Duval Asphalt Products, Inc.: FDOT bid record
Duval Asphalt Products, Inc. submitted 84 bids on Florida DOT contracts in the data, from 28 FEB 2018 to 28 OCT 2026, and was the low bidder on 25 of them (30%). When it was not low, its total sat a median +19% above the low bid.
- Owner
- Florida DOT
- Low bid volume
- $200,802,886
- Latest bid
- 28 OCT 2026
- Data through
- 28 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2018 | 7 | 4 | 57% |
| 2019 | 8 | 2 | 25% |
| 2020 | 6 | 2 | 33% |
| 2021 | 6 | 1 | 17% |
| 2022 | 10 | 4 | 40% |
| 2023 | 11 | 5 | 45% |
| 2024 | 10 | 2 | 20% |
| 2025 | 11 | 3 | 27% |
| 2026 | 15 | 2 | 13% |
Pay items where it is most often lowest
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Preferred Materials Inc. | 74 | 40 of 74 |
| Hubbard Construction Company | 64 | 29 of 64 |
| Anderson Columbia Co., Inc. | 25 | 14 of 25 |
| Watson Civil Construction, Inc. | 19 | 7 of 19 |
| Halifax Paving, Inc. | 15 | 14 of 15 |
| Pigott Asphalt and Sitework LLC | 10 | 7 of 10 |
| P & S Paving, Inc. | 9 | 6 of 9 |
| Reeves Construction Company | 6 | 2 of 6 |
| Masci General Contractors, Inc | 5 | 2 of 5 |
| Whitehurst, V. E. & Sons, Inc. | 4 | 3 of 4 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 28 OCT 2026 | T2A73 | District 2 | SR A1A FROM BEGIN 4-LANE TO SR 312, FROM FLAGLER CO LINE TO E MAGNOLIA AVE | 8 of 8 | $24,567,488 | +51% |
| 28 OCT 2026 | T2A83 | District 2 | SR 13 (HENDRICKS AVE) FROM SAN MARCO BLVD TO PRUDENTIAL DR | 3 of 6 | $2,254,698 | +10% |
| 28 OCT 2026 | T2A84 | District 2 | SR 20 FROM ROWLAND AVE TO S PALM AVE AND FROM SR 19 TO ALABAMA | 7 of 7 | $12,714,781 | +38% |
| 28 OCT 2026 | T2A86 | District 2 | SR 100 FROM CLAY COUNTY LINE TO STJOHNS RIVER WATER MANAGEMENT | 8 of 8 | $12,813,803 | +52% |
| 26 AUG 2026 | T2A75 | District 2 | SR 111 (TALLULAH AVE) FROM MONCRIEF CREEK BRIDGE TO SR 5 (US 17 / MAIN | 5 of 5 | $2,299,835 | +10% |
| 26 AUG 2026 | T2A78 | District 2 | SR 15 (US 1 / NEW KINGS RD) FROM TROUT RIVER BLVD TO SR 104 | 1 of 3 | $4,074,392 | Low, 0.0% under the second |
| 29 JUL 2026 | T2A29 | District 2 | SR 228 (NORMANDY BLVD) FROM THE EQUESTRIAN CENTER TO LAMPLIGHTER | 1 of 4 | $8,775,067 | Low, 5.0% under the second |
| 29 JUL 2026 | T2A40 | District 2 | 20836645201 | 2 of 2 | $10,023,288 | +26% |
| 25 MAR 2026 | T2963 | District 2 | SR 21 (BLANDING BLVD) FROM WILSON BLVD TO ROOSEVELT | 2 of 3 | $5,939,511 | +6.0% |
| 25 MAR 2026 | T2A61 | District 2 | SR 5 (US 17) FROM LIPPIZAN CT TO THE GEORGIA STATE LINE | 3 of 5 | $1,672,376 | +8.0% |
| 25 FEB 2026 | T2A33 | District 2 | SR 15 (US 17 / REID ST) AND SR 20 (CRILL AVE) FROM MEMORIAL | 6 of 8 | $8,495,961 | +35% |
| 25 FEB 2026 | T2A57 | District 2 | SR 15 (US 17 / PARK AVE) FROM DOCTORS INLET TO WELLS RD | 2 of 5 | $5,913,228 | +11% |
| 25 FEB 2026 | T2A58 | District 2 | SR 202 (BUTLER BLVD) FROM BELFORT RD TO HODGES BLVD | 2 of 3 | $15,639,594 | +10% |
| 28 JAN 2026 | T2A49 | District 2 | SR 228 (NORMANDY BLVD) FROM S OF MEMORIAL PARK RD TO SR... | 2 of 5 | $2,725,137 | +9.0% |
| 28 JAN 2026 | T2A54 | District 2 | SR 5 (US 17 / N MAIN ST) FROM TROUT RIVER BRIDGE TO N OF... | 4 of 5 | $6,486,484 | +31% |
| 03 DEC 2025 | T2A51 | District 2 | SR 5 (US 1 / PHILIPS HWY) FROM BAYARD BLVD TO BUSINESS PA... | 1 of 5 | $4,135,348 | Low, 1.0% under the second |
| 24 SEP 2025 | T2A38 | District 2 | SR 16 FROM SR 21 TO SR 15 (US 17) | 2 of 4 | $12,279,261 | +23% |
| 24 SEP 2025 | T2A46 | District 2 | SR 212 (BEACH BLVD) AND SR 10 (ATLANTIC BLVD) AT FOSTER DR.. | 5 of 5 | $1,401,947 | +41% |
| 27 AUG 2025 | T2A35 | District 2 | SR 16 FROM SR 13 TO CR 16A | 8 of 8 | $2,155,456 | +51% |
| 30 JUL 2025 | T2A31 | District 2 | SR 10 (ATLANTIC BLVD) FROM E OF LAURINA ST TO SILVERSMITH... | 5 of 5 | $914,103 | +69% |
| 28 MAY 2025 | T2A03 | District 2 | SR 212 (US 90/BEACH BLVD) FROM ST JOHNS BLUFF TO GERONA BLVD | 1 of 4 | $10,942,356 | Low, 7.0% under the second |
| 26 MAR 2025 | T2998 | District 2 | SR 15 (US 17) FROM OAK ST TO BLACK CREEK | 1 of 4 | $12,335,810 | Low, 18% under the second |
| 26 MAR 2025 | T2A19 | District 2 | SR 5 (US 17) FROM N OF BROWARD RIVER TO NASSAU CO LINE | 4 of 4 | $16,098,584 | +22% |
| 26 FEB 2025 | T2A05 | District 2 | SR A1A (US 105) FROM SHAD CREEK TO LITTLE TALBOT ISLAND | 4 of 4 | $3,879,888 | +56% |
| 26 FEB 2025 | T2A15 | District 2 | SR 115 (LEM TURNER RD) FROM DUVAL CO LINE TO SR 15 (US 1) | 2 of 5 | $5,328,931 | +23% |
How this record was read
FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
- Every bid counted here matched its published total to within one dollar; FDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.