FDOT contract T1918 bid tabulation

SR 35 (US 98) AT LYLE PKWY AND FROM N OF SR 60 TO N OF CR... Let by Florida DOT on August 27, 2025, Polk, District 1. 4 bids received; low bid $10,205,482 by Ajax Paving Industries of Florida LLC.

Owner
Florida DOT
Letting
27 AUG 2025
Pay items
145
Data through
28 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Ajax Paving Industries of Florida LLC$10,205,482Low
2Hubbard Construction Company$10,317,670+1.0%
3Preferred Materials Inc.$10,526,911+3.0%
4C.W. Roberts Contracting, Inc.$10,669,596+5.0%
FDOT contract T1918: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Ajax Paving Industries of Florida LLC2. Hubbard Construction Company3. Preferred Materials Inc.4. C.W. Roberts Contracting, Inc.
0005Mobilization (0101-1)LS1$413,730$262,722$311,310$694,860
0010Mobilization (0101-1)LS1$111,230$30,000$267,635$129,000
0015Maintenance of traffic (0102-1)DA1$456,840$375,716$389,690$245,400
0020Maintenance of traffic (0102-1)DA1$150,000$45,000$154,195$95,000
0025Pedestrian or bicycle special detour (0102-4-1)SY1$3,955.01$11,946$10,885$4,400.00
0030Traffic control officer (0102-14)HR1,360$87.78$90.53$110.00$91.94
0035Work zone sign (0102-60)ED29,577$0.21$0.22$0.20$0.22
0040Channelizing device- types I, II, VP, drum, or LCD (0102-74-1)ED67,900$0.05$0.09$0.08$0.09
0045Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8)FD1,552$0.15$0.16$0.15$0.16
0050Arrow board / advance warning arrow panel (0102-76)ED328$5.16$5.42$5.00$5.41
0055Portable changeable message sign, temporary (0102-99)ED1,168$9.29$9.76$9.00$9.74
0060Temporary signalization and maintenance, intersection (0102-104)ED2,170$25.92$27.08$25.10$27.51
0065Temporary traffic detection and maintenance, intersection (0102-107-1)ED2,170$15.00$18.24$16.90$18.52
0070Type III barricade (0102-115)ED491$0.25$0.27$0.25$0.27
0075Portable regulatory, sign (0102-150-1)ED1,600$3.00$4.34$4.00$4.33
0080Radar speed display unit (0102-150-2)ED1,600$3.00$4.34$4.00$4.33
0085Sediment barrier (0104-10-3)LF4,312$0.98$0.96$1.75$1.09
0090Inlet protection system (0104-18)EACH135$160.07$175.73$100.00$162.82
0095Litter removal (0107-1)ACRE1,256.44$35.00$37.28$24.75$23.18
0100Mowing (0107-2)ACRE1,034.26$85.00$58.58$32.26$23.18
0105Clearing & grubbing (0110-1-1)ACRE1$11,215$73,678$67,104$22,240
0110Removal of existing concrete (0110-4-10)SY33$138.12$77.23$70.34$42.31
0115Regular excavation (0120-1)CY27.60$135.66$58.68$53.44$105.63
0120Embankment (0120-6)CY66.80$70.96$85.42$77.80$88.50
0125Type B stabilization (0160-4)SY14$272.85$76.37$69.56$60.73
0130Optional base, base group 01 (0285-701)SY43$257.33$89.70$81.70$93.42
0135Optional base, base group 09 (0285-709)SY61$191.19$106.32$96.83$62.31
0140Milling existing asphalt pavement, 4 1/2" avg depth (0327-70-3)SY36,191$2.47$4.20$3.10$4.02
0145Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6)SY17,080$7.67$7.31$10.70$9.47
0150Milling existing asphalt pavement, 2 1/4" avg depth (0327-70-11)SY49,645$1.97$3.62$2.25$2.92
0155Milling existing asphalt pavement, 3 3/4" avg depth (0327-70-20)SY138,360$2.34$4.15$2.50$3.48
0160Superpave asphaltic conc, traffic E (0334-1-15)TN17,448.70$117.46$113.60$113.60$116.43
0165Superpave asphaltic concrete, traffic E, PG76-22 (0334-1-55)TN16,206.20$138.16$146.04$142.80$144.76
0170Asphalt concrete friction course, inc bit, FC-5, PG 76-22 (0337-7-25)TN7,543.70$205.43$202.63$223.85$200.76
0175Asphalt concrete friction course,traffic E, FC-12.5, PG (0337-7-88)TN3,651.90$159.62$154.95$190.95$156.80
0180Inlets, DT bot, type C,<10' (0425-1521)EACH1$5,085.55$8,173.87$7,444.59$3,622.58
0185Inlets, DT bot, type D, <10' (0425-1541)EACH1$5,886.70$8,173.87$7,444.59$5,622.78
0190Pipe culvert,optional material,round, 15"S/CD (0430-175115)LF25$246.61$214.86$195.69$276.13
0195Pipe culvert,optional material,round, 18"S/CD (0430-175118)LF43$124.19$211.77$192.88$208.59
0200Pipe culvert,optional material,round, 24"S/CD (0430-175124)LF4$1,019.34$438.33$399.22$931.31
0205Concrete curb & gutter, type E (0520-1-7)LF94$43.37$70.36$64.08$95.66
0210Concrete curb, type B (0520-2-2)LF52$37.18$65.28$59.46$116.11
0215Concrete sidewalk and driveways, 4" thick (0522-1)SY91$76.94$107.46$97.87$139.34
0220Concrete sidewalk and driveways, 6" thick (0522-2)SY76$97.59$156.14$142.21$194.92
0225Detectable warnings (0527-2)SF124$20.65$31.71$28.88$63.76
0230Performance turf, sod (0570-1-2)SY18,947$4.70$3.38$3.00$5.94
0235Performance turf, sod and shoulder treatment index (0570-1-3)SY104$8.56$13.19$12.01$20.65
0240Electrical power service- contribution in aid of construction (ciac), bartow electric (DO not bid) (0639-8152)LS1$1,200.00$1,200.00$1,200.00$1,200.00
0245Raised pavement marker, type B (0706-1-3)EACH4,061$3.92$4.09$3.80$4.15
0250Painted pavement markings, standard, white, solid, 6" (0710-11101)GM11.96$1,807.28$1,882.46$1,749.85$1,913.54
0255Painted pavement markings, standard, white, solid for interchange and urban island, (0710-11102)GM0.49$2,411.42$2,506.84$2,330.24$2,546.11
0260Painted pavement markings, standard, white, solid for crosswalk and roundabout, 12" (0710-11123)LF3,444$1.65$1.72$1.60$1.75
0265Painted pavement markings, standard, white, solid for diagonal or chevron, 18" (0710-11124)LF1,126$1.76$1.83$1.70$1.86
0270Painted pavement markings, standard, white, solid for stop line or crosswalk, 24" (0710-11125)LF2,351$1.86$1.94$1.80$1.97
0275Painted pavement markings, standard, white, skip, 10-30 or skip, 6" wide (0710-11131)GM14.09$516.36$537.74$499.86$546.93
0280Painted pavement marking, standard,white, 3'-9' skip drop line and approach to toll 12" wide, (0710-11133)GM0.17$1,032.73$1,069.53$994.15$1,086.26
0285Painted pavement markings, standard, white, 2-4 dotted guideline/ 6-10 dotted 6" (0710-11141)GM1.09$697.09$722.14$671.27$71.29
0290Painted pavement markings, standard, white, message or symbol (0710-11160)EACH48$36.15$37.65$35.00$38.24
0295Painted pavement markings, standard, white, arrows (0710-11170)EACH289$30.98$32.27$30.00$32.78
0300Painted pavement markings, standard, yellow, solid, 6" (0710-11201)GM7.57$1,807.28$1,881.87$1,749.31$1,911.34
0305Painted pavement markings, standard, yellow, solid for interchange and urban island, (0710-11202)GM0.03$2,411.42$1,932.31$1,796.15$2,943.85
0310Painted pavement markings, standard, yellow, solid for diagonal or chevron, 18" (0710-11224)LF873$1.76$1.83$1.70$1.86
0315Painted pavement markings, standard, yellow, 2-4 dotted guideline/6-10 dotted extension, 6" (0710-11241)GM0.49$697.09$723.19$672.26$749.51
0320Initial contingency amount, DO not bid (0999-25)LS1$88,136$88,136$88,136$88,136
0325Initial contingency amount, DO not bid (0999-25)LS1$40,000$40,000$40,000$40,000
0330Ground-in rumble strips, 8" sinusoidal (0546-72-3)GM9.22$1,948.21$2,660.05$1,964.79$3,538.70
0335Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111)EACH7$542.18$564.78$525.00$573.63
0340Single column ground sign assembly, relocate (0700-1500)EACH2$129.09$134.48$125.00$136.58
0345Single column ground sign assembly, remove (0700-1600)EACH6$46.47$48.41$45.00$49.17
0350Multi-column ground sign assembly, F&I ground mount, 50.0 SF (0700-2114)EACH2$6,712.74$6,992.56$6,500.00$7,102.09
0355Enhanced highway sign solar powered, F&I ground mount, highlighted sign <12 SF (0700-142140)EACH2$10,327$16,995$15,750$18,028
0360Tubular marker, 36" yellow (0704-1-4)EACH3$129.09$134.47$125.00$136.58
0365Object marker, type 1 (0705-10-1)EACH2$154.91$161.37$150.00$163.90
0370Raised pavement marker, type B (0706-1-3)EACH4,099$3.92$4.09$3.80$4.15
