FDOT contract T2A51 bid tabulation

SR 5 (US 1 / PHILIPS HWY) FROM BAYARD BLVD TO BUSINESS PA... Let by Florida DOT on December 3, 2025, Duval, District 2. 5 bids received; low bid $4,135,348 by Duval Asphalt Products, Inc..

Owner
Florida DOT
Letting
03 DEC 2025
Pay items
106
Data through
28 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Duval Asphalt Products, Inc.$4,135,348Low
2Preferred Materials Inc.$4,195,664+1.0%
3Pigott Asphalt and Sitework LLC$4,857,197+17%
4Watson Civil Construction, Inc.$5,204,327+26%
5Hubbard Construction Company$5,384,734+30%
FDOT contract T2A51: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Duval Asphalt Products, Inc.2. Preferred Materials Inc.3. Pigott Asphalt and Sitework LLC4. Watson Civil Construction, Inc.5. Hubbard Construction Company
0005Mobilization (0101-1)LS1$326,000$157,904$565,000$520,000$334,014
0010Maintenance of traffic (0102-1)DA1$200,000$251,907$347,000$300,000$759,441
0015Pedestrian or bicycle special detour (0102-4-1)SY1$4,500.00$8,842.71$6,500.00$9,850.00$9,585.24
0020Traffic control officer (0102-14)HR1,126$105.00$100.00$1.00$125.00$122.67
0025Work zone sign (0102-60)ED9,298$0.22$0.20$0.30$0.40$0.23
0030Channelizing device- types I, II, VP, drum, or LCD (0102-74-1)ED5,670$0.15$0.09$0.01$0.23$0.11
0035Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8)FD5,942$1.00$0.05$0.10$0.10$0.06
0040Arrow board / advance warning arrow panel (0102-76)ED133$5.50$5.00$7.50$6.50$5.67
0045Portable changeable message sign, temporary (0102-99)ED794$10.00$9.00$10.00$15.00$11.06
0050Temporary signalization and maintenance, intersection (0102-104)ED800$30.00$24.07$29.00$35.00$28.15
0055Temporary traffic detection and maintenance, intersection (0102-107-1)ED800$34.00$32.52$35.00$40.00$38.03
0060Type III barricade (0102-115)ED168$0.25$0.25$3.00$0.45$0.34
0065Portable regulatory, sign (0102-150-1)ED174$5.00$4.00$5.00$6.50$5.67
0070Radar speed display unit (0102-150-2)ED174$5.00$4.00$5.00$6.50$5.67
0075Litter removal (0107-1)ACRE169.21$125.00$100.00$10.00$115.00$113.43
0080Mowing (0107-2)ACRE141.89$125.00$100.00$50.00$115.00$141.79
0085Clearing & grubbing (0110-1-1)ACRE1$5,600.00$17,549$56,500$19,150$74,207
0090Removal of existing concrete (0110-4-10)SY366$50.00$43.00$65.00$30.00$44.78
0095Regular excavation (3-R projects only) (0120-71)LS1$11,200$6,349.46$20,000$10,000$6,895.63
0100Milling existing asphalt pavement, 3" avg depth (0327-70-4)SY8,310$3.00$3.28$4.00$6.00$2.49
0105Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6)SY15,025$4.50$5.44$3.50$3.75$13.12
0110Milling existing asphalt pavement, 4" avg depth (0327-70-7)SY13,952$4.20$2.60$3.50$7.80$3.80
0115Milling existing asphalt pavement, 2 1/4" avg depth (0327-70-11)SY54,792$2.50$1.49$3.00$4.25$2.67
0120Superpave asphaltic concrete, traffic C, PG76-22 (0334-1-53)TN7,287.70$155.00$186.01$200.00$208.00$164.88
0125Asphalt concrete friction course, inc bit, FC-5, PG 76-22 (0337-7-25)TN2,198.50$220.00$259.49$242.00$239.00$257.16
0130Asphalt concrete friction course,traffic C, FC-12.5, PG (0337-7-83)TN2,912.70$184.00$209.70$212.00$234.00$272.52
0135Inlets, DT bot, type B, partial (0425-1515)EACH2$6,000.00$5,500.00$4,500.00$9,925.00$2,397.49
0140Manhole, adjust (0425-5)EACH1$1,800.00$1,700.00$2,500.00$2,200.00$2,835.86
0145Manhole, adjust, utilities (0425-5-1)EACH1$1,800.00$1,700.00$2,500.00$2,200.00$2,228.54
0150Valve boxes, adjust (0425-6)EACH2$1,700.00$1,550.00$1,250.00$1,200.00$2,214.34
0155Mitered end section, optional round, 18" CD (0430-982125)EACH2$3,500.00$3,250.00$2,500.00$3,500.00$6,530.32
0160Concrete curb & gutter, type F (0520-1-10)LF449$60.00$52.50$75.00$92.00$62.41
0165Concrete sidewalk and driveways, 4" thick (0522-1)SY83$55.00$47.80$125.00$85.00$78.73
0170Concrete sidewalk and driveways, 6" thick (0522-2)SY203$80.00$72.00$175.00$100.00$88.36
0175Detectable warnings (0527-2)SF625$45.00$35.00$40.00$51.00$44.50
0180Riprap, rubble, F&I, ditch lining (0530-3-4)TN9.50$1,500.00$1,250.00$300.00$650.00$740.37
0185Performance turf, sod (0570-1-2)SY12,226$4.00$4.03$4.00$8.00$4.86
0190Conduit, furnish & install, open trench (0630-2-11)LF120$17.00$16.11$30.00$17.00$18.84
0195Conduit, furnish & install, directional bore (0630-2-12)LF181$55.00$51.94$65.00$55.00$60.75
0200Pull & splice box, F&I, 13" X 24" cover size (0635-2-11)EACH4$800.00$766.75$1,850.00$800.00$1,747.51
0205Traffic monitoring site vehicle sensor-non-weight, furnish & install (0695-1-1)EACH8$3,750.00$3,547.00$3,000.00$3,800.00$4,148.40
0210Traffic monitoring site inductive loop assembly, & install, 2 loops (0695-6-12)EACH8$4,500.00$4,070.25$2,500.00$4,400.00$4,760.36
0215Traffic monitoring site cabinet, furnish & install, type 3, pedestal mount (0695-7132)EACH2$6,000.00$5,667.00$7,500.00$6,200.00$6,627.85
0220Raised pavement marker, type B (0706-1-3)EACH872$5.00$4.65$5.00$5.00$5.37
0225Painted pavement markings, standard, white, solid, 6" (0710-11101)GM4.27$1,250.00$1,350.00$1,500.00$1,400.00$1,432.00
0230Painted pavement markings, standard, white, solid for interchange and urban island, (0710-11102)GM0.08$1,400.00$1,800.00$1,600.00$1,850.00$1,533.33
0235Painted pavement markings, standard, white, solid for crosswalk and roundabout, 12" (0710-11123)LF921$1.50$1.45$2.00$1.55$1.49
0240Painted pavement markings, standard, white, solid for stop line or crosswalk, 24" (0710-11125)LF163$1.75$3.00$3.00$3.20$1.79
0245Painted pavement markings, standard, white, skip, 10-30 or skip, 6" wide (0710-11131)GM3.57$600.00$355.00$1,000.00$375.00$655.32
0250Painted pavement markings, standard, white, 2-4 dotted guideline/ 6-10 dotted 6" (0710-11141)GM0.96$600.00$605.00$1,000.00$640.00$654.07
0255Painted pavement markings, standard, white, arrows (0710-11170)EACH36$50.00$40.00$50.00$43.00$53.74
0260Painted pavement markings, standard, yellow, solid, 6" (0710-11201)GM0.21$1,250.00$1,350.00$1,500.00$1,400.00$1,419.43
0265Painted pavement markings, standard, yellow, solid for interchange and urban island, (0710-11202)GM0.06$1,400.00$1,800.00$1,600.00$1,700.00$1,386.25
0270Painted pavement markings, standard, yellow, 2-4 dotted guideline/6-10 dotted extension, 6" (0710-11241)GM0.17$600.00$1,000.00$1,000.00$1,050.00$636.85
0275Initial contingency amount, DO not bid (0999-25)LS1$55,252$55,252$55,252$55,252$55,252
0280Ground-in rumble strips, 8" sinusoidal (0546-72-3)GM3.37$3,500.00$2,913.27$2,000.00$2,700.00$4,885.98
0285Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111)EACH50$500.00$390.00$420.00$400.00$552.28
0290Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112)EACH11$2,500.00$2,100.00$2,350.00$2,300.00$2,857.64
0295Single column ground sign assembly, relocate (0700-1500)EACH5$100.00$75.00$100.00$80.00$215.41
0300Single column ground sign assembly, remove (0700-1600)EACH7$55.00$35.00$50.00$50.00$34.37
0305Sign panel, relocate, UP to 12 SF (0700-3501)EACH1$75.00$50.00$100.00$60.00$154.68
0310Sign panel, relocate, 12-20 SF (0700-3502)EACH1$145.00$50.00$100.00$60.00$189.06
0315Sign panel, remove, UP to 12 SF (0700-3601)EACH7$55.00$35.00$100.00$39.00$28.65
0320Retroreflective sign strip- furnish and install, 5' (0700-13-15)EACH45$115.00$100.00$150.00$101.00$100.83
0325Object marker, type 1 (0705-10-1)EACH12$275.00$225.00$250.00$230.00$336.87
0330Delineator, flexible tubular (0705-11-1)EACH24$70.00$125.00$150.00$126.00$107.71
0335Raised pavement marker, type B (0706-1-3)EACH1,566$5.00$4.65$5.00$5.00$5.37
0340Painted pavement markings, surface (0710-90)LS1$45,000$31,500$42,500$32,000$55,529
0345Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123)LF2,841$6.00$3.25$6.00$3.50$6.57
0350Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124)LF419$7.00$5.00$7.00$5.50$7.17
0355Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125)LF753$8.00$8.25$8.00$8.90$8.36
0360Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141)GM1.24$2,000.00$2,500.00$2,200.00$2,600.00$2,135.63
0365Thermoplastic, standard, message or symbol (0711-11160)EACH2$225.00$175.00$300.00$190.00$238.84
0370Thermoplastic, standard, arrow (0711-11170)EACH99$85.00$80.00$80.00$85.00$89.56
0375Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron (0711-11224)LF240$7.00$5.00$7.00$5.50$7.17
0380Thermoplastic, standard, yellow, 2-4 dotted guide line dotted extension line, 6" (0711-11241)GM0.45$2,000.00$2,500.00$2,500.00$2,600.00$2,120.61
0385Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125)LF2,064$15.00$13.00$13.50$13.80$15.52
0390Thermoplastic, preformed, white, message (0711-14160)EACH25$200.00$225.00$200.00$240.00$214.95
0395Thermoplastic, preformed, white, arrow (0711-14170)EACH25$150.00$165.00$150.00$175.00$149.27
0400Thermoplastic, preformed, 12" white with 4" black contrast crosswalk on concrete pavement, 20" (0711-14528)LF136$17.00$11.50$15.00$12.00$17.91
0405Thermoplastic, standard-open graded asphalt surfaces solid, 6" (0711-15101)GM3.22$6,000.00$4,300.00$6,000.00$4,500.00$6,192.35
0410Thermoplastic, standard-open graded asphalt surfaces, skip, 6",10-30 skip or 3-9 lane (0711-15131)GM2.28$2,900.00$1,600.00$3,000.00$1,720.00$2,977.57
0415Thermoplastic, standard-open graded asphalt surfaces, yellow, solid, 6" (0711-15201)GM2.33$6,000.00$4,300.00$6,000.00$4,500.00$6,191.03
0420Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101)GM2.00$5,500.00$3,700.00$5,000.00$3,900.00$5,720.60
0425Thermoplastic, standard-other surfaces, white, solid, 8" (0711-16102)GM0.13$6,000.00$15,000$6,000.00$15,650$6,209.69
0430Thermoplastic, standard-other surfaces, white, skip, 6",10-30 or 3-9 lane drop (0711-16131)GM1.16$2,500.00$2,100.00$2,500.00$2,200.00$2,620.41
0435Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201)GM1.25$5,500.00$3,700.00$6,000.00$3,900.00$5,727.46
0440Thermoplastic, remove existing thermoplastic pavement markings- surface to remain (0711-17-1)SF300$3.00$3.50$3.00$3.70$2.99
0445Conduit, furnish & install, open trench (0630-2-11)LF774$17.00$14.92$25.00$16.00$17.45
0450Conduit, furnish & install, directional bore (0630-2-12)LF790$41.00$36.20$45.00$40.00$42.34
0455Signal cable- new or reconstructed intersection, furnish & install (0632-7-1)PI3$15,000$13,768$5,500.00$15,000$16,103
0460Fiber optic cable locator (0633-6)DA200$150.00$25.53$10.00$27.00$29.86
0465Pull & splice box, F&I, 13" X 24" cover size (0635-2-11)EACH17$800.00$766.65$1,800.00$1,000.00$1,747.40
0470Aluminum signals pole, furnish install pedestrian detector post (0646-1-12)EACH11$3,500.00$3,248.18$2,000.00$3,600.00$3,798.91
0475Loop assembly, F&I, type B (0660-2102)AS16$2,400.00$2,120.19$1,000.00$2,350.00$2,479.67
0480Loop assembly, F&I, type F (0660-2106)AS6$2,400.00$2,120.33$2,300.00$2,350.00$2,479.84
0485Vehicle detection system- microwave, furnish & install cabinet equipment (0660-3-11)EACH1$10,000$9,454.00$12,000$10,000$11,057
0490Vehicle detection system- microwave, furnish & install, above ground equipment (0660-3-12)EACH4$12,500$10,863$17,500$12,000$12,705
0495Vehicle detection system- adjust/modify cabinet (0660-4-51)EACH1$1,200.00$1,040.00$500.00$1,100.00$1,216.33
0500Pedestrian detector, furnish & install, standard (0665-1-11)EACH13$350.00$310.00$350.00$325.00$362.56
0505Pedestrian detector, relocate (0665-1-40)EACH1$350.00$305.00$750.00$325.00$356.71
0510Pedestrian detector, remove- pole/pedestal to remain (0665-1-60)EACH13$225.00$205.15$100.00$225.00$239.93
0515Traffic controller, modify (0671-2-40)EACH3$550.00$495.33$2,750.00$550.00$579.32
0520Traffic signal controller cabinet, adjust/modify (0676-1500)EACH3$900.00$820.67$500.00$915.00$959.81
0525Sign panel, furnish & install ground mount, UP to 12 SF (0700-3101)EACH10$200.00$154.70$600.00$170.00$180.93
0530Sign panel, remove, UP to 12 SF (0700-3601)EACH10$100.00$84.90$100.00$95.00$99.30
FDOT contract T2A51: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.

Every contract let that day: FDOT letting of December 3, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy