| 0005 | Bridge deck expansion joint, rehabilitation, poured joint backer rod (0458-1-21) | LF | 188 | $59.00 | $83.00 | $71.54 | $78.00 |
| 0010 | Mobilization (0101-1) | LS | 1 | $1,154,046 | $1,480,000 | $969,765 | $1,800,000 |
| 0015 | Maintenance of traffic (0102-1) | DA | 1 | $900,226 | $1,880,000 | $1,191,803 | $950,000 |
| 0020 | Special detour- temporary pavement (0102-2200) | SY | 1 | $151,299 | $137,000 | $295,100 | $120,500 |
| 0025 | Pedestrian or bicycle special detour (0102-4-1) | SY | 1 | $19,480 | $18,000 | $17,640 | $3,000.00 |
| 0030 | Traffic control officer (0102-14) | HR | 624 | $140.00 | $90.00 | $130.15 | $130.00 |
| 0035 | Work zone sign (0102-60) | ED | 28,034 | $0.20 | $0.33 | $0.24 | $0.25 |
| 0040 | Temporary barrier, F&I, low profile, concrete (0102-71-13) | LF | 948 | $39.00 | $45.00 | $46.56 | $50.00 |
| 0045 | Temporary barrier, relocate, low profile concrete (0102-71-23) | LF | 1,457 | $15.00 | $14.00 | $17.91 | $20.00 |
| 0050 | Channelizing device- types I, II, VP, drum, or LCD (0102-74-1) | ED | 92,184 | $0.09 | $0.15 | $0.11 | $0.15 |
| 0055 | Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8) | FD | 4,348 | $0.05 | $0.08 | $0.06 | $0.10 |
| 0060 | Arrow board / advance warning arrow panel (0102-76) | ED | 297 | $5.00 | $8.00 | $5.97 | $6.00 |
| 0065 | Temporary raised/retroreflective pavement marker, type D (0102-78-1) | EACH | 1,786 | $8.00 | $5.25 | $5.38 | $5.00 |
| 0070 | Portable changeable message sign, temporary (0102-99) | ED | 688 | $9.00 | $15.00 | $10.75 | $12.00 |
| 0075 | Temporary signalization and maintenance, intersection (0102-104) | ED | 1,320 | $28.40 | $45.00 | $26.40 | $35.00 |
| 0080 | Temporary traffic detection and maintenance, intersection (0102-107-1) | ED | 1,320 | $28.40 | $45.00 | $1.19 | $35.00 |
| 0085 | Type III barricade (0102-115) | ED | 930 | $0.20 | $0.33 | $0.24 | $0.30 |
| 0090 | Removable tape, white, solid 6" (0102-913-21) | GM | 0.10 | $16,818 | $15,000 | $13,580 | $20,000 |
| 0095 | Sediment barrier (0104-10-3) | LF | 8,429 | $0.95 | $1.20 | $2.37 | $3.00 |
| 0100 | Staked turbidity barrier- nylon reinforced PVC (0104-12) | LF | 194 | $5.50 | $6.50 | $7.25 | $10.00 |
| 0105 | Inlet protection system (0104-18) | EACH | 42 | $208.15 | $78.00 | $172.81 | $265.00 |
| 0110 | Litter removal (0107-1) | ACRE | 779.76 | $100.00 | $50.00 | $38.80 | $275.00 |
| 0115 | Mowing (0107-2) | ACRE | 662.89 | $115.00 | $121.00 | $94.58 | $275.00 |
| 0120 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $64,603 | $1,050,000 | $92,856 | $375,000 |
| 0125 | Removal of existing concrete (0110-4-10) | SY | 1,146 | $78.00 | $41.00 | $55.60 | $55.00 |
| 0130 | Borrow excavation, truck measure (0120-2-2) | CY | 1,500.30 | $103.49 | $41.00 | $75.09 | $135.00 |
| 0135 | Subsoil excavation (0120-4) | CY | 1,988.10 | $50.58 | $51.00 | $80.87 | $150.00 |
| 0140 | Regular excavation (3-R projects only) (0120-71) | LS | 1 | $67,990 | $119,500 | $188,164 | $200,000 |
| 0145 | Type B stabilization (0160-4) | SY | 1,996 | $35.93 | $60.00 | $84.19 | $28.50 |
| 0150 | Soil stabilization/improvement column supported embankment begin project reconstruction (0173-79100) | | 1 | $1,084,721 | $620,000 | $2,562,396 | $2,252,000 |
| 0155 | Optional base, base group 01 (0285-701) | SY | 2,657 | $21.57 | $74.00 | $84.26 | $28.50 |
| 0160 | Optional base, base group 03 (0285-703) | SY | 257 | $94.59 | $76.00 | $56.50 | $74.00 |
| 0165 | Optional base, base group 09 (0285-709) | SY | 1,320 | $125.38 | $70.00 | $108.88 | $62.00 |
| 0170 | Milling existing asphalt pavement, 3 1/2" avg depth (0327-70-2) | SY | 98,284 | $4.55 | $3.70 | $6.23 | $4.00 |
| 0175 | Milling existing asphalt pavement, 3" avg depth (0327-70-4) | SY | 22,838 | $3.90 | $3.50 | $5.68 | $5.00 |
| 0180 | Milling existing asphalt pavement, 2" avg depth (0327-70-5) | SY | 37,503 | $3.61 | $2.35 | $6.49 | $5.00 |
| 0185 | Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6) | SY | 42,081 | $3.31 | $2.10 | $6.34 | $4.00 |
| 0190 | Superpave asphaltic conc, traffic C (0334-1-13) | TN | 670.70 | $257.95 | $179.00 | $189.81 | $270.00 |
| 0195 | Superpave asphaltic concrete, traffic C, PG76-22 (0334-1-53) | TN | 12,806.20 | $196.32 | $195.00 | $186.04 | $195.00 |
| 0200 | Asphalt concrete friction course,traffic C, FC-12.5, PG (0337-7-83) | TN | 17,736.90 | $200.84 | $205.00 | $192.08 | $190.00 |
| 0205 | Miscellaneous asphalt (0339-1) | TN | 118.70 | $611.77 | $357.00 | $1,242.86 | $800.00 |
| 0210 | Manhole, adjust (0425-5) | EACH | 1 | $2,100.00 | $5,200.00 | $3,012.60 | $2,000.00 |
| 0215 | Manhole, adjust, utilities (0425-5-1) | EACH | 6 | $2,100.00 | $2,700.00 | $2,960.42 | $2,000.00 |
| 0220 | Valve boxes, adjust (0425-6) | EACH | 7 | $1,050.00 | $2,800.00 | $1,915.57 | $2,000.00 |
| 0225 | Pipe culvert, optional material, round, 15"SD (0430-174115) | LF | 15 | $525.00 | $259.00 | $555.98 | $500.00 |
| 0230 | Pipe culvert, optional material, round, 18"SD (0430-174118) | LF | 22 | $575.00 | $364.00 | $555.98 | $500.00 |
| 0235 | Pipe culvert,optional material,round, 24"S/CD (0430-175124) | LF | 73 | $935.00 | $388.00 | $844.80 | $750.00 |
| 0240 | Flared end section, concrete, 18" (0430-200-25) | EACH | 3 | $9,200.00 | $4,500.00 | $8,339.67 | $7,500.00 |
| 0245 | Straight concrete endwalls, single, 0 degrees, round (0430-524100) | EACH | 2 | $8,600.00 | $5,600.00 | $10,831 | $9,500.00 |
| 0250 | Mitered end section, optional round, 15" SD (0430-984123) | EACH | 2 | $2,200.00 | $2,500.00 | $8,339.67 | $7,500.00 |
| 0255 | Mitered end section, optional round, 18" SD (0430-984125) | EACH | 7 | $2,575.00 | $3,200.00 | $8,339.67 | $7,500.00 |
| 0260 | Mitered end section , optional round, 30" SD (0430-984133) | EACH | 1 | $3,300.00 | $9,700.00 | $9,386.65 | $8,000.00 |
