FDOT letting results, May 22, 2024
25 contracts let by Florida DOT on May 22, 2024, $214,680,057 in low bids, a median of 3 bidders per contract.
- Owner
- Florida DOT
- Contracts
- 25
- Low bids, total
- $214,680,057
- Data through
- 28 OCT 2026
Contracts let that day
| Contract | Project | District | Bids | Low bidder | Low bid | Second bid | Gap | Source |
|---|---|---|---|---|---|---|---|---|
| T1865 | SR 82 FROM HENDRY CO LINE TO GATOR SLOUGH LN | District 1 | 3 | Ajax Paving Industries of Florida LLC | $52,146,382 | $55,285,279 | +6.0% | FDOT |
| T4655 | SR 806 (ATLANTIC AVE) FROM W OF SR 7 (US 441) TO SR 91 (FL.. | District 4 | 4 | Ohla USA Inc | $25,997,403 | $28,817,167 | +11% | FDOT |
| T2979 | SR 13 FROM S OF I-295 TO N OF SUNBEAM RD | District 2 | 5 | Watson Civil Construction, Inc. | $16,810,870 | $16,813,067 | 0.0% | FDOT |
| T5825 | SR 5 (US 1) FROM RIDGEWOOD AVE TO N OF PALM COAST PKWY | District 5 | 3 | Halifax Paving, Inc. | $15,197,167 | $16,233,433 | +7.0% | FDOT |
| T3922 | SR 79 FROM WEST BAY BRIDGE TO S OF CREWS LAKE RD | District 3 | 2 | C.W. Roberts Contracting, Inc. | $14,877,517 | $16,050,568 | +8.0% | FDOT |
| T7540 | SR 55 (US 19) FROM S OF CR 528 (DREW ST) TO N OF CR 576 (SUN | District 7 | 3 | Preferred Materials Inc. | $12,969,327 | $13,588,522 | +5.0% | FDOT |
| T5813 | SR 19 FROM N OF STEVENS AVE TO CR 452 | District 5 | 4 | Southland Construction, Inc. | $12,355,556 | $12,769,711 | +3.0% | FDOT |
| T7530 | SR 580 (SKINNER BLVD) FROM ALT US 19 (BROADWAY) TO MAIN ST | District 7 | 3 | De Moya Highway Infrastructure LLC | $9,184,009 | $9,268,450 | +1.0% | FDOT |
| T6566 | SR 932 (NW 103 ST / W 49 ST) FROM W OF NW 82 AVE TO E... | District 6 | 6 | Bacallao Construction & Engineering Development, LLC D/B/A B | $8,253,113 | $8,285,496 | 0.0% | FDOT |
| T4677 | SR 810 (HILLSBORO BLVD) FROM SR 7 (US 441) TO SR 845 (POW... | District 4 | 4 | Weekley Asphalt Paving, Inc. | $7,765,433 | $8,287,949 | +7.0% | FDOT |
| T9036 | SR 8 (I-10) AT EB AND WB MADISON WEIGH STATIONS | StateWide | 1 | E. B. Morris General Contractors, Inc. | $6,091,532 | FDOT | ||
| T3861 | SR 285 FROM S OF SR 293 (MIDBAY CONNECTOR) TO WALTON CO LINE | District 3 | 2 | Anderson Columbia Co., Inc. | $6,086,126 | $6,172,095 | +1.0% | FDOT |
| T3887 | SR 296 FROM SR 10A (US 90 / MOBILE HWY) TO SR 95 (US 29 / | District 3 | 3 | C.W. Roberts Contracting, Inc. | $5,488,477 | $5,807,817 | +6.0% | FDOT |
| T7549 | OLA AVE (N RIVER BLVD / N HIGHLAND AVE / DARTMOUTH AVE) FROM | District 7 | 5 | Blacktip Services Incorporated | $5,039,033 | $5,592,627 | +11% | FDOT |
| T5804 | SR 500 (ORANGE BLOSSOM TR) FROM 39TH ST TO W GORE ST | District 5 | 2 | Chinchor Electric Inc. | $3,278,993 | $3,991,879 | +22% | FDOT |
| T9039 | SR 9 (I-95) AT YULEE NB AND SB WEIGH STATIONS | StateWide | 1 | E. B. Morris General Contractors, Inc. | $2,629,396 | FDOT | ||
| T4689 | SW 72ND ST, SW 25TH ST AND SW 33RD ST FROM PEMBROOKE RD... | District 4 | 6 | Leon America Construction | $2,216,644 | $2,272,613 | +3.0% | FDOT |
| T6567 | SR 934 (NW 79 ST) AND SR 25 (NW 36 ST) AT NW 32 AVE AND FROM | District 6 | 3 | Aum Construction Inc. | $1,669,000 | $1,756,613 | +5.0% | FDOT |
| T4687 | DISTRICTWIDE RUMBLE STRIPS AT VARIOUS | District 4 | 3 | TRP Construction Group, LLC | $1,600,545 | $1,880,465 | +17% | FDOT |
| T5826 | DISTRICTWIDE RUMBLE STRIPES AT VARIOUS LOCATIONS AS SHOWN... | District 5 | 3 | Oglesby Construction, Inc. | $1,180,815 | $1,352,604 | +15% | FDOT |
| T7539 | SR 93 (I-275) FROM SR 93 (I-275 / FRONTAGE RD EXIT RAMP AT | District 7 | 5 | Blacktip Services Incorporated | $1,109,387 | $1,190,876 | +7.0% | FDOT |
| T5827 | DISTRICTWIDE RUMBLE STRIPES AT VARIOUS LOCATIONS AS SHOWN... | District 5 | 4 | Akca, LLC | $840,386 | $857,371 | +2.0% | FDOT |
| T9037 | SR 15 (US17) AT PALATKA EB AND WB WEIGH STATIONS | StateWide | 1 | E. B. Morris General Contractors, Inc. | $755,793 | FDOT | ||
| T3921 | SR 8 (I-10) FROM E OF ESCAMBIA BAY BRIDGE TO W OF SR 281 (AV | District 3 | 4 | Chavers Construction Inc | $655,998 | $679,443 | +4.0% | FDOT |
| T5828 | DISTRICTWIDE RUMBLE STRIPES AT VARIOUS LOCATIONS AS SHOWN... | District 5 | 3 | Akca, LLC | $481,154 | $494,848 | +3.0% | FDOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than FDOT received, the others did not match their published totals and are left out.