROM BRIDGE OF LIONS TO...4 of 8$27,478,069+38%
30 APR 2025T4711District 4SR 838 AND SR 836 (SUNRISE BLVD) OVER INTRACOASTAL WATER...3 of 4$65,485,726+52%
26 MAR 2025T5858District 5SR 528, SR 404, SR 520 AND US 192 AT VARIOUS BRIDGES...5 of 5$2,436,498+157%
29 JAN 2025T6610District 6SR A1A (COLLINS AVE / INDIAN CREEK DR) AND SR 112 FROM 44...3 of 3$13,510,695+47%
08 JUN 2022T2868District 2SR 109A7 of 7$4,617,091+48%
27 APR 2022T3800District 3SR 292 (PERDIDO KEY DR)7 of 7$5,786,000+63%
29 SEP 2021T3799District 3SR 30 (US 98)3 of 4$801,600+53%
28 AUG 2019T6485District 6SR 5 (US 1)8 of 9$10,615,866+59%
31 JUL 2019T1763District 1AMERICAN LEGION DR5 of 6$1,668,165+39%
27 MAR 2019T6477District 6SR 5 (US 1)3 of 3$3,642,979+77%
Southern Road & Bridge, LLC: latest FDOT bids in the data

How this record was read

FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.

  • Every bid counted here matched its published total to within one dollar; FDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy