| 0005 | Mobilization (0101-1) | LS | 1 | $950,000 | $477,000 | $1,280,000 | $756,557 |
| 0010 | Maintenance of traffic (0102-1) | DA | 1 | $450,000 | $827,875 | $1,980,000 | $933,370 |
| 0015 | Pedestrian or bicycle special detour (0102-4-1) | SY | 1 | $75,000 | $51,504 | $149,000 | $47,183 |
| 0020 | Traffic control officer (0102-14) | HR | 1,073 | $125.00 | $85.00 | $95.00 | $133.49 |
| 0025 | Work zone sign (0102-60) | ED | 26,612 | $0.27 | $0.19 | $0.30 | $0.22 |
| 0030 | Channelizing device- types I, II, VP, drum, or LCD (0102-74-1) | ED | 155,097 | $0.11 | $0.09 | $0.14 | $0.10 |
| 0035 | Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8) | FD | 63,484 | $0.50 | $0.04 | $0.06 | $0.05 |
| 0040 | Arrow board / advance warning arrow panel (0102-76) | ED | 460 | $6.00 | $5.00 | $7.20 | $5.83 |
| 0045 | Portable changeable message sign, temporary (0102-99) | ED | 1,037 | $12.00 | $9.00 | $13.00 | $10.50 |
| 0050 | Temporary signalization and maintenance, intersection (0102-104) | ED | 2,970 | $12.00 | $36.66 | $8.00 | $34.49 |
| 0055 | Temporary traffic detection and maintenance, intersection (0102-107-1) | ED | 2,970 | $10.00 | $2.50 | $6.00 | $34.49 |
| 0060 | Type III barricade (0102-115) | ED | 713 | $0.25 | $0.23 | $0.34 | $0.27 |
| 0065 | Sediment barrier (0104-10-3) | LF | 2,644 | $1.00 | $4.11 | $1.20 | $1.46 |
| 0070 | Inlet protection system (0104-18) | EACH | 176 | $120.00 | $109.67 | $131.00 | $151.63 |
| 0075 | Litter removal (0107-1) | ACRE | 361.37 | $130.00 | $115.00 | $75.00 | $41.99 |
| 0080 | Mowing (0107-2) | ACRE | 361.37 | $130.00 | $115.00 | $90.00 | $101.48 |
| 0085 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $100,000 | $24,665 | $493,000 | $31,650 |
| 0090 | Removal of existing concrete (0110-4-10) | SY | 2,231 | $52.00 | $42.00 | $28.00 | $45.77 |
| 0095 | Borrow excavation, truck measure (0120-2-2) | CY | 100.90 | $55.00 | $182.99 | $29.00 | $69.07 |
| 0100 | Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6) | SY | 36,312 | $3.00 | $5.34 | $2.50 | $8.89 |
| 0105 | Milling existing asphalt pavement, 2 1/2" avg depth (0327-70-8) | SY | 210,011 | $3.50 | $3.56 | $3.10 | $5.10 |
| 0110 | Superpave asphaltic concrete, traffic C, PG76-22 (0334-1-53) | TN | 11,550.60 | $175.00 | $235.86 | $180.00 | $224.49 |
| 0115 | Asphalt concrete friction course,traffic C, FC-12.5, PG (0337-7-83) | TN | 20,342.50 | $175.00 | $199.73 | $172.00 | $206.09 |
| 0120 | Manhole, adjust (0425-5) | EACH | 13 | $1,900.00 | $1,750.00 | $1,800.00 | $3,096.80 |
| 0125 | Valve boxes, adjust (0425-6) | EACH | 10 | $1,900.00 | $1,700.00 | $2,300.00 | $1,995.57 |
| 0130 | Concrete curb & gutter, type F (0520-1-10) | LF | 548 | $70.00 | $62.50 | $47.00 | $61.33 |
| 0135 | Concrete curb, type D (0520-2-4) | LF | 7 | $65.00 | $60.00 | $155.00 | $85.10 |
| 0140 | Valley gutter- concrete (0520-3) | LF | 92 | $120.00 | $115.00 | $52.00 | $78.03 |
| 0145 | Concrete sidewalk and driveways, 4" thick (0522-1) | SY | 1,136 | $70.00 | $64.00 | $72.00 | $60.39 |
| 0150 | Concrete sidewalk and driveways, 6" thick (0522-2) | SY | 882 | $75.00 | $72.00 | $93.00 | $94.59 |
| 0155 | Detectable warnings (0527-2) | SF | 1,688 | $45.00 | $42.25 | $44.00 | $46.94 |
| 0160 | Performance turf, sod (0570-1-2) | SY | 2,048 | $10.00 | $18.73 | $7.80 | $18.58 |
| 0165 | Raised pavement marker, type B (0706-1-3) | EACH | 9,194 | $5.00 | $5.00 | $6.00 | $6.62 |
| 0170 | Painted pavement markings, standard, white, solid, 6" (0710-11101) | GM | 20.27 | $1,700.00 | $1,700.00 | $1,305.00 | $1,443.45 |
| 0175 | Painted pavement markings, standard, white, solid for interchange and urban island, (0710-11102) | GM | 0.36 | $3,600.00 | $3,500.00 | $1,460.00 | $1,615.47 |
| 0180 | Painted pavement markings, standard, white, solid for crosswalk and roundabout, 12" (0710-11123) | LF | 8,291 | $1.75 | $1.50 | $1.40 | $1.50 |
| 0185 | Painted pavement markings, standard, white, solid for diagonal or chevron, 18" (0710-11124) | LF | 850 | $2.25 | $2.00 | $1.65 | $1.80 |
| 0190 | Painted pavement markings, standard, white, solid for stop line or crosswalk, 24" (0710-11125) | LF | 2,076 | $3.00 | $2.75 | $2.20 | $2.41 |
| 0195 | Painted pavement markings, standard, white, skip, 10-30 or skip, 6" wide (0710-11131) | GM | 12.91 | $475.00 | $445.00 | $706.00 | $781.59 |
| 0200 | Painted pavement markings, standard, white, 2-4 dotted guideline/ 6-10 dotted 6" (0710-11141) | GM | 5.10 | $800.00 | $760.00 | $870.00 | $962.07 |
| 0205 | Painted pavement markings, standard, white, message or symbol (0710-11160) | EACH | 44 | $90.00 | $85.00 | $82.00 | $90.25 |
| 0210 | Painted pavement markings, standard, white, arrows (0710-11170) | EACH | 306 | $50.00 | $45.00 | $55.00 | $60.16 |
| 0215 | Painted pavement markings, standard, white, yield line (0710-11180) | LF | 40 | $7.00 | $6.25 | $5.45 | $6.02 |
| 0220 | Painted pavement markings, standard, yellow, solid, 6" (0710-11201) | GM | 7.22 | $1,800.00 | $1,700.00 | $1,310.00 | $1,443.75 |
| 0225 | Painted pavement markings, standard, yellow, solid for diagonal or chevron, 18" (0710-11224) | LF | 108 | $2.50 | $2.25 | $1.65 | $1.81 |
| 0230 | Painted pavement markings, standard, yellow, 2-4 dotted guideline/6-10 dotted extension, 6" (0710-11241) | GM | 0.47 | $800.00 | $750.00 | $815.00 | $902.47 |
| 0235 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $130,169 | $130,169 | $130,169 | $130,169 |
| 0240 | Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111) | EACH | 59 | $650.00 | $467.00 | $423.00 | $493.06 |
| 0245 | Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112) | EACH | 8 | $2,200.00 | $1,797.00 | $2,300.00 | $2,645.69 |
| 0250 | Single column ground sign assembly, relocate (0700-1500) | EACH | 19 | $160.00 | $400.00 | $155.00 | $180.39 |
| 0255 | Single column ground sign assembly, remove (0700-1600) | EACH | 27 | $35.00 | $50.00 | $52.00 | $60.13 |
| 0260 | Sign panel, furnish & install overhead mount, UP to 12 SF (0700-3201) | EACH | 14 | $1,200.00 | $489.69 | $1,400.00 | $1,418.15 |
| 0265 | Sign panel, relocate, 12-20 SF (0700-3502) | EACH | 5 | $1,600.00 | $746.32 | $129.00 | $150.32 |
| 0270 | Tubular marker, 36" white post (0704-1-3) | EACH | 2 | $200.00 | $230.00 | $129.00 | $150.32 |
| 0275 | Tubular marker, 36" yellow (0704-1-4) | EACH | 8 | $200.00 | $230.00 | $129.00 | $150.32 |
| 0280 | Raised pavement marker, type B (0706-1-3) | EACH | 4,597 | $5.00 | $5.00 | $6.00 | $6.62 |
| 0285 | Painted pavement markings, standard, yellow, island nose (0710-11290) | SF | 181 | $10.00 | $10.00 | $2.75 | $3.01 |
| 0290 | Painted pavement markings, surface (0710-90) | LS | 1 | $105,000 | $90,000 | $97,000 | $126,503 |
| 0295 | Thermoplastic, standard, solid, 8" for interchange and urban island (0711-11102) | GM | 0.46 | $17,500 | $15,000 | $5,600.00 | $6,161.25 |
| 0300 | Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123) | LF | 8,291 | $4.00 | $3.25 | $6.00 | $6.62 |
| 0305 | Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124) | LF | 979 | $6.00 | $5.00 | $7.35 | $8.12 |
| 0310 | Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125) | LF | 2,130 | $10.00 | $8.75 | $8.70 | $9.63 |
| 0315 | Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141) | GM | 5.19 | $3,000.00 | $2,700.00 | $2,720.00 | $3,004.74 |
| 0320 | Thermoplastic, standard, message or symbol (0711-11160) | EACH | 47 | $180.00 | $155.00 | $218.00 | $240.66 |
| 0325 | Thermoplastic, standard, arrow (0711-11170) | EACH | 307 | $85.00 | $75.00 | $71.00 | $78.21 |
| 0330 | Thermoplastic, standard, yield line (0711-11180) | LF | 40 | $12.00 | $10.25 | $5.45 | $6.02 |
| 0335 | Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron (0711-11224) | LF | 103 | $6.00 | $5.00 | $7.35 | $8.12 |
| 0340 | Thermoplastic, standard, yellow, 2-4 dotted guide line dotted extension line, 6" (0711-11241) | GM | 0.47 | $3,000.00 | $2,700.00 | $2,400.00 | $2,647.21 |
| 0345 | Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125) | LF | 4,440 | $15.00 | $13.00 | $14.70 | $16.24 |
| 0350 | Thermoplastic, preformed, white, message (0711-14160) | EACH | 137 | $250.00 | $220.00 | $201.00 | $222.61 |
| 0355 | Thermoplastic, preformed, white, arrow (0711-14170) | EACH | 136 | $175.00 | $155.00 | $147.00 | $162.44 |
| 0360 | Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101) | GM | 20.21 | $4,500.00 | $3,800.00 | $5,100.00 | $5,655.18 |
| 0365 | Thermoplastic, standard-other surfaces, white, skip, 6",10-30 or 3-9 lane drop (0711-16131) | GM | 12.89 | $1,500.00 | $1,300.00 | $2,400.00 | $2,645.80 |
| 0370 | Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201) | GM | 7.22 | $4,500.00 | $3,800.00 | $5,250.00 | $5,774.99 |
| 0375 | Green-colored pavement markings, bike lane (0714-10) | SF | 1,702 | $13.00 | $11.25 | $13.60 | $15.04 |
| 0380 | Utility work- jpa/utility agreement, power (1000-7) | LS | 1 | $190,088 | $114,577 | $163,115 | $168,988 |
| 0385 | Itsfm subsurface documentation- project length (0611-1-1) | MI | 3.86 | $2,000.00 | $3,181.60 | $1,900.00 | $3,769.13 |
| 0390 | Itsfm location documentation- intersection (0611-2-1) | EACH | 9 | $2,000.00 | $2,646.54 | $1,900.00 | $2,639.07 |
| 0395 | Conduit, furnish & install, open trench (0630-2-11) | LF | 204 | $33.00 | $16.60 | $29.10 | $24.94 |
| 0400 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 415 | $55.00 | $40.23 | $48.00 | $40.00 |
| 0405 | Signal cable- new or reconstructed intersection, furnish & install (0632-7-1) | PI | 8 | $14,250 | $12,237 | $12,300 | $12,991 |
| 0410 | Signal cable, remove- intersection (0632-7-6) | PI | 8 | $2,000.00 | $1,714.69 | $1,735.00 | $2,248.83 |
| 0415 | Fiber optic cable locator (0633-6) | DA | 330 | $300.00 | $345.25 | $260.00 | $390.24 |
| 0420 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 8 | $1,500.00 | $1,571.96 | $1,450.00 | $1,919.28 |
| 0425 | Aluminum signals pole, (0646-1-11) | EACH | 35 | $3,500.00 | $2,909.03 | $3,100.00 | $3,945.90 |
| 0430 | Aluminum signals pole, furnish install pedestrian detector post (0646-1-12) | EACH | 8 | $2,800.00 | $2,187.43 | $2,450.00 | $2,163.13 |
| 0435 | Aluminum signals pole, (0646-1-40) | EACH | 6 | $3,000.00 | $2,669.82 | $2,650.00 | $2,723.29 |
| 0440 | Aluminum signals pole, remove (0646-1-60) | EACH | 34 | $400.00 | $651.20 | $347.00 | $1,124.42 |
| 0445 | Vehicular traffic signal, relocate- includes removal reinstallation (0650-1-70) | AS | 27 | $1,750.00 | $1,560.21 | $1,510.00 | $1,664.27 |
| 0450 | Pedestrian signal, furnish & install LED countdown, 1 way (0653-1-11) | AS | 36 | $1,225.00 | $1,114.59 | $1,100.00 | $1,361.15 |
| 0455 | Pedestrian signal, furnish & install LED countdown, 2 ways (0653-1-12) | AS | 8 | $2,500.00 | $2,023.11 | $2,200.00 | $2,138.05 |
| 0460 | Pedestrian signal, remove ped signal- pole/pedestal to remain (0653-1-60) | AS | 28 | $65.00 | $197.24 | $58.00 | $224.88 |
| 0465 | Loop detector inductive, remove- cabinet to remain (0660-1600) | EACH | 13 | $65.00 | $83.16 | $56.00 | $56.22 |
| 0470 | Loop assembly, F&I, type B (0660-2102) | AS | 90 | $1,850.00 | $1,388.81 | $1,600.00 | $1,848.81 |
| 0475 | Loop assembly, F&I, type F (0660-2106) | AS | 59 | $1,650.00 | $1,885.62 | $1,450.00 | $2,203.19 |
| 0480 | Vehicle detection system- microwave, furnish & install cabinet equipment (0660-3-11) | EACH | 1 | $14,000 | $11,241 | $12,400 | $12,931 |
| 0485 | Vehicle detection system- microwave, furnish & install, above ground equipment (0660-3-12) | EACH | 6 | $14,000 | $12,644 | $12,500 | $14,545 |
| 0490 | Vehicle detection system- remove (0660-4-60) | EACH | 1 | $1,300.00 | $903.98 | $1,170.00 | $2,248.83 |
| 0495 | Vehicle detection system- avi, bluetooth relocate, above ground equipment (0660-6422) | EACH | 1 | $1,300.00 | $1,380.00 | $1,170.00 | $1,587.41 |
| 0500 | Pedestrian detector, furnish & install, standard (0665-1-11) | EACH | 56 | $350.00 | $452.87 | $303.00 | $369.25 |
| 0505 | Pedestrian detector, remove- pole/pedestal to remain (0665-1-60) | EACH | 13 | $65.00 | $114.25 | $58.00 | $112.44 |
| 0510 | Wireless communication device, relocate (0684-6-40) | EACH | 2 | $1,300.00 | $1,605.82 | $1,170.00 | $1,984.26 |
| 0515 | Sign panel, furnish & install overhead mount, UP to 12 SF (0700-3201) | EACH | 14 | $1,300.00 | $489.69 | $1,115.00 | $1,314.14 |
| 0520 | Sign panel, relocate, 12-20 SF (0700-3502) | EACH | 5 | $1,750.00 | $746.32 | $1,570.00 | $880.69 |