| 0005 | Mobilization (0101-1) | LS | 1 | $190,000 | $232,214 | $375,000 | $350,000 |
| 0010 | Maintenance of traffic (0102-1) | DA | 1 | $165,000 | $393,633 | $664,000 | $940,000 |
| 0015 | Traffic control officer (0102-14) | HR | 240 | $50.00 | $150.00 | $85.00 | $125.00 |
| 0020 | Work zone sign (0102-60) | ED | 2,700 | $0.30 | $0.30 | $0.30 | $0.35 |
| 0025 | Channelizing device- types I, II, VP, drum, or LCD (0102-74-1) | ED | 4,350 | $0.15 | $0.15 | $0.15 | $0.20 |
| 0030 | Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8) | FD | 1,200 | $0.50 | $0.07 | $0.07 | $0.15 |
| 0035 | Arrow board / advance warning arrow panel (0102-76) | ED | 300 | $7.00 | $6.00 | $6.00 | $10.00 |
| 0040 | Temporary raised/retroreflective pavement marker, type D (0102-78-1) | EACH | 978 | $6.00 | $4.75 | $6.00 | $6.00 |
| 0045 | Portable changeable message sign, temporary (0102-99) | ED | 328 | $10.00 | $12.00 | $12.00 | $15.00 |
| 0050 | Sediment barrier (0104-10-3) | LF | 106 | $5.00 | $31.94 | $6.10 | $30.00 |
| 0055 | Inlet protection system (0104-18) | EACH | 15 | $250.00 | $238.81 | $100.00 | $250.00 |
| 0060 | Litter removal (0107-1) | ACRE | 181.97 | $10.00 | $85.00 | $27.00 | $125.00 |
| 0065 | Mowing (0107-2) | ACRE | 181.97 | $50.00 | $135.00 | $70.01 | $200.00 |
| 0070 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $25,000 | $28,062 | $75,000 | $35,000 |
| 0075 | Borrow excavation, truck measure (0120-2-2) | CY | 1,900 | $3.50 | $76.22 | $52.72 | $45.00 |
| 0080 | Regular excavation (3-R projects only) (0120-71) | LS | 1 | $10,000 | $45,695 | $10,000 | $45,000 |
| 0085 | Optional base, base group 01 (0285-701) | SY | 1,108 | $16.50 | $46.33 | $36.07 | $40.00 |
| 0090 | Milling existing asphalt pavement, 3" avg depth (0327-70-4) | SY | 32,818 | $3.50 | $3.93 | $7.30 | $6.00 |
| 0095 | Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6) | SY | 24,383 | $3.00 | $5.16 | $8.15 | $5.00 |
| 0100 | Superpave asphaltic concrete, traffic C, PG76-22 (0334-1-53) | TN | 2,725.80 | $200.00 | $207.75 | $218.79 | $210.00 |
| 0105 | Asphalt concrete friction course,traffic C, FC-12.5, PG (0337-7-83) | TN | 4,718.60 | $205.00 | $206.16 | $223.20 | $215.00 |
| 0110 | Bridge deck expansion joint, rehabilitation, poured joint backer rod (0458-1-21) | LF | 72 | $200.00 | $350.00 | $83.63 | $200.00 |
| 0115 | Performance turf, sod (0570-1-2) | SY | 5,337 | $4.00 | $5.98 | $9.53 | $6.00 |
| 0120 | Painted pavement markings, standard, white, solid, 6" (0710-11101) | GM | 5.23 | $1,600.00 | $2,000.00 | $1,500.86 | $2,100.00 |
| 0125 | Painted pavement markings, standard, white, solid for interchange and urban island, (0710-11102) | GM | 0.16 | $10,000 | $7,800.00 | $1,658.54 | $8,000.00 |
| 0130 | Painted pavement markings, standard, white, solid for interchange markings, 12" (0710-11103) | GM | 0.03 | $10,000 | $5,800.00 | $2,884.62 | $6,000.00 |
| 0135 | Painted pavement markings, standard, white, solid for diagonal or chevron, 18" (0710-11124) | LF | 623 | $3.00 | $2.20 | $3.00 | $2.50 |
| 0140 | Painted pavement markings, standard, white, solid for stop line or crosswalk, 24" (0710-11125) | LF | 157 | $6.00 | $2.70 | $4.00 | $3.00 |
| 0145 | Painted pavement markings, standard, white, skip, 10-30 or skip, 6" wide (0710-11131) | GM | 0.20 | $2,500.00 | $425.00 | $804.02 | $450.00 |
| 0150 | Painted pavement marking, standard,white, 3'-9' skip drop line and approach to toll 12" wide, (0710-11133) | GM | 0.05 | $5,000.00 | $1,000.00 | $1,702.13 | $1,200.00 |
| 0155 | Painted pavement markings, standard, white, 2-4 dotted guideline/ 6-10 dotted 6" (0710-11141) | GM | 0.09 | $5,000.00 | $730.00 | $847.06 | $800.00 |
| 0160 | Painted pavement markings, standard, white, message or symbol (0710-11160) | EACH | 3 | $100.00 | $85.00 | $100.00 | $90.00 |
| 0165 | Painted pavement markings, standard, white, arrows (0710-11170) | EACH | 29 | $50.00 | $65.00 | $45.00 | $70.00 |
