Pigott Asphalt and Sitework LLC: FDOT bid record

Pigott Asphalt and Sitework LLC submitted 45 bids on Florida DOT contracts in the data, from 25 JUL 2018 to 28 OCT 2026, and was the low bidder on 7 of them (16%). When it was not low, its total sat a median +16% above the low bid.

Owner
Florida DOT
Low bid volume
$23,894,275
Latest bid
28 OCT 2026
Data through
28 OCT 2026
45Bids
7Low bids
16Win rate, percent
+16%Median gap to the low bid when not low, 38 bids

By year

YearBidsLow bidsWin rate
20182150%
20195120%
2020100%
2024300%
202517318%
202617212%
Pigott Asphalt and Sitework LLC, FDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
District 326312%
District 212217%
District 74250%
District 5200%
District 1100%
Pigott Asphalt and Sitework LLC, FDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Litter removal0107-1ACRE3934 (87%)$10.00$52.98
Channelizing device- types I, II, VP, drum, or LCD0102-74-1ED4533 (73%)$0.05$0.13
Mowing0107-2ACRE3933 (85%)$40.00$80.65
Performance turf, sod0570-1-2SY4429 (66%)$4.00$5.00
Portable changeable message sign, temporary0102-99ED4027 (68%)$10.00$12.00
Raised pavement marker, type B0706-1-3EACH5825 (43%)$5.00$5.00
Work zone sign0102-60ED4522 (49%)$0.30$0.25
Sediment barrier0104-10-3LF4016 (40%)$3.00$2.60
Painted pavement markings, standard, yellow, solid, 6"0710-11201GM3715 (41%)$1,600.00$1,350.00
Milling existing asphalt pavement, 1 1/2" avg depth0327-70-6SY3414 (41%)$3.00$4.61
Temporary signalization and maintenance, intersection0102-104ED2314 (61%)$5.00$15.00
Ground-in rumble strips, 8" sinusoidal0546-72-3GM1614 (88%)$1,800.00$2,367.50
Pigott Asphalt and Sitework LLC, FDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Pigott Asphalt and Sitework LLC, FDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
28 OCT 2026T2A84District 2SR 20 FROM ROWLAND AVE TO S PALM AVE AND FROM SR 19 TO ALABAMA2 of 7$9,862,608+7.0%
28 OCT 2026T2A86District 2SR 100 FROM CLAY COUNTY LINE TO STJOHNS RIVER WATER MANAGEMENT1 of 8$8,449,954Low, 3.0% under the second
30 SEP 2026T2A81District 2SR 20 (US 27) FROM SJ TOM MOORE AVE TO END OF 4-LANE3 of 3$5,383,357+57%
30 SEP 2026T3A26District 3SR 10 (US 90 / MAHAN DR) FROM CR 0353 (DEMPSEY MAYO RD) TO APEX DR4 of 4$6,532,811+14%
30 SEP 2026T3A46District 3SR 61 (THOMSVILLE HWY) FROM N OF SR 63 (US 27 / MONROE ST) TO N OF 9TH3 of 3$2,286,405+4.0%
26 AUG 2026T2A75District 2SR 111 (TALLULAH AVE) FROM MONCRIEF CREEK BRIDGE TO SR 5 (US 17 / MAIN2 of 5$2,164,000+3.0%
26 AUG 2026T3998District 3SR 85/20 AND SR 397 FROM WOLVERINE TO EDGE AVE AND FROM SR 190 TO3 of 3$5,533,934+17%
26 AUG 2026T7614District 7SR 45 (US41) FROM WASHINGTON LN TO S OF COUNTY LINE RD1 of 6$5,519,971Low, 1.0% under the second
29 JUL 2026T3A03District 3SR 10 (US 90) FROM DUVAL ST TO W OF QUINCY CREEK4 of 5$1,587,594+3.0%
29 JUL 2026T3A04District 3SR 61 (US 319) FROM TIMBERWOLF CROSSING TO GEORGIA STATE LINE4 of 5$9,680,932+15%
20 MAY 2026T3987District 3SR 61 / SR 363 (CRAWFORDVILLE RD / ADAMS ST) FROM ARDEN RD..2 of 4$4,737,780+2.0%
20 MAY 2026T3991District 3SR 30 (US 98) FROM W OF ST JOE INLET BRIDGE TO ICWW BRIDGE5 of 6$2,972,815+40%
25 MAR 2026T2A61District 2SR 5 (US 17) FROM LIPPIZAN CT TO THE GEORGIA STATE LINE4 of 5$1,673,230+8.0%
25 MAR 2026T3A09District 3SR 261 (US 319 / CAPITAL CIR) FROM CR 151 (CENTERVILLE RD)..3 of 3$6,495,286+13%
25 FEB 2026T2A33District 2SR 15 (US 17 / REID ST) AND SR 20 (CRILL AVE) FROM MEMORIAL4 of 8$7,620,485+22%
25 FEB 2026T2A57District 2SR 15 (US 17 / PARK AVE) FROM DOCTORS INLET TO WELLS RD3 of 5$6,496,855+22%
28 JAN 2026T3990District 3SR 30 (US 98) FROM WAKULLA CO LINE TO TAYLOR CO LINE5 of 5$5,394,054+24%
03 DEC 2025T2A51District 2SR 5 (US 1 / PHILIPS HWY) FROM BAYARD BLVD TO BUSINESS PA...3 of 5$4,857,197+17%
03 DEC 2025T3969District 3SR 20 FROM SR 75 (US 231) TO CALHOUN CO LINE3 of 5$1,685,798+21%
03 DEC 2025T3994District 3SR 69 FROM S OF NE VAN LEROP RD TO JACKSON CO LINE5 of 5$4,562,173+60%
24 SEP 2025T7592District 7SR 39 (US 301 / GALL BLVD) FROM S OF WIRE RD TO N OF WIRE RD5 of 6$2,184,777+26%
27 AUG 2025T2A35District 2SR 16 FROM SR 13 TO CR 16A5 of 8$1,719,364+20%
30 JUL 2025T2A31District 2SR 10 (ATLANTIC BLVD) FROM E OF LAURINA ST TO SILVERSMITH...3 of 5$619,367+14%
30 JUL 2025T3940District 3SR 61 (US 319 / CRAWFORDVILLE RD) FROM S OF SR 61 SB TO...3 of 4$4,891,848+15%
30 JUL 2025T5819District 5SR 33 (CR 33) FROM S OF EDGEWOOD BOYS RANCH RD TO S OF WRIGH4 of 8$6,987,739+41%
Pigott Asphalt and Sitework LLC: latest FDOT bids in the data

How this record was read

FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.

  • Every bid counted here matched its published total to within one dollar; FDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy