Southern Road & Bridge, LLC: FDOT bid record
Southern Road & Bridge, LLC submitted 13 bids on Florida DOT contracts in the data, from 27 MAR 2019 to 29 JUL 2026, and was the low bidder on 0 of them (0%). When it was not low, its total sat a median +53% above the low bid.
- Owner
- Florida DOT
- Low bid volume
- $0
- Latest bid
- 29 JUL 2026
- Data through
- 28 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2019 | 3 | 0 | 0% |
| 2021 | 1 | 0 | 0% |
| 2022 | 2 | 0 | 0% |
| 2025 | 4 | 0 | 0% |
| 2026 | 3 | 0 | 0% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| District 3 | 4 | 0 | 0% |
| District 6 | 3 | 0 | 0% |
| District 2 | 2 | 0 | 0% |
| District 1 | 1 | 0 | 0% |
| District 4 | 1 | 0 | 0% |
| District 5 | 1 | 0 | 0% |
| District 7 | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Floating turbidity barrier | 0104-11 | LF | 13 | 5 (38%) | $12.50 | $15.92 |
| Work zone sign | 0102-60 | ED | 8 | 2 (25%) | $0.30 | $0.25 |
| Performance turf, sod | 0570-1-2 | SY | 8 | 2 (25%) | $6.88 | $5.00 |
| Embankment | 0120-6 | CY | 8 | 2 (25%) | $66.50 | $30.04 |
| Channelizing device- types I, II, VP, drum, or LCD | 0102-74-1 | ED | 8 | 1 (13%) | $0.18 | $0.13 |
| Portable changeable message sign, temporary | 0102-99 | ED | 7 | 1 (14%) | $13.00 | $12.00 |
| Removal of existing concrete | 0110-4-10 | SY | 7 | 1 (14%) | $50.00 | $33.96 |
| Sediment barrier | 0104-10-3 | LF | 7 | 1 (14%) | $3.00 | $2.60 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| M & J Construction Company of Pinellas County, Inc. | 5 | 5 of 5 |
| Superior Construction Company Southeast, LLC | 5 | 3 of 5 |
| Seacoast Incorporated | 3 | 3 of 3 |
| RJ Gorman Contracting LLC | 3 | 3 of 3 |
| Oceanik.US, Inc. | 2 | 2 of 2 |
| Scott Bridge Company, Inc. | 2 | 1 of 2 |
| Murphree Bridge Corporation | 2 | 2 of 2 |
| F & W Construction Company, Inc. | 2 | 2 of 2 |
| Anderson Columbia Co., Inc. | 2 | 2 of 2 |
| Ferreira Construction Co., Inc. | 1 | 1 of 1 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 29 JUL 2026 | T7619 | District 7 | MULTIUSE TRAIL AT SR 60 (W COURTNEY CAMPBELL CAUSEWAY) | 5 of 6 | $2,464,246 | +52% |
| 25 FEB 2026 | T3928 | District 3 | SCOTTS FERRY RD OVER BEAR CREEK, BRIDGE NO 464419 | 6 of 6 | $10,427,904 | +86% |
| 28 JAN 2026 | T3929 | District 3 | CR 274 OVER TENMILE CREEK BRIDGE NO. 470035 | 7 of 7 | $15,296,246 | +165% |
| 03 DEC 2025 | T2A53 | District 2 | SR 5A (SR A1A / AVENIDA MENENDEZ) FROM BRIDGE OF LIONS TO... | 4 of 8 | $27,478,069 | +38% |
| 30 APR 2025 | T4711 | District 4 | SR 838 AND SR 836 (SUNRISE BLVD) OVER INTRACOASTAL WATER... | 3 of 4 | $65,485,726 | +52% |
| 26 MAR 2025 | T5858 | District 5 | SR 528, SR 404, SR 520 AND US 192 AT VARIOUS BRIDGES... | 5 of 5 | $2,436,498 | +157% |
| 29 JAN 2025 | T6610 | District 6 | SR A1A (COLLINS AVE / INDIAN CREEK DR) AND SR 112 FROM 44... | 3 of 3 | $13,510,695 | +47% |
| 08 JUN 2022 | T2868 | District 2 | SR 109A | 7 of 7 | $4,617,091 | +48% |
| 27 APR 2022 | T3800 | District 3 | SR 292 (PERDIDO KEY DR) | 7 of 7 | $5,786,000 | +63% |
| 29 SEP 2021 | T3799 | District 3 | SR 30 (US 98) | 3 of 4 | $801,600 | +53% |
| 28 AUG 2019 | T6485 | District 6 | SR 5 (US 1) | 8 of 9 | $10,615,866 | +59% |
| 31 JUL 2019 | T1763 | District 1 | AMERICAN LEGION DR | 5 of 6 | $1,668,165 | +39% |
| 27 MAR 2019 | T6477 | District 6 | SR 5 (US 1) | 3 of 3 | $3,642,979 | +77% |
How this record was read
FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
- Every bid counted here matched its published total to within one dollar; FDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.