| 0005 | Mobilization (0101-1) | LS | 1 | $413,730 | $262,722 | $311,310 | $694,860 |
| 0010 | Mobilization (0101-1) | LS | 1 | $111,230 | $30,000 | $267,635 | $129,000 |
| 0015 | Maintenance of traffic (0102-1) | DA | 1 | $456,840 | $375,716 | $389,690 | $245,400 |
| 0020 | Maintenance of traffic (0102-1) | DA | 1 | $150,000 | $45,000 | $154,195 | $95,000 |
| 0025 | Pedestrian or bicycle special detour (0102-4-1) | SY | 1 | $3,955.01 | $11,946 | $10,885 | $4,400.00 |
| 0030 | Traffic control officer (0102-14) | HR | 1,360 | $87.78 | $90.53 | $110.00 | $91.94 |
| 0035 | Work zone sign (0102-60) | ED | 29,577 | $0.21 | $0.22 | $0.20 | $0.22 |
| 0040 | Channelizing device- types I, II, VP, drum, or LCD (0102-74-1) | ED | 67,900 | $0.05 | $0.09 | $0.08 | $0.09 |
| 0045 | Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8) | FD | 1,552 | $0.15 | $0.16 | $0.15 | $0.16 |
| 0050 | Arrow board / advance warning arrow panel (0102-76) | ED | 328 | $5.16 | $5.42 | $5.00 | $5.41 |
| 0055 | Portable changeable message sign, temporary (0102-99) | ED | 1,168 | $9.29 | $9.76 | $9.00 | $9.74 |
| 0060 | Temporary signalization and maintenance, intersection (0102-104) | ED | 2,170 | $25.92 | $27.08 | $25.10 | $27.51 |
| 0065 | Temporary traffic detection and maintenance, intersection (0102-107-1) | ED | 2,170 | $15.00 | $18.24 | $16.90 | $18.52 |
| 0070 | Type III barricade (0102-115) | ED | 491 | $0.25 | $0.27 | $0.25 | $0.27 |
| 0075 | Portable regulatory, sign (0102-150-1) | ED | 1,600 | $3.00 | $4.34 | $4.00 | $4.33 |
| 0080 | Radar speed display unit (0102-150-2) | ED | 1,600 | $3.00 | $4.34 | $4.00 | $4.33 |
| 0085 | Sediment barrier (0104-10-3) | LF | 4,312 | $0.98 | $0.96 | $1.75 | $1.09 |
| 0090 | Inlet protection system (0104-18) | EACH | 135 | $160.07 | $175.73 | $100.00 | $162.82 |
| 0095 | Litter removal (0107-1) | ACRE | 1,256.44 | $35.00 | $37.28 | $24.75 | $23.18 |
| 0100 | Mowing (0107-2) | ACRE | 1,034.26 | $85.00 | $58.58 | $32.26 | $23.18 |
| 0105 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $11,215 | $73,678 | $67,104 | $22,240 |
| 0110 | Removal of existing concrete (0110-4-10) | SY | 33 | $138.12 | $77.23 | $70.34 | $42.31 |
| 0115 | Regular excavation (0120-1) | CY | 27.60 | $135.66 | $58.68 | $53.44 | $105.63 |
| 0120 | Embankment (0120-6) | CY | 66.80 | $70.96 | $85.42 | $77.80 | $88.50 |
| 0125 | Type B stabilization (0160-4) | SY | 14 | $272.85 | $76.37 | $69.56 | $60.73 |
| 0130 | Optional base, base group 01 (0285-701) | SY | 43 | $257.33 | $89.70 | $81.70 | $93.42 |
| 0135 | Optional base, base group 09 (0285-709) | SY | 61 | $191.19 | $106.32 | $96.83 | $62.31 |
| 0140 | Milling existing asphalt pavement, 4 1/2" avg depth (0327-70-3) | SY | 36,191 | $2.47 | $4.20 | $3.10 | $4.02 |
| 0145 | Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6) | SY | 17,080 | $7.67 | $7.31 | $10.70 | $9.47 |
| 0150 | Milling existing asphalt pavement, 2 1/4" avg depth (0327-70-11) | SY | 49,645 | $1.97 | $3.62 | $2.25 | $2.92 |
