Roads, Inc. of NWF: FDOT bid record

Roads, Inc. of NWF submitted 46 bids on Florida DOT contracts in the data, from 31 JAN 2018 to 20 MAY 2026, and was the low bidder on 19 of them (41%). When it was not low, its total sat a median +17% above the low bid.

Owner
Florida DOT
Low bid volume
$98,193,535
Latest bid
20 MAY 2026
Data through
28 OCT 2026
46Bids
19Low bids
41Win rate, percent
+17%Median gap to the low bid when not low, 27 bids

By year

YearBidsLow bidsWin rate
20186350%
20193133%
20204250%
20212150%
20229333%
20235240%
20247457%
20259222%
202611100%
Roads, Inc. of NWF, FDOT: bids and low bids by year of letting

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Performance turf, sod0570-1-2SY4429 (66%)$3.29$5.00
Removal of existing concrete0110-4-10SY3725 (68%)$30.00$33.96
Litter removal0107-1ACRE4222 (52%)$64.25$52.98
Sediment barrier0104-10-3LF4221 (50%)$3.12$2.60
Borrow excavation, truck measure0120-2-2CY3818 (47%)$43.30$38.80
Concrete curb & gutter, type F0520-1-10LF2316 (70%)$51.74$42.32
Manhole, adjust, utilities0425-5-1EACH2016 (80%)$1,389.39$1,325.67
Miscellaneous asphalt0339-1TN2615 (58%)$412.57$375.00
Type B stabilization0160-4SY2015 (75%)$18.34$15.00
Pipe culvert,optional material,round, 18"S/CD0430-175118LF2314 (61%)$139.60$154.00
Regular excavation0120-1CY3213 (41%)$32.52$25.47
Inlet protection system0104-18EACH4212 (29%)$362.69$150.00
Roads, Inc. of NWF, FDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

FirmContracts in commonThat firm ranked ahead
Panhandle Grading & Paving, Inc.3512 of 35
C.W. Roberts Contracting, Inc.3519 of 35
Anderson Columbia Co., Inc.104 of 10
Midsouth Paving, Inc.63 of 6
GDB-US Constructors, Inc.52 of 5
Pigott Asphalt and Sitework LLC32 of 3
Murphree Bridge Corporation21 of 2
J. Miller Construction Inc.11 of 1
Superior Construction Company Southeast, LLC10 of 1
Kiewit Infrastructure South Co.10 of 1
Roads, Inc. of NWF, FDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
20 MAY 2026T3992District 3SR 10 (US 90) AT W SPENCER FIELD RD1 of 3$1,461,250Low, 6.0% under the second
03 DEC 2025T3993District 3SR 97 (ATMORE HWY) FROM SR 95 (US 29) TO ALABAMA STATE LINE3 of 4$14,600,065+2.0%
29 OCT 2025T3946District 3SR 87 FROM N OF SR 4 TO ALABAMA STATE LINE4 of 4$3,162,802+46%
27 AUG 2025T3930District 3SR 295 FROM N OF SR 292 (BARRANCAS AVE) TO SR 727/2951 of 3$8,220,036Low, 0.0% under the second
28 MAY 2025T3956District 3SR 8 (I-10) FROM PERDIDO RIVER BR TO W OF SR 95 (US 29) AND2 of 3$19,926,6750.0%
28 MAY 2025T3967District 3SR 292 (SORRENTO RD) FROM CR 293 (BAUER RD) TO CR 292A (GULF1 of 3$6,120,821Low, 22% under the second
30 APR 2025T3960District 3SR 8 (I-10) FROM E OF SR 95 (US 29) TO E OF SR 2913 of 3$8,835,879+19%
26 MAR 2025T3934District 3SR 30 (US 98) FROM SANTA ROSA CO LINE TO W OF JOSIE RD2 of 3$8,990,378+12%
26 FEB 2025T3909District 3SR 750 (AIRPORT RD) FROM SR 95 (US 29) TO CR 95A (N PALAF...4 of 4$1,355,000+37%
29 JAN 2025T3949District 3SR 8A (I-110) FROM SR 30 (US 98) TO SR 8 (I-10)3 of 3$9,797,198+36%
04 DEC 2024T3907District 3SR 292 (GULF BEACH HWY) FROM CR 292A TO MANCHESTER ST1 of 3$6,190,327Low, 17% under the second
25 SEP 2024T3883District 3SR 296 (BRENT LN / BAYOU BLVD) FROM SR 291 (DAVIS HWY) TO...2 of 3$5,736,485+9.0%
25 SEP 2024T3923District 3SR 99 (BEULAH RD) FROM SR 10A (US 90) (MOBILE HWY) TO ISAACS1 of 3$4,380,007Low, 28% under the second
12 JUN 2024T3895District 3SR 30 (US 98B / GARDEN ST) FROM N ST TO SR 8A (I-110) RAMP1 of 3$21,380,512Low, 8.0% under the second
22 MAY 2024T3887District 3SR 296 FROM SR 10A (US 90 / MOBILE HWY) TO SR 95 (US 29 /3 of 3$5,940,312+8.0%
27 MAR 2024T3890District 3SR 10A (US 90 / SCENIC HWY) FROM S OF HYDE PARK RD TO S OF..1 of 3$4,804,455Low, 14% under the second
31 JAN 2024T3891District 3SR 30 (US 98) (GREGORY ST) FROM PALAFOX ST TO E OF 14TH AVE3 of 3$3,291,809+17%
25 OCT 2023T3865District 3SR 95 (US 29) FROM SR 97 (ATMORE HWY) TO N OF CHAMPION DR2 of 3$6,418,095+3.0%
25 OCT 2023T3870District 3SR 30 (US 98) (GULF BREEZE PKWY) AT SOUNDSIDE DR INTERSEC...2 of 3$1,774,800+43%
26 APR 2023T3864District 3SR 10A (US 90) SCENIC1 of 3$3,480,880Low, 9.0% under the second
29 MAR 2023T3863District 3SR 95 (US 29) (N PALAFOX ST)1 of 3$7,039,667Low, 2.0% under the second
22 FEB 2023T3843District 3SR 30 (US 98)2 of 3$18,424,687+23%
16 NOV 2022T3733District 3SR 30 (US 98)1 of 2$1,685,940Low, 6.0% under the second
31 AUG 2022T3833District 3SR 973 of 3$289,828+51%
27 JUL 2022T3757District 3SR 95 (US 29)2 of 2$5,939,962+26%
Roads, Inc. of NWF: latest FDOT bids in the data

How this record was read

FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.

  • Every bid counted here matched its published total to within one dollar; FDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy