| 0005 | Mobilization (0101-1) | LS | 1 | $86,500 | $92,500 | $262,034 | $350,000 |
| 0010 | Maintenance of traffic (0102-1) | DA | 1 | $75,000 | $187,567 | $42,000 | $125,892 |
| 0015 | Traffic control officer (0102-14) | HR | 132 | $50.00 | $95.00 | $94.00 | $79.79 |
| 0020 | Work zone sign (0102-60) | ED | 7,674 | $0.25 | $0.30 | $0.35 | $0.31 |
| 0025 | Channelizing device- types I, II, VP, drum, or LCD (0102-74-1) | ED | 4,176 | $0.15 | $0.30 | $0.35 | $0.31 |
| 0030 | Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8) | FD | 384 | $0.50 | $0.60 | $0.70 | $0.61 |
| 0035 | Arrow board / advance warning arrow panel (0102-76) | ED | 28 | $10.00 | $12.00 | $14.00 | $12.27 |
| 0040 | Portable changeable message sign, temporary (0102-99) | ED | 840 | $1.00 | $18.00 | $22.00 | $18.41 |
| 0045 | Temporary signalization and maintenance, intersection (0102-104) | ED | 240 | $3.00 | $36.00 | $43.00 | $36.82 |
| 0050 | Type III barricade (0102-115) | ED | 102 | $3.00 | $0.60 | $0.70 | $0.61 |
| 0055 | Inlet protection system (0104-18) | EACH | 4 | $250.00 | $750.00 | $900.00 | $1,500.00 |
| 0060 | Litter removal (0107-1) | ACRE | 2.44 | $100.00 | $368.86 | $1,800.00 | $750.00 |
| 0065 | Mowing (0107-2) | ACRE | 0.92 | $100.00 | $521.75 | $4,700.00 | $1,000.00 |
| 0070 | Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6) | SY | 242 | $15.00 | $39.26 | $31.00 | $18.00 |
| 0075 | Milling existing asphalt pavement, 7 1/2" avg depth (0327-70-31) | SY | 6,423 | $7.00 | $14.03 | $26.00 | $14.00 |
| 0080 | Asphalt concrete friction course,traffic C, FC-12.5, PG (0337-7-83) | TN | 549.90 | $250.00 | $205.64 | $260.00 | $260.00 |
| 0085 | Manhole, adjust (0425-5) | EACH | 1 | $5,000.00 | $3,000.00 | $5,800.00 | $2,000.00 |
| 0090 | Manhole, adjust, utilities (0425-5-1) | EACH | 2 | $3,000.00 | $3,100.00 | $5,800.00 | $2,000.00 |
| 0095 | Valve boxes, adjust (0425-6) | EACH | 1 | $2,500.00 | $1,500.00 | $1,600.00 | $1,800.00 |
| 0100 | Raised pavement marker, type B (0706-1-3) | EACH | 131 | $6.00 | $6.00 | $7.20 | $6.14 |
| 0105 | Painted pavement markings, standard, white, solid, 6" (0710-11101) | GM | 0.50 | $5,000.00 | $2,400.00 | $2,800.00 | $2,454.96 |
| 0110 | Painted pavement markings, standard, white, solid for stop line or crosswalk, 24" (0710-11125) | LF | 48 | $5.00 | $6.00 | $7.20 | $6.14 |
| 0115 | Painted pavement markings, standard, white, skip, 10-30 or skip, 6" wide (0710-11131) | GM | 0.25 | $5,000.00 | $1,440.00 | $1,700.00 | $1,472.98 |
| 0120 | Painted pavement markings, standard, white, arrows (0710-11170) | EACH | 12 | $75.00 | $60.00 | $72.00 | $61.37 |
| 0125 | Painted pavement markings, standard, yellow, solid, 6" (0710-11201) | GM | 0.32 | $5,000.00 | $2,400.00 | $2,900.00 | $2,454.96 |
| 0130 | Painted pavement markings, standard, yellow, skip, 6" (0710-11231) | GM | 0.08 | $5,000.00 | $1,440.00 | $1,600.00 | $1,472.98 |
| 0135 | Superpave asphaltic concrete, thick lift, traffic level C (0922-334-2) | TN | 2,119.50 | $250.00 | $176.73 | $230.00 | $240.00 |
| 0140 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $50,000 | $50,000 | $50,000 | $50,000 |
| 0145 | Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111) | EACH | 2 | $500.00 | $720.00 | $860.00 | $736.49 |
| 0150 | Single column ground sign assembly, remove (0700-1600) | EACH | 2 | $100.00 | $60.00 | $72.00 | $61.37 |
| 0155 | Raised pavement marker, type B (0706-1-3) | EACH | 131 | $6.00 | $6.00 | $7.20 | $6.14 |
| 0160 | Painted pavement markings, surface (0710-90) | LS | 1 | $6,000.00 | $6,600.00 | $7,900.00 | $6,751.14 |
| 0165 | Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123) | LF | 537 | $6.00 | $6.00 | $7.20 | $6.14 |
| 0170 | Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125) | LF | 161 | $10.00 | $9.60 | $12.00 | $9.82 |
| 0175 | Thermoplastic, standard, arrow (0711-11170) | EACH | 12 | $150.00 | $120.00 | $140.00 | $122.75 |
| 0180 | Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101) | GM | 0.50 | $10,000 | $6,240.00 | $7,400.00 | $6,382.89 |
| 0185 | Thermoplastic, standard-other surfaces, white, skip, 6",10-30 or 3-9 lane drop (0711-16131) | GM | 0.25 | $10,000 | $3,000.00 | $3,500.00 | $3,068.70 |
| 0190 | Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201) | GM | 0.32 | $10,000 | $6,240.00 | $7,500.00 | $6,382.89 |
| 0195 | Thermoplastic, standard-other surfaces, yellow, skip, 6" (0711-16231) | GM | 0.08 | $10,000 | $3,000.00 | $3,400.00 | $3,068.70 |
| 0200 | Thermoplastic, remove existing thermoplastic pavement markings- surface to remain (0711-17-1) | SF | 386 | $4.00 | $3.60 | $4.30 | $3.68 |