| 0155 | Milling existing asphalt pavement, 3 3/4" avg depth (0327-70-20) | SY | 138,360 | $2.34 | $4.15 | $2.50 | $3.48 |
| 0160 | Superpave asphaltic conc, traffic E (0334-1-15) | TN | 17,448.70 | $117.46 | $113.60 | $113.60 | $116.43 |
| 0165 | Superpave asphaltic concrete, traffic E, PG76-22 (0334-1-55) | TN | 16,206.20 | $138.16 | $146.04 | $142.80 | $144.76 |
| 0170 | Asphalt concrete friction course, inc bit, FC-5, PG 76-22 (0337-7-25) | TN | 7,543.70 | $205.43 | $202.63 | $223.85 | $200.76 |
| 0175 | Asphalt concrete friction course,traffic E, FC-12.5, PG (0337-7-88) | TN | 3,651.90 | $159.62 | $154.95 | $190.95 | $156.80 |
| 0180 | Inlets, DT bot, type C,<10' (0425-1521) | EACH | 1 | $5,085.55 | $8,173.87 | $7,444.59 | $3,622.58 |
| 0185 | Inlets, DT bot, type D, <10' (0425-1541) | EACH | 1 | $5,886.70 | $8,173.87 | $7,444.59 | $5,622.78 |
| 0190 | Pipe culvert,optional material,round, 15"S/CD (0430-175115) | LF | 25 | $246.61 | $214.86 | $195.69 | $276.13 |
| 0195 | Pipe culvert,optional material,round, 18"S/CD (0430-175118) | LF | 43 | $124.19 | $211.77 | $192.88 | $208.59 |
| 0200 | Pipe culvert,optional material,round, 24"S/CD (0430-175124) | LF | 4 | $1,019.34 | $438.33 | $399.22 | $931.31 |
| 0205 | Concrete curb & gutter, type E (0520-1-7) | LF | 94 | $43.37 | $70.36 | $64.08 | $95.66 |
| 0210 | Concrete curb, type B (0520-2-2) | LF | 52 | $37.18 | $65.28 | $59.46 | $116.11 |
| 0215 | Concrete sidewalk and driveways, 4" thick (0522-1) | SY | 91 | $76.94 | $107.46 | $97.87 | $139.34 |
| 0220 | Concrete sidewalk and driveways, 6" thick (0522-2) | SY | 76 | $97.59 | $156.14 | $142.21 | $194.92 |
| 0225 | Detectable warnings (0527-2) | SF | 124 | $20.65 | $31.71 | $28.88 | $63.76 |
| 0230 | Performance turf, sod (0570-1-2) | SY | 18,947 | $4.70 | $3.38 | $3.00 | $5.94 |
| 0235 | Performance turf, sod and shoulder treatment index (0570-1-3) | SY | 104 | $8.56 | $13.19 | $12.01 | $20.65 |
| 0240 | Electrical power service- contribution in aid of construction (ciac), bartow electric (DO not bid) (0639-8152) | LS | 1 | $1,200.00 | $1,200.00 | $1,200.00 | $1,200.00 |
| 0245 | Raised pavement marker, type B (0706-1-3) | EACH | 4,061 | $3.92 | $4.09 | $3.80 | $4.15 |
| 0250 | Painted pavement markings, standard, white, solid, 6" (0710-11101) | GM | 11.96 | $1,807.28 | $1,882.46 | $1,749.85 | $1,913.54 |
| 0255 | Painted pavement markings, standard, white, solid for interchange and urban island, (0710-11102) | GM | 0.49 | $2,411.42 | $2,506.84 | $2,330.24 | $2,546.11 |
| 0260 | Painted pavement markings, standard, white, solid for crosswalk and roundabout, 12" (0710-11123) | LF | 3,444 | $1.65 | $1.72 | $1.60 | $1.75 |
| 0265 | Painted pavement markings, standard, white, solid for diagonal or chevron, 18" (0710-11124) | LF | 1,126 | $1.76 | $1.83 | $1.70 | $1.86 |
| 0270 | Painted pavement markings, standard, white, solid for stop line or crosswalk, 24" (0710-11125) | LF | 2,351 | $1.86 | $1.94 | $1.80 | $1.97 |
| 0275 | Painted pavement markings, standard, white, skip, 10-30 or skip, 6" wide (0710-11131) | GM | 14.09 | $516.36 | $537.74 | $499.86 | $546.93 |
| 0280 | Painted pavement marking, standard,white, 3'-9' skip drop line and approach to toll 12" wide, (0710-11133) | GM | 0.17 | $1,032.73 | $1,069.53 | $994.15 | $1,086.26 |
| 0285 | Painted pavement markings, standard, white, 2-4 dotted guideline/ 6-10 dotted 6" (0710-11141) | GM | 1.09 | $697.09 | $722.14 | $671.27 | $71.29 |
| 0290 | Painted pavement markings, standard, white, message or symbol (0710-11160) | EACH | 48 | $36.15 | $37.65 | $35.00 | $38.24 |
| 0295 | Painted pavement markings, standard, white, arrows (0710-11170) | EACH | 289 | $30.98 | $32.27 | $30.00 | $32.78 |
| 0300 | Painted pavement markings, standard, yellow, solid, 6" (0710-11201) | GM | 7.57 | $1,807.28 | $1,881.87 | $1,749.31 | $1,911.34 |
| 0305 | Painted pavement markings, standard, yellow, solid for interchange and urban island, (0710-11202) | GM | 0.03 | $2,411.42 | $1,932.31 | $1,796.15 | $2,943.85 |
| 0310 | Painted pavement markings, standard, yellow, solid for diagonal or chevron, 18" (0710-11224) | LF | 873 | $1.76 | $1.83 | $1.70 | $1.86 |
| 0315 | Painted pavement markings, standard, yellow, 2-4 dotted guideline/6-10 dotted extension, 6" (0710-11241) | GM | 0.49 | $697.09 | $723.19 | $672.26 | $749.51 |
| 0320 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $88,136 | $88,136 | $88,136 | $88,136 |
| 0325 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $40,000 | $40,000 | $40,000 | $40,000 |
| 0330 | Ground-in rumble strips, 8" sinusoidal (0546-72-3) | GM | 9.22 | $1,948.21 | $2,660.05 | $1,964.79 | $3,538.70 |
| 0335 | Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111) | EACH | 7 | $542.18 | $564.78 | $525.00 | $573.63 |
| 0340 | Single column ground sign assembly, relocate (0700-1500) | EACH | 2 | $129.09 | $134.48 | $125.00 | $136.58 |
| 0345 | Single column ground sign assembly, remove (0700-1600) | EACH | 6 | $46.47 | $48.41 | $45.00 | $49.17 |
| 0350 | Multi-column ground sign assembly, F&I ground mount, 50.0 SF (0700-2114) | EACH | 2 | $6,712.74 | $6,992.56 | $6,500.00 | $7,102.09 |
| 0355 | Enhanced highway sign solar powered, F&I ground mount, highlighted sign <12 SF (0700-142140) | EACH | 2 | $10,327 | $16,995 | $15,750 | $18,028 |
| 0360 | Tubular marker, 36" yellow (0704-1-4) | EACH | 3 | $129.09 | $134.47 | $125.00 | $136.58 |
| 0365 | Object marker, type 1 (0705-10-1) | EACH | 2 | $154.91 | $161.37 | $150.00 | $163.90 |
| 0370 | Raised pavement marker, type B (0706-1-3) | EACH | 4,099 | $3.92 | $4.09 | $3.80 | $4.15 |
| 0375 | Painted pavement markings, standard, yellow, island nose (0710-11290) | SF | 17 | $4.13 | $4.30 | $4.00 | $4.37 |
| 0380 | Painted pavement markings, surface (0710-90) | LS | 1 | $64,520 | $67,209 | $62,475 | $68,262 |
| 0385 | Painted pavement markings, surface (0710-90) | LS | 1 | $3,923.34 | $4,086.88 | $3,799.00 | $4,150.89 |
| 0390 | Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123) | LF | 2,875 | $3.11 | $3.24 | $3.01 | $3.29 |
| 0395 | Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124) | LF | 1,126 | $4.67 | $4.86 | $4.52 | $4.94 |
| 0400 | Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125) | LF | 1,096 | $6.22 | $6.48 | $6.02 | $6.58 |
| 0405 | Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141) | GM | 0.94 | $2,323.64 | $2,412.80 | $2,242.84 | $2,398.45 |
| 0410 | Thermoplastic, standard, message or symbol (0711-11160) | EACH | 23 | $70.23 | $73.15 | $68.00 | $74.30 |
| 0415 | Thermoplastic, standard, arrow (0711-11170) | EACH | 264 | $60.93 | $63.47 | $59.00 | $64.47 |
| 0420 | Thermoplastic, standard, yield line (0711-11180) | LF | 12 | $17.56 | $18.29 | $17.00 | $18.58 |
| 0425 | Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron (0711-11224) | LF | 873 | $4.24 | $4.42 | $4.11 | $4.49 |
| 0430 | Thermoplastic, standard, yellow, 2-4 dotted guide line dotted extension line, 6" (0711-11241) | GM | 0.49 | $2,323.64 | $2,410.67 | $2,240.85 | $2,498.37 |
| 0435 | Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125) | LF | 1,847 | $15.23 | $15.87 | $14.75 | $16.12 |
| 0440 | Thermoplastic, preformed, white, message (0711-14160) | EACH | 25 | $196.22 | $204.40 | $190.00 | $207.60 |
| 0445 | Thermoplastic, preformed, white, arrow (0711-14170) | EACH | 25 | $82.62 | $86.06 | $80.00 | $87.41 |
| 0450 | Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101) | GM | 11.98 | $4,654.51 | $4,848.13 | $4,506.62 | $4,932.29 |
| 0455 | Thermoplastic, standard-other surfaces, white, solid, 8" (0711-16102) | GM | 0.49 | $6,205.67 | $6,451.18 | $5,996.76 | $6,552.24 |
| 0460 | Thermoplastic, standard-other surfaces, white, skip, 6",10-30 or 3-9 lane drop (0711-16131) | GM | 14.17 | $1,163.89 | $1,211.80 | $1,126.44 | $1,232.52 |
| 0465 | Thermoplastic, standard-other surfaces white, skip, 12"- approach to toll plaza or 3-9 lane drop (0711-16133) | GM | 0.17 | $2,327.77 | $2,410.64 | $2,240.82 | $2,448.36 |
| 0470 | Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201) | GM | 7.63 | $4,280.66 | $4,457.94 | $4,143.91 | $4,527.76 |
| 0475 | Thermoplastic, standard-other surfaces, yellow, solid, 8" (0711-16202) | GM | 0.03 | $5,707.90 | $4,573.85 | $4,251.54 | $6,967.69 |
| 0480 | Conduit, furnish & install, open trench (0630-2-11) | LF | 357 | $18.07 | $18.88 | $17.50 | $19.18 |
| 0485 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 69 | $45.18 | $47.21 | $43.75 | $47.95 |
| 0490 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 8 | $1,636.88 | $1,710.29 | $1,585.00 | $1,737.08 |
| 0495 | Lighting conductors, F&I, insulated, no 4 to no 2 (0715-1-13) | LF | 1,926 | $4.23 | $4.42 | $4.10 | $4.49 |
| 0500 | Lighting conductors, remove & dispose, contractor owns (0715-1-60) | LF | 1,247 | $0.54 | $0.56 | $0.52 | $0.57 |
| 0505 | Luminaire, F&I- replace existing luminaire on existing pole/arm, roadway, pole top (0715-11213) | EACH | 4 | $3,268.59 | $3,415.19 | $3,165.00 | $3,468.68 |
| 0510 | Light pole complete, F&I, standard pole standard foundation, 45' mounting height, 0' arm length (0715-61400) | EACH | 4 | $9,991.66 | $10,440 | $9,675.00 | $10,603 |
| 0515 | Light pole complete, F&I, utility conflict pole standard foundation, 45' mounting height, 16' arm length (0715-65466) | EACH | 1 | $11,153 | $11,654 | $10,800 | $11,836 |
| 0520 | Pole cable distribution system, furnish and install, conventional (0715-500-1) | EACH | 9 | $852.00 | $890.22 | $825.00 | $904.16 |
| 0525 | Conduit, furnish & install, open trench (0630-2-11) | LF | 834 | $18.07 | $18.88 | $17.50 | $19.18 |
| 0530 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 476 | $44.84 | $46.85 | $43.42 | $47.59 |
| 0535 | Signal cable- new or reconstructed intersection, furnish & install (0632-7-1) | PI | 1 | $12,135 | $12,679 | $11,750 | $12,877 |
| 0540 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 26 | $1,636.88 | $1,710.29 | $1,585.00 | $1,737.08 |
| 0545 | Electrical power service, F&I, underground, meter by contractor (0639-1122) | AS | 1 | $6,309.98 | $6,592.99 | $6,110.00 | $6,696.26 |
| 0550 | Electrical service wire, & install (0639-2-1) | LF | 30 | $22.20 | $23.20 | $21.50 | $23.56 |
| 0555 | Prestressed concrete pole, type P-II service pole (0641-2-12) | EACH | 1 | $2,530.19 | $2,643.67 | $2,450.00 | $2,685.08 |
| 0560 | Aluminum signals pole, (0646-1-11) | EACH | 8 | $2,798.70 | $2,924.22 | $2,710.00 | $2,970.03 |
| 0565 | Steel mast arm assembly, and install, double arm 70'-50' (0649-21-18) | EACH | 1 | $113,858 | $118,965 | $110,250 | $120,829 |
| 0570 | Steel mast arm assembly, and install, double arm 78'-60' (0649-21-25) | EACH | 1 | $130,279 | $136,122 | $126,150 | $138,254 |
| 0575 | Vehicular traffic signal, furnish & install aluminum, 3 section, 1 way (0650-1-14) | AS | 14 | $2,049.97 | $2,141.91 | $1,985.00 | $2,175.46 |
| 0580 | Pedestrian signal, furnish & install LED countdown, 1 way (0653-1-11) | AS | 8 | $1,043.06 | $1,089.84 | $1,010.00 | $1,106.91 |
| 0585 | Loop detector inductive, F&I, type 9 (0660-1109) | EACH | 1 | $438.91 | $458.60 | $425.00 | $465.78 |
| 0590 | Loop detector inductive, F&I, type 10 (0660-1110) | EACH | 11 | $438.91 | $458.60 | $425.00 | $465.78 |
| 0595 | Loop assembly, F&I, type B (0660-2102) | AS | 54 | $1,430.33 | $1,494.48 | $1,385.00 | $1,517.89 |
| 0600 | Loop assembly, F&I, type F (0660-2106) | AS | 24 | $1,833.10 | $1,926.10 | $1,725.00 | $1,956.27 |
| 0605 | Signal priority and preemption system, F&I, optical, cabinet electronics (0663-1111) | EACH | 1 | $9,165.48 | $9,576.55 | $8,875.00 | $9,726.56 |
| 0610 | Signal priority and preemption system, F&I, optical, detector (0663-1112) | EACH | 4 | $3,521.61 | $3,679.56 | $3,410.00 | $3,737.19 |
