FDOT letting results, April 27, 2022
20 contracts let by Florida DOT on April 27, 2022, $149,206,749 in low bids, a median of 4 bidders per contract.
- Owner
- Florida DOT
- Contracts
- 20
- Low bids, total
- $149,206,749
- Data through
- 28 OCT 2026
Contracts let that day
| Contract | Project | District | Bids | Low bidder | Low bid | Second bid | Gap | Source |
|---|---|---|---|---|---|---|---|---|
| T2823 | I-295 (SR 9A) | District 2 | 4 | Superior Construction Company Southeast, LLC | $30,467,542 | $32,213,237 | +6.0% | FDOT |
| T1833 | SR 400 (I-4) | District 1 | 4 | Preferred Materials Inc. | $16,756,829 | $17,273,896 | +3.0% | FDOT |
| T6514 | SR 112 (I-195) (JULIA TUTTLE CSWY) AND SR 907 (ALTON RD) | District 6 | 3 | Asphalt Group, Inc. | $12,567,171 | $14,639,253 | +16% | FDOT |
| T2838 | SR 9A (I-295) | District 2 | 2 | Preferred Materials Inc. | $11,945,708 | $12,451,635 | +4.0% | FDOT |
| T5729 | SR 5 (US 1) | District 5 | 4 | Preferred Materials Inc. | $10,638,248 | $11,818,000 | +11% | FDOT |
| T3806 | SR 85 (EGLIN PKWY) | District 3 | 2 | Anderson Columbia Co., Inc. | $10,103,368 | $14,850,069 | +47% | FDOT |
| T2826 | SR 30 (US 98) | District 2 | 2 | Anderson Columbia Co., Inc. | $8,657,266 | $11,216,812 | +30% | FDOT |
| T4612 | PROSPECT RD | District 4 | 9 | Ohla USA Inc | $6,700,410 | $6,723,401 | 0.0% | FDOT |
| T3804 | SR 10 (US 90) | District 3 | 1 | Anderson Columbia Co., Inc. | $6,212,045 | FDOT | ||
| T1787 | SR 45 (US BUS 41) | District 1 | 4 | Russell Engineering, Inc. | $6,134,815 | $6,141,286 | 0.0% | FDOT |
| T6537 | SR 5/US-1/S DIXIE HWY | District 6 | 3 | General Asphalt Company, LLC | $6,069,480 | $6,910,638 | +14% | FDOT |
| T4614 | SR 15 (US 441) | District 4 | 4 | Ranger Construction Industries, Inc. | $4,491,996 | $5,215,000 | +16% | FDOT |
| T4610 | SR 842 (BROWARD BLVD) | District 4 | 4 | Weekley Asphalt Paving, Inc. | $4,142,494 | $4,369,893 | +5.0% | FDOT |
| T3800 | SR 292 (PERDIDO KEY DR) | District 3 | 7 | C & D Construction, Inc. | $3,545,980 | $3,945,000 | +11% | FDOT |
| T3830 | SR 85 | District 3 | 2 | Anderson Columbia Co., Inc. | $3,353,932 | $3,536,728 | +5.0% | FDOT |
| T3775 | SR 295 (NAVY BLVD) | District 3 | 3 | Roads, Inc. of NWF | $2,579,717 | $2,927,922 | +13% | FDOT |
| T4609 | SR 7 (US 441) | District 4 | 4 | Weekley Asphalt Paving, Inc. | $2,057,691 | $2,162,875 | +5.0% | FDOT |
| T4601 | NW 9TH AVE AND SR 845 (POWERLINE RD) | District 4 | 6 | Aum Construction Inc. | $1,248,248 | $1,495,392 | +20% | FDOT |
| T2829 | SR 212 (BEACH BLVD) | District 2 | 2 | Traffic Control Devices, Inc. | $1,047,740 | $1,317,444 | +26% | FDOT |
| T2852 | DISTRICTWIDE SAFETY PUSH BUTTON, ON SYSTEM (2ND) | District 2 | 5 | TRP Construction Group, LLC | $486,070 | $642,890 | +32% | FDOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than FDOT received, the others did not match their published totals and are left out.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.