| 0170 | Painted pavement markings, standard, yellow, solid, 6" (0710-11201) | GM | 4.52 | $1,600.00 | $2,000.00 | $1,499.67 | $2,100.00 |
| 0175 | Painted pavement markings, standard, yellow, solid for diagonal or chevron, 18" (0710-11224) | LF | 392 | $4.00 | $2.20 | $3.00 | $2.50 |
| 0180 | Painted pavement markings, standard, yellow, skip, 6" (0710-11231) | GM | 0.45 | $1,500.00 | $425.00 | $810.57 | $450.00 |
| 0185 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $50,000 | $50,000 | $50,000 | $50,000 |
| 0190 | Ground-in rumble strips, 8" sinusoidal (0546-72-3) | GM | 6.16 | $2,000.00 | $3,527.86 | $2,428.82 | $3,000.00 |
| 0195 | Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111) | EACH | 5 | $500.00 | $551.00 | $556.57 | $600.00 |
| 0200 | Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112) | EACH | 2 | $850.00 | $753.00 | $760.61 | $850.00 |
| 0205 | Single column ground sign assembly, remove (0700-1600) | EACH | 4 | $100.00 | $50.00 | $50.51 | $60.00 |
| 0210 | Delineator, non-flexible (0705-11-2) | EACH | 16 | $100.00 | $97.00 | $97.98 | $115.00 |
| 0215 | Raised pavement marker, type B (0706-1-3) | EACH | 978 | $6.00 | $4.75 | $6.00 | $5.00 |
| 0220 | Painted pavement markings, standard, yellow, island nose (0710-11290) | SF | 15 | $15.00 | $10.00 | $10.00 | $12.00 |
| 0225 | Painted pavement markings, surface (0710-90) | LS | 1 | $25,000 | $33,000 | $49,400 | $42,000 |
| 0230 | Thermoplastic, standard, solid, 8" for interchange and urban island (0711-11102) | GM | 0.16 | $10,000 | $15,000 | $7,317.07 | $17,500 |
| 0235 | Thermoplastic, standard, solid, 12" for interchange markings (0711-11103) | GM | 0.03 | $10,000 | $20,000 | $13,846 | $25,000 |
| 0240 | Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124) | LF | 623 | $7.00 | $6.50 | $7.00 | $7.00 |
| 0245 | Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125) | LF | 157 | $9.00 | $8.60 | $9.00 | $10.00 |
| 0250 | Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141) | GM | 0.09 | $10,000 | $2,600.00 | $4,764.71 | $3,200.00 |
| 0255 | Thermoplastic, standard, message or symbol (0711-11160) | EACH | 3 | $200.00 | $290.00 | $200.00 | $350.00 |
| 0260 | Thermoplastic, standard, arrow (0711-11170) | EACH | 29 | $100.00 | $100.00 | $90.00 | $125.00 |
| 0265 | Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron (0711-11224) | LF | 392 | $7.00 | $6.50 | $7.00 | $8.00 |
| 0270 | Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101) | GM | 5.23 | $5,500.00 | $3,700.00 | $5,202.98 | $4,500.00 |
| 0275 | Thermoplastic, standard-other surfaces, white, skip, 6",10-30 or 3-9 lane drop (0711-16131) | GM | 0.20 | $10,000 | $1,300.00 | $3,517.59 | $1,650.00 |
| 0280 | Thermoplastic, standard-other surfaces white, skip, 12"- approach to toll plaza or 3-9 lane drop (0711-16133) | GM | 0.05 | $10,000 | $8,600.00 | $7,446.81 | $10,000 |
| 0285 | Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201) | GM | 4.52 | $6,000.00 | $3,700.00 | $5,198.85 | $4,500.00 |
| 0290 | Thermoplastic, standard-other surfaces, yellow, skip, 6" (0711-16231) | GM | 0.45 | $5,000.00 | $1,300.00 | $3,469.16 | $1,650.00 |
| 0295 | Permanent tape, white, solid, 6" for concrete bridges (0713-103101) | GM | 0.77 | $35,000 | $37,000 | $32,167 | $45,000 |
| 0300 | Permanent tape, yellow, solid, for concrete bridges (0713-103201) | GM | 0.77 | $35,000 | $37,000 | $32,125 | $45,000 |
| 0305 | Preformed/permanent tape, remove (0713-107) | SF | 4,773 | $3.00 | $2.15 | $3.00 | $3.00 |
| 0310 | Signal cable- new or reconstructed intersection, furnish & install (0632-7-1) | PI | 1 | $7,500.00 | $4,126.33 | $4,126.33 | $5,000.00 |
| 0315 | Signal cable, remove- intersection (0632-7-6) | PI | 1 | $4,700.00 | $3,250.00 | $3,250.00 | $4,000.00 |
| 0320 | Vehicular traffic signal, furnish & install aluminum, 1 section, 1 way (0650-1-11) | AS | 6 | $1,800.00 | $1,218.41 | $1,218.41 | $1,500.00 |
| 0325 | Vehicular traffic signal, remove- poles to remain (0650-1-60) | AS | 6 | $750.00 | $227.50 | $227.50 | $300.00 |