| 0615 | Pedestrian detector, furnish & install, standard (0665-1-11) | EACH | 8 | $464.73 | $485.57 | $450.00 | $493.18 |
| 0620 | Traffic controller assembly, install (0670-5300) | AS | 1 | $9,578.57 | $10,008 | $9,275.00 | $10,165 |
| 0625 | Traffic controller, modify (0671-2-40) | EACH | 1 | $2,695.42 | $2,816.32 | $2,610.00 | $2,860.43 |
| 0630 | Traffic signal controller cabinet, adjust/modify (0676-1500) | EACH | 1 | $3,702.34 | $3,868.39 | $3,585.00 | $3,928.98 |
| 0635 | ITS CCTV camera, non- pressurized, IP, high definition (0682-1173) | EACH | 1 | $8,499.36 | $8,880.57 | $8,230.00 | $9,019.67 |
| 0640 | Uninterruptible power supply, install - equipment furnished others (0685-1-30) | EACH | 1 | $4,399.43 | $4,596.75 | $4,260.00 | $4,668.75 |
| 0645 | Remote power management rpmu, furnish and install (0685-2-1) | EACH | 1 | $1,249.60 | $1,305.65 | $1,210.00 | $1,326.10 |
| 0650 | Sign panel, furnish & install overhead mount, 12-20 SF (0700-3202) | EACH | 5 | $1,678.19 | $1,753.46 | $1,625.00 | $1,780.92 |
| 0655 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $10,000 | $10,000 | $10,000 | $10,000 |
| 0660 | Itsfm subsurface documentation- project length (0611-1-1) | MI | 0.07 | $4,399.43 | $4,116.57 | $3,814.93 | $4,877.76 |
| 0665 | Itsfm location documentation- intersection (0611-2-1) | EACH | 1 | $2,566.33 | $2,681.44 | $2,485.00 | $2,723.44 |
| 0670 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 432 | $45.18 | $47.21 | $43.75 | $47.95 |
| 0675 | Fiber optic cable, F&I, underground,2-12 fibers (0633-1121) | LF | 923 | $4.65 | $4.86 | $4.50 | $4.93 |
| 0680 | Fiber optic connection, install, splice (0633-2-31) | EACH | 16 | $54.73 | $57.19 | $53.00 | $58.09 |
| 0685 | Fiber optic connection, install, termination (0633-2-32) | EACH | 12 | $92.95 | $97.11 | $90.00 | $98.64 |
| 0690 | Fiber optic connection hardware, F&I, splice (0633-3-11) | EACH | 1 | $1,559.42 | $1,629.37 | $1,510.00 | $1,654.89 |
| 0695 | Fiber optic connection hardware, F&I, buffer tube fan out kit (0633-3-14) | EACH | 1 | $99.14 | $103.58 | $96.00 | $105.21 |
| 0700 | Fiber optic connection hardware, F&I, patch panel- terminated (0633-3-16) | EACH | 1 | $1,745.31 | $1,823.59 | $1,690.00 | $1,852.16 |
| 0705 | Fiber optic connection hardware, F&I, connector panel (0633-3-17) | EACH | 1 | $170.40 | $178.04 | $165.00 | $180.83 |
| 0710 | Fiber optic cable locator (0633-6) | DA | 400 | $273.67 | $285.95 | $265.00 | $290.43 |
| 0715 | Pull & splice box, F&I, 24" X 36" cover size (0635-2-12) | EACH | 3 | $3,304.73 | $3,452.95 | $3,200.00 | $3,507.04 |
| 0720 | Pull & splice box, F&I, 30" X 60" rectangular or 36" round size (0635-2-13) | EACH | 1 | $6,309.98 | $6,592.99 | $6,110.00 | $6,696.26 |
| 0725 | Managed field ethernet switch, furnish & install (0684-1-1) | EACH | 1 | $4,977.76 | $5,201.02 | $4,820.00 | $5,282.49 |