FDOT letting results, August 27, 2025
12 contracts let by Florida DOT on August 27, 2025, $87,024,432 in low bids, a median of 5 bidders per contract.
- Owner
- Florida DOT
- Contracts
- 12
- Low bids, total
- $87,024,432
- Data through
- 28 OCT 2026
Contracts let that day
| Contract | Project | District | Bids | Low bidder | Low bid | Second bid | Gap | Source |
|---|---|---|---|---|---|---|---|---|
| T4688 | SR 817 (UNIVERSITY DR) FROM N OF SR 824 (PEMBROKE RD) TO N.. | District 4 | 7 | Central Civil Construction Co. | $42,867,938 | $43,214,810 | +1.0% | FDOT |
| T1918 | SR 35 (US 98) AT LYLE PKWY AND FROM N OF SR 60 TO N OF CR... | District 1 | 4 | Ajax Paving Industries of Florida LLC | $10,205,482 | $10,317,670 | +1.0% | FDOT |
| T3930 | SR 295 FROM N OF SR 292 (BARRANCAS AVE) TO SR 727/295 | District 3 | 3 | Roads, Inc. of NWF | $8,220,036 | $8,254,628 | 0.0% | FDOT |
| T4715 | SR 817 (UNIVERSITY DR) FROM NOVA DR TO SR 84 | District 4 | 9 | Bacallao Construction & Engineering Development, LLC D/B/A BC&E | $6,850,813 | $7,472,654 | +9.0% | FDOT |
| T2A00 | SR 51 (US 129) FROM N OF I-10 (SR 8) TO HAMILTON CO LINE | District 2 | 1 | Anderson Columbia Co., Inc. | $5,583,777 | FDOT | ||
| T4702 | SR 7 (US 441) AT LAKE WORTH RD | District 4 | 8 | The Stout Group LLC | $3,408,647 | $3,415,198 | 0.0% | FDOT |
| T4728 | N 22ND AVE (SW 12TH AVE) FROM SHERIDAN ST TO STIRLING RD | District 4 | 6 | The Stout Group LLC | $2,926,112 | $3,136,623 | +7.0% | FDOT |
| T5872 | SR 438 (SILVER STAR RD) FROM COAST LINE DR TO DARDANELLE DR | District 5 | 4 | Blacktip Services Incorporated | $2,644,570 | $2,699,032 | +2.0% | FDOT |
| T6609 | SR 986 (SUNSET DR) AND SR 94 (KENDALL DR) AT SW 72ND ST, AT | District 6 | 7 | Florida Engineering & Development Corp | $1,720,968 | $1,744,999 | +1.0% | FDOT |
| T2A35 | SR 16 FROM SR 13 TO CR 16A | District 2 | 8 | P & S Paving, Inc. | $1,427,276 | $1,469,204 | +3.0% | FDOT |
| T5864 | SR 600 (US 92) AT LOCKHART ST | District 5 | 2 | Signal Technology and Installation Corp. | $1,062,598 | $1,204,305 | +13% | FDOT |
| T3986 | SR 10 (US 90) FROM W OF BYRD RD TO OPPORTUNITY LN | District 3 | 3 | TRP Construction Group, LLC | $106,215 | $124,513 | +17% | FDOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than FDOT received, the others did not match their published totals and are left out. Each contract number opens its full bid tabulation.