0375Painted pavement markings, standard, yellow, island nose (0710-11290)SF17$4.13$4.30$4.00$4.37
0380Painted pavement markings, surface (0710-90)LS1$64,520$67,209$62,475$68,262
0385Painted pavement markings, surface (0710-90)LS1$3,923.34$4,086.88$3,799.00$4,150.89
0390Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123)LF2,875$3.11$3.24$3.01$3.29
0395Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124)LF1,126$4.67$4.86$4.52$4.94
0400Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125)LF1,096$6.22$6.48$6.02$6.58
0405Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141)GM0.94$2,323.64$2,412.80$2,242.84$2,398.45
0410Thermoplastic, standard, message or symbol (0711-11160)EACH23$70.23$73.15$68.00$74.30
0415Thermoplastic, standard, arrow (0711-11170)EACH264$60.93$63.47$59.00$64.47
0420Thermoplastic, standard, yield line (0711-11180)LF12$17.56$18.29$17.00$18.58
0425Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron (0711-11224)LF873$4.24$4.42$4.11$4.49
0430Thermoplastic, standard, yellow, 2-4 dotted guide line dotted extension line, 6" (0711-11241)GM0.49$2,323.64$2,410.67$2,240.85$2,498.37
0435Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125)LF1,847$15.23$15.87$14.75$16.12
0440Thermoplastic, preformed, white, message (0711-14160)EACH25$196.22$204.40$190.00$207.60
0445Thermoplastic, preformed, white, arrow (0711-14170)EACH25$82.62$86.06$80.00$87.41
0450Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101)GM11.98$4,654.51$4,848.13$4,506.62$4,932.29
0455Thermoplastic, standard-other surfaces, white, solid, 8" (0711-16102)GM0.49$6,205.67$6,451.18$5,996.76$6,552.24
0460Thermoplastic, standard-other surfaces, white, skip, 6",10-30 or 3-9 lane drop (0711-16131)GM14.17$1,163.89$1,211.80$1,126.44$1,232.52
0465Thermoplastic, standard-other surfaces white, skip, 12"- approach to toll plaza or 3-9 lane drop (0711-16133)GM0.17$2,327.77$2,410.64$2,240.82$2,448.36
0470Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201)GM7.63$4,280.66$4,457.94$4,143.91$4,527.76
0475Thermoplastic, standard-other surfaces, yellow, solid, 8" (0711-16202)GM0.03$5,707.90$4,573.85$4,251.54$6,967.69
0480Conduit, furnish & install, open trench (0630-2-11)LF357$18.07$18.88$17.50$19.18
0485Conduit, furnish & install, directional bore (0630-2-12)LF69$45.18$47.21$43.75$47.95
0490Pull & splice box, F&I, 13" X 24" cover size (0635-2-11)EACH8$1,636.88$1,710.29$1,585.00$1,737.08
0495Lighting conductors, F&I, insulated, no 4 to no 2 (0715-1-13)LF1,926$4.23$4.42$4.10$4.49
0500Lighting conductors, remove & dispose, contractor owns (0715-1-60)LF1,247$0.54$0.56$0.52$0.57
0505Luminaire, F&I- replace existing luminaire on existing pole/arm, roadway, pole top (0715-11213)EACH4$3,268.59$3,415.19$3,165.00$3,468.68
0510Light pole complete, F&I, standard pole standard foundation, 45' mounting height, 0' arm length (0715-61400)EACH4$9,991.66$10,440$9,675.00$10,603
0515Light pole complete, F&I, utility conflict pole standard foundation, 45' mounting height, 16' arm length (0715-65466)EACH1$11,153$11,654$10,800$11,836
0520Pole cable distribution system, furnish and install, conventional (0715-500-1)EACH9$852.00$890.22$825.00$904.16
0525Conduit, furnish & install, open trench (0630-2-11)LF834$18.07$18.88$17.50$19.18
0530Conduit, furnish & install, directional bore (0630-2-12)LF476$44.84$46.85$43.42$47.59
0535Signal cable- new or reconstructed intersection, furnish & install (0632-7-1)PI1$12,135$12,679$11,750$12,877
0540Pull & splice box, F&I, 13" X 24" cover size (0635-2-11)EACH26$1,636.88$1,710.29$1,585.00$1,737.08
0545Electrical power service, F&I, underground, meter by contractor (0639-1122)AS1$6,309.98$6,592.99$6,110.00$6,696.26
0550Electrical service wire, & install (0639-2-1)LF30$22.20$23.20$21.50$23.56
0555Prestressed concrete pole, type P-II service pole (0641-2-12)EACH1$2,530.19$2,643.67$2,450.00$2,685.08
0560Aluminum signals pole, (0646-1-11)EACH8$2,798.70$2,924.22$2,710.00$2,970.03
0565Steel mast arm assembly, and install, double arm 70'-50' (0649-21-18)EACH1$113,858$118,965$110,250$120,829
0570Steel mast arm assembly, and install, double arm 78'-60' (0649-21-25)EACH1$130,279$136,122$126,150$138,254
0575Vehicular traffic signal, furnish & install aluminum, 3 section, 1 way (0650-1-14)AS14$2,049.97$2,141.91$1,985.00$2,175.46
0580Pedestrian signal, furnish & install LED countdown, 1 way (0653-1-11)AS8$1,043.06$1,089.84$1,010.00$1,106.91
0585Loop detector inductive, F&I, type 9 (0660-1109)EACH1$438.91$458.60$425.00$465.78
0590Loop detector inductive, F&I, type 10 (0660-1110)EACH11$438.91$458.60$425.00$465.78
0595Loop assembly, F&I, type B (0660-2102)AS54$1,430.33$1,494.48$1,385.00$1,517.89
0600Loop assembly, F&I, type F (0660-2106)AS24$1,833.10$1,926.10$1,725.00$1,956.27
0605Signal priority and preemption system, F&I, optical, cabinet electronics (0663-1111)EACH1$9,165.48$9,576.55$8,875.00$9,726.56
0610Signal priority and preemption system, F&I, optical, detector (0663-1112)EACH4$3,521.61$3,679.56$3,410.00$3,737.19
0615Pedestrian detector, furnish & install, standard (0665-1-11)EACH8$464.73$485.57$450.00$493.18
0620Traffic controller assembly, install (0670-5300)AS1$9,578.57$10,008$9,275.00$10,165
0625Traffic controller, modify (0671-2-40)EACH1$2,695.42$2,816.32$2,610.00$2,860.43
0630Traffic signal controller cabinet, adjust/modify (0676-1500)EACH1$3,702.34$3,868.39$3,585.00$3,928.98
0635ITS CCTV camera, non- pressurized, IP, high definition (0682-1173)EACH1$8,499.36$8,880.57$8,230.00$9,019.67
0640Uninterruptible power supply, install - equipment furnished others (0685-1-30)EACH1$4,399.43$4,596.75$4,260.00$4,668.75
0645Remote power management rpmu, furnish and install (0685-2-1)EACH1$1,249.60$1,305.65$1,210.00$1,326.10
0650Sign panel, furnish & install overhead mount, 12-20 SF (0700-3202)EACH5$1,678.19$1,753.46$1,625.00$1,780.92
0655Initial contingency amount, DO not bid (0999-25)LS1$10,000$10,000$10,000$10,000
0660Itsfm subsurface documentation- project length (0611-1-1)MI0.07$4,399.43$4,116.57$3,814.93$4,877.76
0665Itsfm location documentation- intersection (0611-2-1)EACH1$2,566.33$2,681.44$2,485.00$2,723.44
0670Conduit, furnish & install, directional bore (0630-2-12)LF432$45.18$47.21$43.75$47.95
0675Fiber optic cable, F&I, underground,2-12 fibers (0633-1121)LF923$4.65$4.86$4.50$4.93
0680Fiber optic connection, install, splice (0633-2-31)EACH16$54.73$57.19$53.00$58.09
0685Fiber optic connection, install, termination (0633-2-32)EACH12$92.95$97.11$90.00$98.64
0690Fiber optic connection hardware, F&I, splice (0633-3-11)EACH1$1,559.42$1,629.37$1,510.00$1,654.89
0695Fiber optic connection hardware, F&I, buffer tube fan out kit (0633-3-14)EACH1$99.14$103.58$96.00$105.21
0700Fiber optic connection hardware, F&I, patch panel- terminated (0633-3-16)EACH1$1,745.31$1,823.59$1,690.00$1,852.16
0705Fiber optic connection hardware, F&I, connector panel (0633-3-17)EACH1$170.40$178.04$165.00$180.83
0710Fiber optic cable locator (0633-6)DA400$273.67$285.95$265.00$290.43
0715Pull & splice box, F&I, 24" X 36" cover size (0635-2-12)EACH3$3,304.73$3,452.95$3,200.00$3,507.04
0720Pull & splice box, F&I, 30" X 60" rectangular or 36" round size (0635-2-13)EACH1$6,309.98$6,592.99$6,110.00$6,696.26
0725Managed field ethernet switch, furnish & install (0684-1-1)EACH1$4,977.76$5,201.02$4,820.00$5,282.49
FDOT contract T1918: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.

Every contract let that day: FDOT letting of August 27, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy