FDOT contract T3974 bid tabulation
SR 30 (US 98), SR 10 (US 90), SR 12, SR 61 (US 319), SR 369. Let by Florida DOT on January 29, 2025, Dist/St-Wide, District 3. 4 bids received; low bid $664,538 by TRP Construction Group, LLC.
- Owner
- Florida DOT
- Letting
- 29 JAN 2025
- Pay items
- 16
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | TRP Construction Group, LLC | $664,538 | Low |
| 2 | Emerald Coast Striping, LLC. | $670,616 | +1.0% |
| 3 | Acme Barricades LC | $788,671 | +19% |
| 4 | Akca, LLC | $901,491 | +36% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. TRP Construction Group, LLC | 2. Emerald Coast Striping, LLC. | 3. Acme Barricades LC | 4. Akca, LLC |
|---|---|---|---|---|---|---|---|
| 0005 | Mobilization (0101-1) | LS | 1 | $40,000 | $25,000 | $80,000 | $130,000 |
| 0010 | Maintenance of traffic (0102-1) | DA | 1 | $40,000 | $50,000 | $50,000 | $65,000 |
| 0015 | Traffic control officer (0102-14) | HR | 224 | $100.00 | $100.00 | $85.00 | $118.00 |
| 0020 | Work zone sign (0102-60) | ED | 1,225 | $0.30 | $0.25 | $0.30 | $0.28 |
| 0025 | Channelizing device- types I, II, VP, drum, or LCD (0102-74-1) | ED | 9,016 | $0.10 | $0.10 | $0.12 | $0.08 |
| 0030 | Arrow board / advance warning arrow panel (0102-76) | ED | 175 | $1.25 | $5.00 | $5.00 | $5.25 |
| 0035 | Temporary raised rumble per day, includes all sets and relocations (0102-909) | DA | 28 | $35.00 | $10.00 | $50.00 | $40.00 |
| 0040 | Painted pavement markings, standard, white, solid, 6" (0710-11101) | GM | 31.82 | $700.00 | $800.00 | $750.00 | $900.00 |
| 0045 | Painted pavement markings, standard, yellow, solid, 6" (0710-11201) | GM | 32.35 | $700.00 | $800.00 | $750.00 | $900.00 |
| 0050 | Painted pavement markings, standard, yellow, skip, 6" (0710-11231) | GM | 28.81 | $300.00 | $400.00 | $500.00 | $400.00 |
| 0055 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $50,000 | $50,000 | $50,000 | $50,000 |
| 0060 | Ground-in rumble strips, 8" sinusoidal (0546-72-3) | GM | 120.94 | $2,000.00 | $1,500.00 | $1,965.00 | $2,400.00 |
| 0065 | Raised pavement marker, type B (0706-1-3) | EACH | 8,073 | $4.25 | $3.75 | $4.25 | $5.00 |
| 0070 | Thermoplastic, refurbishment, white, solid, 6" (0711-12101) | GM | 31.82 | $2,400.00 | $3,300.00 | $3,200.00 | $3,000.00 |
| 0075 | Thermoplastic, refurbishment, yellow, solid, 6" (0711-12201) | GM | 32.35 | $2,400.00 | $3,300.00 | $3,200.00 | $3,000.00 |
| 0080 | Thermoplastic, refurbishment, yellow, skip, 6" (0711-12231) | GM | 28.81 | $900.00 | $1,200.00 | $1,600.00 | $1,200.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
Every contract let that day: FDOT letting of January 29, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.