TRP Construction Group, LLC: FDOT bid record
TRP Construction Group, LLC submitted 21 bids on Florida DOT contracts in the data, from 29 SEP 2021 to 27 AUG 2025, and was the low bidder on 10 of them (48%). When it was not low, its total sat a median +18% above the low bid.
- Owner
- Florida DOT
- Low bid volume
- $10,697,328
- Latest bid
- 27 AUG 2025
- Data through
- 28 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2021 | 1 | 0 | 0% |
| 2022 | 1 | 1 | 100% |
| 2023 | 7 | 3 | 43% |
| 2024 | 9 | 3 | 33% |
| 2025 | 3 | 3 | 100% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| District 2 | 5 | 4 | 80% |
| District 5 | 5 | 2 | 40% |
| District 3 | 5 | 3 | 60% |
| District 1 | 2 | 0 | 0% |
| District 4 | 2 | 1 | 50% |
| District 6 | 1 | 0 | 0% |
| District 7 | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Thermoplastic, refurbishment, yellow, solid, 6" | 0711-12201 | GM | 18 | 16 (89%) | $2,650.00 | $3,400.00 |
| Thermoplastic, refurbishment, white, solid, 6" | 0711-12101 | GM | 14 | 12 (86%) | $2,800.00 | $3,300.00 |
| Thermoplastic, refurbishment, yellow, skip, 6" | 0711-12231 | GM | 17 | 10 (59%) | $1,200.00 | $1,375.00 |
| Arrow board / advance warning arrow panel | 0102-76 | ED | 17 | 9 (53%) | $6.00 | $5.90 |
| Painted pavement markings, standard, white, solid, 6" | 0710-11101 | GM | 12 | 6 (50%) | $900.00 | $1,350.00 |
| Painted pavement markings, standard, yellow, solid, 6" | 0710-11201 | GM | 12 | 6 (50%) | $900.00 | $1,350.00 |
| Painted pavement markings, standard, yellow, skip, 6" | 0710-11231 | GM | 11 | 6 (55%) | $450.00 | $582.89 |
| Portable changeable message sign, temporary | 0102-99 | ED | 8 | 6 (75%) | $13.00 | $12.00 |
| Channelizing device- types I, II, VP, drum, or LCD | 0102-74-1 | ED | 10 | 5 (50%) | $0.10 | $0.13 |
| Thermoplastic, standard-other surfaces, white, solid, 6" | 0711-16101 | GM | 5 | 4 (80%) | $3,500.00 | $5,220.00 |
| Thermoplastic, standard-other surfaces, yellow, skip, 6" | 0711-16231 | GM | 5 | 4 (80%) | $1,600.00 | $1,924.68 |
| Work zone sign | 0102-60 | ED | 20 | 3 (15%) | $0.30 | $0.25 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Oglesby Construction, Inc. | 13 | 4 of 13 |
| Akca, LLC | 13 | 5 of 13 |
| Acme Barricades LC | 12 | 0 of 12 |
| Emerald Coast Striping, LLC. | 11 | 3 of 11 |
| McShea Contracting, LLC | 7 | 3 of 7 |
| Alexander Design + Build, LLC | 3 | 1 of 3 |
| Weekley Asphalt Paving, Inc. | 1 | 1 of 1 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 27 AUG 2025 | T3986 | District 3 | SR 10 (US 90) FROM W OF BYRD RD TO OPPORTUNITY LN | 1 of 3 | $106,215 | Low, 17% under the second |
| 30 JUL 2025 | T2A32 | District 2 | DISTRICT WIDE RUMBLE STRIPING AT VARIOUS | 1 of 2 | $1,287,630 | Low, 15% under the second |
| 29 JAN 2025 | T3974 | District 3 | SR 30 (US 98), SR 10 (US 90), SR 12, SR 61 (US 319), SR 369 | 1 of 4 | $664,538 | Low, 1.0% under the second |
| 13 NOV 2024 | T3936 | District 3 | SR 20, SR 73, SR 30 (US 98), SR 30A, SR 73 AND SR 69 AT VAR | 1 of 3 | $993,728 | Low, 16% under the second |
| 22 MAY 2024 | T4687 | District 4 | DISTRICTWIDE RUMBLE STRIPS AT VARIOUS | 1 of 3 | $1,600,545 | Low, 17% under the second |
| 22 MAY 2024 | T5826 | District 5 | DISTRICTWIDE RUMBLE STRIPES AT VARIOUS LOCATIONS AS SHOWN... | 3 of 3 | $1,399,040 | +18% |
| 22 MAY 2024 | T5827 | District 5 | DISTRICTWIDE RUMBLE STRIPES AT VARIOUS LOCATIONS AS SHOWN... | 2 of 4 | $857,371 | +2.0% |
| 22 MAY 2024 | T5828 | District 5 | DISTRICTWIDE RUMBLE STRIPES AT VARIOUS LOCATIONS AS SHOWN... | 3 of 3 | $628,895 | +31% |
| 24 APR 2024 | T2982 | District 2 | DISTRICT WIDE RUMBLE STRIPS AT VARIOUS LOCATIONS AS SHOWN... | 2 of 4 | $3,648,202 | +20% |
| 31 JAN 2024 | T1886 | District 1 | DISTRICTWIDE RUMBLE STRIPS, AT VARIOUS LOCATIONS AS SHOWN | 2 of 4 | $3,617,306 | +8.0% |
| 31 JAN 2024 | T2981 | District 2 | SR 222/26, SR 20/25, SR 45, SR 20, SR 200, SR 26/24/20 ... | 1 of 4 | $2,914,229 | Low, 10% under the second |
| 31 JAN 2024 | T4678 | District 4 | DISTRICTWIDE RUMBLE STRIPS AT VARIOUS LOCATIONS AS SHOWN ... | 2 of 4 | $738,504 | +13% |
| 06 DEC 2023 | T5820 | District 5 | SR A1A, SR 5, SR 44, SR 11, SR 415 AND SR 5A | 1 of 6 | $607,569 | Low, 3.0% under the second |
| 06 DEC 2023 | T5821 | District 5 | SR 35, SR 25, SR 45, SR 500, SR 19 AND SR 200 | 1 of 6 | $843,345 | Low, 2.0% under the second |
| 06 DEC 2023 | T7518 | District 7 | SR 45, SR 55, SR 597, SR 54 AND SR 56 AT VARIOUS L O C A T I O N S | 2 of 2 | $1,052,394 | +16% |
| 25 OCT 2023 | T2980 | District 2 | SR 20, SR 21, SR 26, SR 100, SR A1A, SR 312, SR 207, SR 16, | 1 of 5 | $1,193,458 | Low, 37% under the second |
| 25 OCT 2023 | T3889 | District 3 | VARIOUS LOCATIONS AS SHOWN IN THE PLANS | 2 of 4 | $1,727,463 | +10% |
| 27 SEP 2023 | T1871 | District 1 | 45224115201 | 4 of 5 | $4,528,437 | +22% |
| 13 SEP 2023 | T3886 | District 3 | DISTRICT WIDE AT VARIOUS LOCATIONS AS SHOWN IN THE PLANS | 3 of 4 | $2,168,199 | +50% |
| 27 APR 2022 | T2852 | District 2 | DISTRICTWIDE SAFETY PUSH BUTTON, ON SYSTEM (2ND) | 1 of 5 | $486,070 | Low, 32% under the second |
| 29 SEP 2021 | T6560 | District 6 | SR 9A (I-95) & SR 5 (US 1) (OVERSEAS HWY) | 3 of 3 | $608,239 | +26% |
How this record was read
FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
- Every bid counted here matched its published total to within one dollar; FDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.