FDOT contract T3986 bid tabulation

SR 10 (US 90) FROM W OF BYRD RD TO OPPORTUNITY LN. Let by Florida DOT on August 27, 2025, Gadsden, District 3. 3 bids received; low bid $106,215 by TRP Construction Group, LLC.

Owner
Florida DOT
Letting
27 AUG 2025
Pay items
14
Data through
28 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1TRP Construction Group, LLC$106,215Low
2Emerald Coast Striping, LLC.$124,513+17%
3Acme Barricades LC$230,660+117%
FDOT contract T3986: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. TRP Construction Group, LLC2. Emerald Coast Striping, LLC.3. Acme Barricades LC
0005Mobilization (0101-1)LS1$15,000$8,500.00$75,000
0010Maintenance of traffic (0102-1)DA1$4,000.00$6,500.00$25,000
0015Work zone sign (0102-60)ED144$0.30$1.50$1.00
0020Channelizing device- types I, II, VP, drum, or LCD (0102-74-1)ED1,800$0.10$0.25$0.10
0025Arrow board / advance warning arrow panel (0102-76)ED12$6.00$10.00$5.00
0030Portable changeable message sign, temporary (0102-99)ED12$12.00$25.00$12.00
0035Portable regulatory, sign (0102-150-1)ED24$6.00$10.00$5.00
0040Radar speed display unit (0102-150-2)ED24$6.00$10.00$5.00
0045Profiled thermoplastic,remove existing non-conflicting profiled markings (0701-16)SF7,888$0.75$2.00$3.00
0050Profiled thermoplastic,standard- asphalt surfaces, white, (0701-18101)GM3.53$8,200.00$8,500.00$9,500.00
0055Profiled thermoplastic,standard- asphalt surfaces, yellow, solid,6" (0701-18201)GM3.29$8,200.00$8,500.00$9,500.00
0060Painted pavement markings, surface (0710-90)LS1$7,000.00$9,000.00$11,200
0065Thermoplastic, remove existing thermoplastic pavement markings- surface to remain (0711-17-1)SF10,071$0.75$1.50$2.00
0070Initial contingency amount, DO not bid (0999-25)LS1$10,086$10,086$10,086
FDOT contract T3986: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.

Every contract let that day: FDOT letting of August 27, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy