FDOT contract T2A35 bid tabulation
SR 16 FROM SR 13 TO CR 16A. Let by Florida DOT on August 27, 2025, St Johns, District 2. 8 bids received; low bid $1,427,276 by P & S Paving, Inc..
- Owner
- Florida DOT
- Letting
- 27 AUG 2025
- Pay items
- 54
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | P & S Paving, Inc. | $1,427,276 | Low |
| 2 | Preferred Materials Inc. | $1,469,204 | +3.0% |
| 3 | Hubbard Construction Company | $1,557,950 | +9.0% |
| 4 | Halifax Paving, Inc. | $1,690,921 | +18% |
| 5 | Pigott Asphalt and Sitework LLC | $1,719,364 | +20% |
| 6 | Watson Civil Construction, Inc. | $1,973,270 | +38% |
| 7 | Reeves Construction Company | $2,087,799 | +46% |
| 8 | Duval Asphalt Products, Inc. | $2,155,456 | +51% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. P & S Paving, Inc. | 2. Preferred Materials Inc. | 3. Hubbard Construction Company | 4. Halifax Paving, Inc. | 5. Pigott Asphalt and Sitework LLC | 6. Watson Civil Construction, Inc. |
|---|---|---|---|---|---|---|---|---|---|
| 0005 | Mobilization (0101-1) | LS | 1 | $50,600 | $103,500 | $133,939 | $125,000 | $250,000 | $190,000 |
| 0010 | Maintenance of traffic (0102-1) | DA | 1 | $40,000 | $144,867 | $175,155 | $100,000 | $148,693 | $295,000 |
| 0015 | Work zone sign (0102-60) | ED | 3,775 | $0.30 | $0.25 | $0.28 | $0.25 | $0.30 | $0.35 |
| 0020 | Channelizing device- types I, II, VP, drum, or LCD (0102-74-1) | ED | 9,750 | $0.12 | $0.11 | $0.12 | $0.11 | $0.10 | $0.19 |
| 0025 | Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8) | FD | 52 | $0.18 | $0.10 | $0.11 | $0.10 | $1.00 | $4.40 |
| 0030 | Portable changeable message sign, temporary (0102-99) | ED | 670 | $13.00 | $10.00 | $11.18 | $10.00 | $10.00 | $19.00 |
| 0035 | Type III barricade (0102-115) | ED | 10 | $1.00 | $0.25 | $0.28 | $0.25 | $1.00 | $7.00 |
| 0040 | Sediment barrier (0104-10-3) | LF | 699 | $3.00 | $3.14 | $1.22 | $3.00 | $1.00 | $2.20 |
| 0045 | Floating turbidity barrier (0104-11) | LF | 14 | $50.00 | $14.00 | $66.39 | $20.00 | $50.00 | $63.00 |
| 0050 | Inlet protection system (0104-18) | EACH | 17 | $250.00 | $100.00 | $128.70 | $250.00 | $150.00 | $135.00 |
| 0055 | Litter removal (0107-1) | ACRE | 35.96 | $90.00 | $185.00 | $275.00 | $200.00 | $10.00 | $275.00 |
| 0060 | Mowing (0107-2) | ACRE | 26.16 | $245.00 | $210.00 | $275.00 | $200.00 | $50.00 | $378.00 |
| 0065 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $5,000.00 | $11,109 | $25,490 | $30,000 | $10,000 | $52,000 |
| 0070 | Removal of existing concrete (0110-4-10) | SY | 41 | $82.00 | $110.00 | $73.12 | $100.00 | $100.00 | $110.00 |
| 0075 | Optional base, base group 07 (0285-707) | SY | 6 | $250.00 | $780.31 | $1,251.97 | $500.00 | $300.00 | $1,550.00 |
| 0080 | Milling existing asphalt pavement, 3" avg depth (0327-70-4) | SY | 21,653 | $6.00 | $2.96 | $3.39 | $5.00 | $3.50 | $3.90 |
| 0085 | Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6) | SY | 14,620 | $6.00 | $3.20 | $3.66 | $5.00 | $3.00 | $4.20 |
| 0090 | Superpave asphaltic concrete, traffic C, PG76-22 (0334-1-53) | TN | 1,786.90 | $151.00 | $171.24 | $167.80 | $225.00 | $200.00 | $192.00 |
| 0095 | Asphalt concrete friction course,traffic C, FC-12.5, PG (0337-7-83) | TN | 2,992.50 | $193.00 | $178.52 | $167.05 | $200.00 | $200.00 | $213.00 |
| 0100 | Manhole, adjust, utilities (0425-5-1) | EACH | 2 | $800.00 | $1,700.00 | $2,228.92 | $1,000.00 | $3,500.00 | $4,500.00 |
| 0105 | Valve boxes, adjust (0425-6) | EACH | 4 | $330.00 | $1,550.00 | $2,228.92 | $500.00 | $1,200.00 | $4,200.00 |
| 0110 | Meter boxes, adjust (0425-6-1) | EACH | 1 | $450.00 | $1,250.00 | $2,228.92 | $2,000.00 | $500.00 | $4,200.00 |
| 0115 | Concrete curb & gutter, type F (0520-1-10) | LF | 13 | $85.00 | $220.00 | $135.18 | $100.00 | $150.00 | $170.00 |
| 0120 | Concrete sidewalk and driveways, 4" thick (0522-1) | SY | 6 | $215.00 | $200.00 | $139.28 | $500.00 | $150.00 | $195.00 |
| 0125 | Concrete sidewalk and driveways, 6" thick (0522-2) | SY | 32 | $193.00 | $220.00 | $163.86 | $200.00 | $150.00 | $145.00 |
| 0130 | Detectable warnings (0527-2) | SF | 14 | $50.00 | $47.25 | $74.56 | $55.00 | $50.00 | $49.00 |
| 0135 | Performance turf, sod (0570-1-2) | SY | 5,682 | $7.00 | $4.99 | $4.76 | $5.00 | $4.00 | $8.40 |
| 0140 | Raised pavement marker, type B (0706-1-3) | EACH | 752 | $5.50 | $6.00 | $5.56 | $5.00 | $5.00 | $5.40 |
| 0145 | Painted pavement markings, standard, white, solid, 6" (0710-11101) | GM | 3.38 | $1,400.00 | $2,400.00 | $1,887.19 | $1,300.00 | $1,500.00 | $1,400.00 |
| 0150 | Painted pavement markings, standard, white, solid for crosswalk and roundabout, 12" (0710-11123) | LF | 241 | $2.10 | $3.00 | $2.22 | $2.00 | $2.50 | $2.15 |
| 0155 | Painted pavement markings, standard, white, solid for stop line or crosswalk, 24" (0710-11125) | LF | 99 | $3.00 | $6.10 | $3.33 | $2.75 | $3.00 | $2.95 |
| 0160 | Painted pavement markings, standard, white, 2-4 dotted guideline/ 6-10 dotted 6" (0710-11141) | GM | 0.26 | $925.00 | $870.00 | $1,106.82 | $850.00 | $1,000.00 | $905.00 |
| 0165 | Painted pavement markings, standard, white, message or symbol (0710-11160) | EACH | 5 | $90.00 | $120.00 | $111.11 | $85.00 | $100.00 | $91.00 |
| 0170 | Painted pavement markings, standard, white, arrows (0710-11170) | EACH | 32 | $50.00 | $95.00 | $61.11 | $45.00 | $50.00 | $49.00 |
| 0175 | Painted pavement markings, standard, yellow, solid, 6" (0710-11201) | GM | 4.00 | $1,400.00 | $2,400.00 | $1,886.98 | $1,300.00 | $1,500.00 | $1,400.00 |
| 0180 | Painted pavement markings, standard, yellow, solid for diagonal or chevron, 18" (0710-11224) | LF | 722 | $2.50 | $4.25 | $2.78 | $2.25 | $2.50 | $2.45 |
| 0185 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $50,000 | $50,000 | $50,000 | $50,000 | $50,000 | $50,000 |
| 0190 | Ground-in rumble strips, 8" sinusoidal (0546-72-3) | GM | 2.50 | $9,000.00 | $6,099.44 | $5,373.98 | $8,100.00 | $2,800.00 | $7,000.00 |
| 0195 | Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111) | EACH | 14 | $525.00 | $500.00 | $558.37 | $425.00 | $500.00 | $439.00 |
| 0200 | Single column ground sign assembly, relocate (0700-1500) | EACH | 2 | $80.00 | $75.00 | $83.76 | $150.00 | $150.00 | $155.00 |
| 0205 | Single column ground sign assembly, remove (0700-1600) | EACH | 7 | $60.00 | $55.00 | $61.42 | $50.00 | $75.00 | $52.00 |
| 0210 | Object marker, type 1 (0705-10-1) | EACH | 3 | $320.00 | $295.00 | $329.44 | $325.00 | $350.00 | $336.00 |
| 0215 | Delineator, flexible tubular (0705-11-1) | EACH | 32 | $70.00 | $65.00 | $72.59 | $125.00 | $150.00 | $129.00 |
| 0220 | Raised pavement marker, type B (0706-1-3) | EACH | 752 | $5.50 | $6.00 | $5.56 | $5.00 | $5.00 | $5.40 |
| 0225 | Painted pavement markings, surface (0710-90) | LS | 1 | $22,000 | $19,000 | $36,000 | $20,500 | $25,000 | $15,500 |
| 0230 | Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123) | LF | 241 | $6.50 | $4.50 | $5.56 | $6.00 | $7.00 | $6.50 |
| 0235 | Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125) | LF | 99 | $8.50 | $9.00 | $11.11 | $8.00 | $10.00 | $8.60 |
| 0240 | Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141) | GM | 0.26 | $2,400.00 | $2,400.00 | $5,534.18 | $2,200.00 | $2,500.00 | $2,350.00 |
| 0245 | Thermoplastic, standard, message or symbol (0711-11160) | EACH | 5 | $210.00 | $160.00 | $138.89 | $200.00 | $200.00 | $214.00 |
| 0250 | Thermoplastic, standard, arrow (0711-11170) | EACH | 32 | $80.00 | $125.00 | $111.11 | $75.00 | $75.00 | $81.00 |
| 0255 | Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron (0711-11224) | LF | 722 | $7.50 | $6.00 | $7.22 | $7.00 | $8.00 | $7.50 |
| 0260 | Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125) | LF | 173 | $16.00 | $14.25 | $22.22 | $15.00 | $15.00 | $16.10 |
| 0265 | Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101) | GM | 3.38 | $5,100.00 | $4,000.00 | $6,438.65 | $4,800.00 | $5,000.00 | $4,850.00 |
| 0270 | Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201) | GM | 4.00 | $5,100.00 | $4,000.00 | $6,437.92 | $4,800.00 | $5,000.00 | $4,850.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
Every contract let that day: FDOT letting of August 27, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.