| 0265 | Concrete curb & gutter, type F (0520-1-10) | LF | 1,408 | $89.00 | $53.00 | $60.65 | $75.00 |
| 0270 | Concrete sidewalk and driveways, 6" thick (0522-2) | SY | 35 | $172.00 | $160.00 | $122.75 | $175.00 |
| 0275 | Concrete ditch pavement, 4", reinforced (0524-1-29) | SY | 50 | $500.00 | $204.00 | $361.02 | $325.00 |
| 0280 | Detectable warnings (0527-2) | SF | 158 | $57.00 | $54.00 | $55.60 | $50.00 |
| 0282 | Riprap, rubble, F&I, ditch lining (0530-3-4) | TN | 16 | $479.55 | $857.00 | $411.61 | $350.00 |
| 0284 | Bedding stone (0530-74) | TN | 12 | $457.70 | $800.00 | $294.01 | $500.00 |
| 0285 | Guardrail -roadway, general (0536-1-1) | LF | 1,263 | $25.00 | $22.10 | $25.93 | $40.00 |
| 0290 | Guardrail transition to rigid barrier, F&I- index 536- 001, approach TL-3 (0536-8112) | EACH | 6 | $3,000.00 | $4,050.00 | $4,723.85 | $4,500.00 |
| 0295 | Guardrail removal (0536-73) | LF | 1,245 | $2.50 | $2.65 | $3.10 | $16.00 |
| 0300 | Guardrail end treatment- parallel approach terminal (0536-85-24) | EACH | 6 | $3,000.00 | $4,300.00 | $4,978.56 | $5,500.00 |
| 0305 | Relocate crash cushion - all options (0544-74-40) | EACH | 1 | $10,000 | $4,100.00 | $16,270 | $17,500 |
| 0310 | Performance turf, sod (0570-1-2) | SY | 31,826 | $4.48 | $6.70 | $11.64 | $6.50 |
| 0315 | Raised pavement marker, type B (0706-1-3) | EACH | 5,438 | $5.00 | $5.25 | $5.38 | $5.00 |
| 0320 | Painted pavement markings, standard, white, solid, 6" (0710-11101) | GM | 20.15 | $1,625.00 | $1,355.00 | $1,672.31 | $1,500.00 |
| 0325 | Painted pavement markings, standard, white, solid for interchange and urban island, (0710-11102) | GM | 0.23 | $2,200.00 | $1,525.00 | $1,861.28 | $1,700.00 |
| 0330 | Painted pavement markings, standard, white, solid for crosswalk and roundabout, 12" (0710-11123) | LF | 1,402 | $2.00 | $1.60 | $2.39 | $2.50 |
| 0335 | Painted pavement markings, standard, white, solid for diagonal or chevron, 18" (0710-11124) | LF | 509 | $2.75 | $1.85 | $3.59 | $3.50 |
| 0340 | Painted pavement markings, standard, white, solid for stop line or crosswalk, 24" (0710-11125) | LF | 976 | $3.00 | $2.10 | $4.78 | $4.50 |
| 0345 | Painted pavement markings, standard, white, skip, 10-30 or skip, 6" wide (0710-11131) | GM | 1.55 | $430.00 | $780.00 | $954.80 | $900.00 |
| 0350 | Painted pavement markings, standard, white, 2-4 dotted guideline/ 6-10 dotted 6" (0710-11141) | GM | 0.74 | $955.00 | $770.00 | $948.23 | $900.00 |
| 0355 | Painted pavement markings, standard, white, message or symbol (0710-11160) | EACH | 7 | $100.00 | $89.00 | $101.58 | $100.00 |
| 0360 | Painted pavement markings, standard, white, arrows (0710-11170) | EACH | 103 | $50.00 | $52.00 | $53.78 | $50.00 |
| 0365 | Painted pavement markings, standard, white, yield line (0710-11180) | LF | 13 | $20.00 | $2.60 | $17.93 | $17.00 |
| 0370 | Painted pavement markings, standard, yellow, solid, 6" (0710-11201) | GM | 20.23 | $1,625.00 | $1,360.00 | $1,672.73 | $1,500.00 |
| 0375 | Painted pavement markings, standard, yellow, solid for diagonal or chevron, 18" (0710-11224) | LF | 2,576 | $2.25 | $1.85 | $3.59 | $3.50 |
| 0380 | Painted pavement markings, standard, yellow, skip, 6" (0710-11231) | GM | 0.92 | $430.00 | $770.00 | $947.70 | $900.00 |
| 0385 | Painted pavement markings, standard, yellow, 2-4 dotted guideline/6-10 dotted extension, 6" (0710-11241) | GM | 0.43 | $955.00 | $775.00 | $953.81 | $900.00 |
| 0390 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $150,000 | $150,000 | $150,000 | $150,000 |
| 0395 | Ground-in rumble strips, 8" sinusoidal (0546-72-3) | GM | 21.01 | $1,942.05 | $3,075.00 | $2,868.52 | $2,000.00 |
| 0400 | Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111) | EACH | 24 | $594.00 | $613.00 | $937.26 | $750.00 |
| 0405 | Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112) | EACH | 4 | $2,349.00 | $2,425.00 | $3,405.72 | $2,500.00 |
| 0410 | Single column ground sign assembly, remove (0700-1600) | EACH | 4 | $37.80 | $39.00 | $152.05 | $60.00 |
| 0415 | Multi-column ground sign assembly, F&I ground mount, 50.0 SF (0700-2114) | EACH | 1 | $9,828.00 | $10,200 | $19,505 | $9,500.00 |
| 0420 | Multi-column ground sign assembly, remove (0700-2600) | EACH | 1 | $1,188.00 | $1,250.00 | $2,761.88 | $110.00 |
| 0425 | Delineator, flexible tubular (0705-11-1) | EACH | 15 | $200.00 | $116.00 | $315.98 | $115.00 |
| 0430 | Raised pavement marker, type B (0706-1-3) | EACH | 3,605 | $5.00 | $5.20 | $5.38 | $5.00 |
| 0435 | Painted pavement markings, durable paint, yellow, island nose (0710-12290) | SF | 205 | $10.00 | $2.60 | $11.95 | $12.00 |
| 0440 | Painted pavement markings, surface (0710-90) | LS | 1 | $86,000 | $80,000 | $137,343 | $105,000 |
| 0445 | Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123) | LF | 938 | $4.50 | $6.20 | $4.78 | $5.00 |
| 0450 | Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124) | LF | 509 | $6.00 | $7.75 | $5.98 | $6.00 |
| 0455 | Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125) | LF | 909 | $9.00 | $9.30 | $7.17 | $7.00 |
| 0460 | Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141) | GM | 0.74 | $3,100.00 | $2,275.00 | $4,148.55 | $4,000.00 |
| 0465 | Thermoplastic, standard, message or symbol (0711-11160) | EACH | 7 | $150.00 | $207.00 | $358.51 | $350.00 |
| 0470 | Thermoplastic, standard, arrow (0711-11170) | EACH | 103 | $80.00 | $78.00 | $95.60 | $90.00 |
| 0475 | Thermoplastic, standard, yield line (0711-11180) | LF | 13 | $10.00 | $5.20 | $23.90 | $25.00 |
| 0480 | Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron (0711-11224) | LF | 2,576 | $4.00 | $7.75 | $5.98 | $6.00 |
| 0485 | Thermoplastic, standard, yellow, 2-4 dotted guide line dotted extension line, 6" (0711-11241) | GM | 0.43 | $3,100.00 | $2,285.00 | $4,172.92 | $4,000.00 |
| 0490 | Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125) | LF | 695 | $14.00 | $15.50 | $19.12 | $20.00 |
| 0495 | Thermoplastic, preformed, white, message (0711-14160) | EACH | 5 | $210.00 | $210.00 | $239.01 | $250.00 |
| 0500 | Thermoplastic, preformed, white, arrow (0711-14170) | EACH | 5 | $150.00 | $140.00 | $119.50 | $150.00 |
| 0505 | Thermoplastic, preformed, 6" white, railroad dynamic envelope (0711-14191) | LF | 289 | $8.00 | $7.75 | $11.95 | $12.00 |
| 0510 | Thermoplastic, preformed, 12" white on asphalt pavement, railroad dynamic envelope (0711-14193) | LF | 1,188 | $6.50 | $15.75 | $23.90 | $25.00 |
| 0515 | Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101) | GM | 18.06 | $3,600.00 | $5,400.00 | $6,211.46 | $6,000.00 |
| 0520 | Thermoplastic, standard-other surfaces, white, solid, 8" (0711-16102) | GM | 0.14 | $17,500 | $5,650.00 | $6,971.11 | $7,500.00 |
| 0525 | Thermoplastic, standard-other surfaces, white, skip, 6",10-30 or 3-9 lane drop (0711-16131) | GM | 1.46 | $1,200.00 | $2,400.00 | $4,171.21 | $4,000.00 |
| 0530 | Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201) | GM | 18.57 | $3,600.00 | $5,400.00 | $6,213.88 | $6,000.00 |
| 0535 | Thermoplastic, standard-other surfaces, yellow, skip, 6" (0711-16231) | GM | 0.92 | $1,200.00 | $2,375.00 | $4,146.20 | $4,000.00 |
| 0540 | Permanent tape, white, solid, 6" for concrete bridges (0713-103101) | GM | 0.32 | $35,000 | $36,000 | $32,660 | $32,000 |
| 0545 | Permanent tape, yellow, solid, for concrete bridges (0713-103201) | GM | 0.32 | $35,000 | $36,000 | $32,660 | $32,000 |
| 0550 | Conduit, furnish & install, open trench (0630-2-11) | LF | 1,112 | $9.16 | $9.45 | $30.17 | $12.00 |
| 0555 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 1,192 | $17.46 | $18.00 | $33.14 | $20.00 |
| 0560 | Signal cable- new or reconstructed intersection, furnish & install (0632-7-1) | PI | 2 | $8,519.61 | $8,800.00 | $11,013 | $10,000 |
| 0565 | Fiber optic cable locator (0633-6) | DA | 330 | $280.03 | $290.00 | $384.88 | $350.00 |
| 0570 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 20 | $1,649.94 | $1,720.00 | $1,729.59 | $2,000.00 |
| 0575 | Aluminum signals pole, furnish install pedestrian detector post (0646-1-12) | EACH | 5 | $2,794.17 | $2,900.00 | $3,734.77 | $3,200.00 |
| 0580 | Vehicular signal auxiliaries, repair/replace/retrofit- & install, backplate- flexible required (0650-2109) | EACH | 30 | $742.81 | $770.00 | $946.76 | $900.00 |
| 0585 | Loop assembly, F&I, type B (0660-2102) | AS | 8 | $1,188.97 | $1,250.00 | $1,807.99 | $1,500.00 |
| 0590 | Loop assembly, F&I, type F (0660-2106) | AS | 23 | $1,408.97 | $1,475.00 | $1,975.49 | $1,800.00 |
| 0595 | Pedestrian detector, furnish & install, standard (0665-1-11) | EACH | 5 | $346.43 | $358.00 | $381.32 | $500.00 |
| 0600 | Pedestrian detector, remove- pole/pedestal to remain (0665-1-60) | EACH | 5 | $56.01 | $58.00 | $143.74 | $75.00 |