Pigott Asphalt and Sitework LLC: FDOT bid record
Pigott Asphalt and Sitework LLC submitted 45 bids on Florida DOT contracts in the data, from 25 JUL 2018 to 28 OCT 2026, and was the low bidder on 7 of them (16%). When it was not low, its total sat a median +16% above the low bid.
- Owner
- Florida DOT
- Low bid volume
- $23,894,275
- Latest bid
- 28 OCT 2026
- Data through
- 28 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2018 | 2 | 1 | 50% |
| 2019 | 5 | 1 | 20% |
| 2020 | 1 | 0 | 0% |
| 2024 | 3 | 0 | 0% |
| 2025 | 17 | 3 | 18% |
| 2026 | 17 | 2 | 12% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| District 3 | 26 | 3 | 12% |
| District 2 | 12 | 2 | 17% |
| District 7 | 4 | 2 | 50% |
| District 5 | 2 | 0 | 0% |
| District 1 | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Litter removal | 0107-1 | ACRE | 39 | 34 (87%) | $10.00 | $52.98 |
| Channelizing device- types I, II, VP, drum, or LCD | 0102-74-1 | ED | 45 | 33 (73%) | $0.05 | $0.13 |
| Mowing | 0107-2 | ACRE | 39 | 33 (85%) | $40.00 | $80.65 |
| Performance turf, sod | 0570-1-2 | SY | 44 | 29 (66%) | $4.00 | $5.00 |
| Portable changeable message sign, temporary | 0102-99 | ED | 40 | 27 (68%) | $10.00 | $12.00 |
| Raised pavement marker, type B | 0706-1-3 | EACH | 58 | 25 (43%) | $5.00 | $5.00 |
| Work zone sign | 0102-60 | ED | 45 | 22 (49%) | $0.30 | $0.25 |
| Sediment barrier | 0104-10-3 | LF | 40 | 16 (40%) | $3.00 | $2.60 |
| Painted pavement markings, standard, yellow, solid, 6" | 0710-11201 | GM | 37 | 15 (41%) | $1,600.00 | $1,350.00 |
| Milling existing asphalt pavement, 1 1/2" avg depth | 0327-70-6 | SY | 34 | 14 (41%) | $3.00 | $4.61 |
| Temporary signalization and maintenance, intersection | 0102-104 | ED | 23 | 14 (61%) | $5.00 | $15.00 |
| Ground-in rumble strips, 8" sinusoidal | 0546-72-3 | GM | 16 | 14 (88%) | $1,800.00 | $2,367.50 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| C.W. Roberts Contracting, Inc. | 26 | 17 of 26 |
| Anderson Columbia Co., Inc. | 17 | 11 of 17 |
| Preferred Materials Inc. | 16 | 8 of 16 |
| Hubbard Construction Company | 14 | 4 of 14 |
| Capital Asphalt Inc | 12 | 6 of 12 |
| Duval Asphalt Products, Inc. | 10 | 3 of 10 |
| Peavy & Son Construction Co., Inc. | 8 | 5 of 8 |
| Roberts and Roberts, Inc. | 7 | 5 of 7 |
| Watson Civil Construction, Inc. | 5 | 1 of 5 |
| Ajax Paving Industries of Florida LLC | 5 | 1 of 5 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 28 OCT 2026 | T2A84 | District 2 | SR 20 FROM ROWLAND AVE TO S PALM AVE AND FROM SR 19 TO ALABAMA | 2 of 7 | $9,862,608 | +7.0% |
| 28 OCT 2026 | T2A86 | District 2 | SR 100 FROM CLAY COUNTY LINE TO STJOHNS RIVER WATER MANAGEMENT | 1 of 8 | $8,449,954 | Low, 3.0% under the second |
| 30 SEP 2026 | T2A81 | District 2 | SR 20 (US 27) FROM SJ TOM MOORE AVE TO END OF 4-LANE | 3 of 3 | $5,383,357 | +57% |
| 30 SEP 2026 | T3A26 | District 3 | SR 10 (US 90 / MAHAN DR) FROM CR 0353 (DEMPSEY MAYO RD) TO APEX DR | 4 of 4 | $6,532,811 | +14% |
| 30 SEP 2026 | T3A46 | District 3 | SR 61 (THOMSVILLE HWY) FROM N OF SR 63 (US 27 / MONROE ST) TO N OF 9TH | 3 of 3 | $2,286,405 | +4.0% |
| 26 AUG 2026 | T2A75 | District 2 | SR 111 (TALLULAH AVE) FROM MONCRIEF CREEK BRIDGE TO SR 5 (US 17 / MAIN | 2 of 5 | $2,164,000 | +3.0% |
| 26 AUG 2026 | T3998 | District 3 | SR 85/20 AND SR 397 FROM WOLVERINE TO EDGE AVE AND FROM SR 190 TO | 3 of 3 | $5,533,934 | +17% |
| 26 AUG 2026 | T7614 | District 7 | SR 45 (US41) FROM WASHINGTON LN TO S OF COUNTY LINE RD | 1 of 6 | $5,519,971 | Low, 1.0% under the second |
| 29 JUL 2026 | T3A03 | District 3 | SR 10 (US 90) FROM DUVAL ST TO W OF QUINCY CREEK | 4 of 5 | $1,587,594 | +3.0% |
| 29 JUL 2026 | T3A04 | District 3 | SR 61 (US 319) FROM TIMBERWOLF CROSSING TO GEORGIA STATE LINE | 4 of 5 | $9,680,932 | +15% |
| 20 MAY 2026 | T3987 | District 3 | SR 61 / SR 363 (CRAWFORDVILLE RD / ADAMS ST) FROM ARDEN RD.. | 2 of 4 | $4,737,780 | +2.0% |
| 20 MAY 2026 | T3991 | District 3 | SR 30 (US 98) FROM W OF ST JOE INLET BRIDGE TO ICWW BRIDGE | 5 of 6 | $2,972,815 | +40% |
| 25 MAR 2026 | T2A61 | District 2 | SR 5 (US 17) FROM LIPPIZAN CT TO THE GEORGIA STATE LINE | 4 of 5 | $1,673,230 | +8.0% |
| 25 MAR 2026 | T3A09 | District 3 | SR 261 (US 319 / CAPITAL CIR) FROM CR 151 (CENTERVILLE RD).. | 3 of 3 | $6,495,286 | +13% |
| 25 FEB 2026 | T2A33 | District 2 | SR 15 (US 17 / REID ST) AND SR 20 (CRILL AVE) FROM MEMORIAL | 4 of 8 | $7,620,485 | +22% |
| 25 FEB 2026 | T2A57 | District 2 | SR 15 (US 17 / PARK AVE) FROM DOCTORS INLET TO WELLS RD | 3 of 5 | $6,496,855 | +22% |
| 28 JAN 2026 | T3990 | District 3 | SR 30 (US 98) FROM WAKULLA CO LINE TO TAYLOR CO LINE | 5 of 5 | $5,394,054 | +24% |
| 03 DEC 2025 | T2A51 | District 2 | SR 5 (US 1 / PHILIPS HWY) FROM BAYARD BLVD TO BUSINESS PA... | 3 of 5 | $4,857,197 | +17% |
| 03 DEC 2025 | T3969 | District 3 | SR 20 FROM SR 75 (US 231) TO CALHOUN CO LINE | 3 of 5 | $1,685,798 | +21% |
| 03 DEC 2025 | T3994 | District 3 | SR 69 FROM S OF NE VAN LEROP RD TO JACKSON CO LINE | 5 of 5 | $4,562,173 | +60% |
| 24 SEP 2025 | T7592 | District 7 | SR 39 (US 301 / GALL BLVD) FROM S OF WIRE RD TO N OF WIRE RD | 5 of 6 | $2,184,777 | +26% |
| 27 AUG 2025 | T2A35 | District 2 | SR 16 FROM SR 13 TO CR 16A | 5 of 8 | $1,719,364 | +20% |
| 30 JUL 2025 | T2A31 | District 2 | SR 10 (ATLANTIC BLVD) FROM E OF LAURINA ST TO SILVERSMITH... | 3 of 5 | $619,367 | +14% |
| 30 JUL 2025 | T3940 | District 3 | SR 61 (US 319 / CRAWFORDVILLE RD) FROM S OF SR 61 SB TO... | 3 of 4 | $4,891,848 | +15% |
| 30 JUL 2025 | T5819 | District 5 | SR 33 (CR 33) FROM S OF EDGEWOOD BOYS RANCH RD TO S OF WRIGH | 4 of 8 | $6,987,739 | +41% |
How this record was read
FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
- Every bid counted here matched its published total to within one dollar; FDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.