FDOT letting results, September 27, 2023
16 contracts let by Florida DOT on September 27, 2023, $172,660,364 in low bids, a median of 3 bidders per contract.
- Owner
- Florida DOT
- Contracts
- 16
- Low bids, total
- $172,660,364
- Data through
- 28 OCT 2026
Contracts let that day
| Contract | Project | District | Bids | Low bidder | Low bid | Second bid | Gap | Source |
|---|---|---|---|---|---|---|---|---|
| T3854 | SR 8 (I-10) OVER SR 10 (US 90A) (NINE MILE RD), BRIDGE NOS. | District 3 | 2 | Webber, LLC | $55,462,468 | $65,895,915 | +19% | FDOT |
| T4570 | CR 712 (W MIDWAY RD), FROM W OF JENKINS RD TO SELVITZ RD | District 4 | 5 | Halley Engineering Contractors, Inc. | $23,548,832 | $24,975,525 | +6.0% | FDOT |
| T5809 | SR 11 (PERKINS HWY) AT CR 304 AND FROM VOLUSIA CO LINE TO | District 5 | 2 | Masci General Contractors, Inc | $19,059,007 | $20,870,934 | +10% | FDOT |
| T2943 | SR 9A (I-295) FROM PULASKI RD TO NEW BERLIN RD | District 2 | 1 | Preferred Materials Inc. | $16,112,400 | FDOT | ||
| T5801 | SR 100 FROM N PALMETTO ST TO E OF OLD KINGS RD S | District 5 | 3 | Halifax Paving, Inc. | $15,286,323 | $17,947,880 | +17% | FDOT |
| T4615 | SR-5 (US 1) FROM SR 580 (NORTHLAKE BLVD) OVER EARMAN RIVER.. | District 4 | 2 | Cone & Graham, Inc. | $12,771,985 | $19,096,985 | +50% | FDOT |
| T5806 | SR 25 (US 27) FROM LAKE LOUISA RD TO CLUSTER OAK DR | District 5 | 5 | Superior Asphalt, Inc. | $9,892,142 | $9,940,108 | 0.0% | FDOT |
| T3873 | SR 261 (US 319) (CAPITAL CIRCLE) FROM SR 20 (US 27) (APAL.. | District 3 | 4 | C.W. Roberts Contracting, Inc. | $4,307,269 | $5,050,000 | +17% | FDOT |
| T1871 | 45224115201 | District 1 | 5 | Akca, LLC | $3,701,415 | $4,095,039 | +11% | FDOT |
| T5805 | SR 5 (US 1) FROM N OF ROCKY POINT RD TO S OF SR 514 (MALABAR | District 5 | 3 | V.A. Paving, Inc. | $3,271,306 | $4,998,498 | +53% | FDOT |
| T7514 | SR 41 (US 301) AT HARNEY RD, STACY RD AND MCINTOSH RD INTERS | District 7 | 3 | Preferred Materials Inc. | $2,469,300 | $2,784,953 | +13% | FDOT |
| T3881 | SR 20 FROM E OF APALACHICOLA RIVER BRIDGE TO E OF NW REV... | District 3 | 3 | C.W. Roberts Contracting, Inc. | $2,142,434 | $2,180,644 | +2.0% | FDOT |
| T2944 | SR 115 (SOUTHSIDE BLVD) AT SR10 (US90) (ATLANTIC BLVD) | District 2 | 3 | Maer Homes, LLC | $1,793,115 | $1,895,397 | +6.0% | FDOT |
| T3868 | SR 30 (US 98) (EMERALD COAST PKWY) | District 3 | 1 | Ingram Signalization, Inc. | $1,298,401 | FDOT | ||
| T3874 | SR 390 (BECK AVENUE) AT 19TH ST INTERSECTION | District 3 | 1 | Ingram Signalization, Inc. | $988,409 | FDOT | ||
| T4647 | SR 817 (UNIVERSITY DR) AT 28 SEPARATE INTERSECTIONS | District 4 | 4 | Arc Electric Inc | $555,556 | $569,570 | +3.0% | FDOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than FDOT received, the others did not match their published totals and are left out.